Amplified Description Clause Samples

Amplified Description. Annex 2, Amplified Description is hereby changed as follows: • The Moldova Financial Sector Transparency Activity supports economic growth and anti- corruption through improving the financial sector transparency, stability and soundness. The activity achieves this by further strengthening the capacity of the National Bank of Moldova (NBM), the Moldova Central Securities Depository (CSD) and of the Moldova National Commission for Financial Markets (NCFM) to combat financial crimes, automate the monitoring of shareholder transparency, and fight systemic money laundering in the banking sector. • The Moldova Energy Transition Activity advances the physical and market integration of Republic of Moldova's energy systems with Europe, according to the EU's Third Energy Package requirements, by supporting competitive power exchange development and facilitating Republic of Moldova's integration with neighboring energy systems, such as Romania and Ukraine. • Additionally, MISRA will implement a range of targeted interventions, in close coordination with the Government of Moldova and international donors, focusing on construction and related technical assistance to enhance Moldova’s trade and border crossing capacity. These activities include constructing extended parking areas for trucks near the border to facilitate Border Queuing Management, procuring equipment, and providing technical assistance for the development of the Berești multimodal logistics center. • The Moldova Energy Security Activity will support Moldova's energy security, independence, and resilience by diversifying energy sources, improving energy infrastructure, and strengthening the legal and regulatory frameworks in the energy sector. • The Connect for Growth (C4G) Activity will assist Moldova's energy sector institutions in market development, regulatory improvements, diversification, efficiency advancements, and enhancing system resilience. • USAID will provide support to ship goods across Moldova's territory through the rehabilitation and construction of vital transportation and transshipment infrastructure in Moldova. The project will establish alternative routes and increased capacity for imports/exports to be shipped to/from countries of the EU. Activities include the procurement of small rail shunting locomotives and freight cars (wagons) to increase the capacity and speed to handle shipments; construction of extended parking places for trucks in the vicinity with the Moldova - Romania bor...
Amplified Description. Article 3:
Amplified Description. Annex 1, attached hereto, forms part of this Agreement and describes the Indicators that will be used to measure the progress and achievement towards the Objective. Within the limits of the above definition of the Objective in Section 2.1, Annex 1 may be changed by written agreement of the Authorized Representatives, without formal amendment of this Agreement.
Amplified Description 

Related to Amplified Description

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass ▇▇▇▇▇▇. In addition to runoff conveyance, the grass ▇▇▇▇▇▇ also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off- site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12- inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1-2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after Waukesha County accepts verification of construction from the project engineer.

  • Program Description The employer agrees to provide a vision benefit to eligible employees and dependents. The vision benefit provided by the State shall have an employee co-payment of $10 for the comprehensive annual eye examination and $25 for materials.

  • Short description Post-Bachelor's

  • Service Description 2.1 General