Additional Load Sample Clauses
Additional Load. The Qualifying Facility shall notify the Company in writing of any substantial additions to or alterations in the equipment supplying electric Energy to the Company and such additions or alterations shall not be connected to the system until such notice shall have been given by the Qualifying Facility and received by the Company.
Additional Load. Customers wishing to change load shall notify the District sufficiently in advance so that the District may, if economically feasible, provide the facilities to serve the increased load. If the customer fails to notify the District and the District’s equipment is damaged, the customer shall be liable for the cost of the damage INCLUDING the cost of repairing, replacing, and/or restoring service.
Additional Load. The incremental portion of the AEL that is 5 MVA or less, shall be designated as “Additional Load” and subject to the calculation of the Developer’s fee as set forth in Section 2(b)(ii) below.
Additional Load. The service connection, transformers, meters, and equipment supplied by the Cooperative for each member have definite capacity. Member shall obtain the consent of the Cooperative prior to the addition of: i) any heated or cooled structure, and/or ii) any equipment or device that produces high-load usage, including but not limited to, welders, electric vehicle chargers, hot tubs/saunas, heated swimming pools or ponds. Failure to give notice of such additions or changes in load, and to obtain the Cooperative’s consent for same, shall render member liable for any damage to any of the Cooperative’s lines or equipment caused by the additional or changed installation.
Additional Load. The Relocation Services may also be carried out by way of transport of additional load.
Additional Load. A teacher teaching an additional instructional class in lieu of a preparation period shall be paid an additional one-eighth (1/8) of the teacher’s salary per year. The Administration shall determine what course will be offered over and above the normal working day. No teacher shall be required to take on an additional load except under extraordinary circumstances where in order to service students a course must be offered and the administration cannot, after making all reasonable efforts, find anyone to volunteer to teach the course. If the need for a teacher to take on an additional load resulted from a Reduction in Force, then the provision of Article VIII shall apply. Otherwise, procedures for filling additional load assignments will be as follows:
1. Positions will first be advertised to all teachers within the District.
2. All qualified teachers who apply will be considered for the position.
3. If more than one qualified teacher applies for the position, when selecting the teacher who will fill the position, the administration shall give consideration to certifications, qualifications, merit and ability (including performance valuations, if available), and relevant experience, provided that the length of continuing service with the school district must not be considered as a factor, unless all other factors are determined by the school district to be equal, as required by the Illinois School Code at 105 ILCS 5/24-1.5.
4. The administration shall upon request discuss the reason a teacher was not selected for a position with the teacher(s) who did not receive the position and a union representative.
5. If a qualified teacher does not apply for the position, the administration will advertise in the community for a qualified teacher.
6. If a satisfactory candidate is not found, the administration may appoint a teacher to the position.
7. No teacher shall be appointed to an additional load two years in a row.
8. No teacher shall be appointed to an additional load, if doing so will not allow him/her a planning period during one block (one class period) of the eight block schedule. ** Due to teaching during their preparation period, teachers are expected to plan on their own time in order to maintain quality instruction and lessons in all of their classes. An independent study does not qualify a teacher to be paid an additional one-eighth (1/8) of the teacher’s annual salary. An independent study must be approved in advance by the Administration. Teachers wi...
Additional Load. The service connection, transformers, meters, and equipment supplied by ▇▇▇▇▇▇ EMC for each member have definite capacity, and no addition to the equipment or load connected thereto will be allowed except by consent of ▇▇▇▇▇▇ EMC. Failure to give notice of additions or changes in load, and to obtain ▇▇▇▇▇▇ EMC’s consent for same, shall render member liable for any damage to any of ▇▇▇▇▇▇ EMC’S lines or equipment caused by the additional or changed installation.
Additional Load. The service connection, transformers, meters, and equipment supplied by BrightRidge for each Customer shall have definite capacity, and no additions to the equipment or load connected thereto will be allowed except by consent of BrightRidge. Failure to give notice of additions or changes in load, and to obtain BrightRidge consent for same, shall render Customer liable for any damage to any of BrightRidge lines or equipment caused by the additional or changed installation.