AGGREGATE BASE COURSE Clause Samples
AGGREGATE BASE COURSE. Combined Aggregate Sieve Analysis of Aggregate KT-2 a 1,000 ft each lift or if total aggregate each 500 TONS Plasticity Tests KT-10 a,c 1,000 ft each lift or if total aggregate each 500 TONS Moisture Tests KT-11 or g e Completed Base Field Density Tests KT-13 or KT-41 a 200 ft Moisture Tests KT-11, KT-41 or g e ITEM CONSTRUCTION OR MATERIAL TYPE TESTS REQUIRED TEST METHOD ACCEPTANCE SAMPLES AND TESTS
AGGREGATE BASE COURSE. Aggregate base course (ABC) used beneath hot mixed asphalt (HMA) pavements should meet the material specifications for Class 6 ABC stated in the current Colorado Department of Transportation (CDOT) “Standard Specifications for Road and Bridge Construction”. The ABC should be placed and compacted as outlined in the Site Grading section of this report.
AGGREGATE BASE COURSE. A. Base course shall be existing aggregate base re-graded and compacted. Existing base shall be supplemented with similar materials as required to meet the proposed elevations.
AGGREGATE BASE COURSE. A. Aggregate base course for bituminous paving shall be provided, installed, and paid for under the Division 31 Section, EARTH MOVING, of this Specification.