APPLICATION PHASE Clause Samples

APPLICATION PHASE. Sets out an agreed time period and structure for determination of the planning application.
APPLICATION PHASE. 3.1. During the Application Phase, the parties shall collaborate on identifying significant areas that could benefit from nanotechnology applications. The parties shall jointly structure a mutually beneficial research and development program to develop such nanotechnology applications. 3.2. [Insert additional provisions that are relevant to the Application phase are reported in exibit B].
APPLICATION PHASE. The weights after the preset SSE is achieved in the training phase is used in this phase for new BAP application to reach the interactive consistency conditions. This application phase is the same with the feed forward C 1 L1 L2 L3 (a) First round of message exchange C L1 L2 1 0 L3 0 (b) Second round of message exchange C 110 110 L1 L2 110 110 000 L3 000 (c) Third round of message exchange
APPLICATION PHASE. In this phase any interested entity fills the application form F 1 A / 100 for ISO certificates and F 1 A / 100-4 for HALAL certificate that is available on our website, or can be sought from ACERTA MIDDLE EAST (ME).
APPLICATION PHASE. Applicant intended submission date: 18th September 2023 [1] w/c 18th September 2023 Applicant to submit the planning application. MBC to register and validate the application; and a) send out consultation letters/advertising the application; or b) inform the Applicant if application is invalid Financial Viability [if applicable] If not already undertaken at the pre-application stage MBC will request a quote(s) from independent viability consultants and send to the applicant for agreement. [2] Subject to submission of a valid application 25th September 2023 -9th October Statutory consultation period begins Review of submitted information by externally appointed consultants (if applicable) MBC to ensure all consultee responses are publicly accessible. Review of submitted information by externally appointed consultants. (Obtain any update on revised consultant costs (as necessary) [5] 16th October 2023 End of Statutory consultation period 1 x meeting with planners to discuss any matters they have and consultee responses. Case officer to confirm all outstanding issues to be addressed (such as objectors comments, statutory consultee responses etc). Draft S106 Heads of Terms to be discussed 1 x meeting with consultees if appropriate where possible [6-7] 23rd October 2023 – 30th October 2023 Applicant to address any outstanding issues/prepare amended plans (as necessary) [8 - 10] 6th November 2023 – 20th November 2023 MBC to potentially re-consult on any additional information/amended details and agree any revision to timescales. Draft S106 Heads of Terms to be finalised and agreed Legal teams instructed to prepare draft S106 (subject to applicant undertaking to paying costs). 1 x meeting with legal and planning on draft heads (if necessary) [14-15] To applicant: w/c 4 January 2024 To public: 11th November 2023 Publication of MBC Planning Committee Report [16] The week the Committee meeting falls on will depend on the Committee timetable and submission date 18th January 2024 Planning Committee meeting [25] 18th March 2024 MBC issue planning decision notice Maidstone Borough Council and the Applicant hereby agree to the content of this Planning Performance Agreement. Name: ▇▇▇▇▇▇ ▇▇▇▇▇ Signature: Position: Principal Planning Officer On Behalf Of: Maidstone Borough Council
APPLICATION PHASE. Nanoworld - Centro
APPLICATION PHASE. 5.8.2.1. The Professional shall schedule and attend one (1) application meeting with NBU and other consultants including NBU’s financial advisor and bond counsel to discuss roles and application process. The Professional will be required to submit TWDB-0217. 5.8.2.2. The Professional shall prepare and submit one (1) full application with NBU, NBU’s financial advisor, and NBU’s bond counsel for relevant non-engineering related information. 5.8.2.3. The Professional shall coordinate with TWDB throughout the application review to address comments and provide additional information as necessary. 5.8.2.4. The Professional shall review TWDB’s “Board Memorandum” prior to TWDB staff’s recommendation of funding presentation to TWDB board. 5.8.2.5. The Professional shall attend the TWDB’s Board Meeting where funding request is submitted for TWDB Board commitment of funds. 5.8.2.6. The Professional shall assist, NBU’s financial advisor, and NBU’s bond counsel in the TWDB funding closing process.
APPLICATION PHASE. In this phase any interested entity fills the application form F 1 A / 100 that is available on our website, or can be sought from ACERTA MIDDLE EAST (ME).

Related to APPLICATION PHASE

  • Construction Phase Part 1 –

  • Design Phase All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. • All Basic Services set forth in the Agreement. • All Basic Services set forth in the Agreement. • All Basic Services set forth in the Agreement.

  • Preconstruction Phase The Preconstruction Phase shall mean the period commencing on the date of this CM/GC Contract and ending upon commencement of the Construction Phase; provided that if the Owner and CM/GC agree, the Construction Phase may commence before the Preconstruction Phase is completed, in which case both phases shall proceed concurrently, subject to the terms and conditions of the Contract Documents.

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.

  • Production Phase contract period in which the Development and the Production are to be performed.