Area of Study Sample Clauses

Area of Study. The leave is taken for accredited advance study in the teacher's major area of concentration; provided, however, that the Superintendent may request leave for such teachers for retraining in a new area.
Area of Study. The study area encompasses the area surrounding the City of Box Elder, South Dakota indicated in the map below.
Area of Study. You also have the option to access one area of study of your choice for $1,995 for one academic year of unlimited access and users.
Area of Study. The counts of seabirds associated with the longline fishery during the period of study (2005-2008) (n = 415) are represented. The isobaths of 200 and 3000 meters are shown to indicate the region of the continental slope. MA CHA PAC PSDPE JU TCH STETME FGL AU JUL DCMAAC DEP TST D CDI AP PIN PAR OOC ST N H DSA DEXO PMO FFRTEER SPL LPMCAI PHF PPU M F SPO CED SPPAUETD FCAL LAR Species Months 1.5 Axis 2 (23.04% of Inertia) 0.0 Figure 2. Correspondence analysis of the temporal variation of abundance and richness of seabirds associated with the pelagic longline fishery on the continental slope of Uruguay and adjacent waters (2005-2008). Black points represent months of the year [F = February, M = March, AP = April, MA = May, JU = June, JUL = July, AU = August, S = September, O = October, N = November, D = December] and circles represent species. Species whose codes are represented in a larger font and in bold explained more than 5% of the variance, at least for one axis. The codes for the species are explained in Table 2. Figure 3. Sample-based rarefaction curve for the assemblage of seabirds associated with the pelagic longline fishery on the Uruguayan continental slope and adjacent waters (2005- 2008). We show the curve obtained for the total period of the study (n = 415 counts), and for the periods October-April (n = 196 counts) and May-September (n = 219 counts).
Area of Study. The Area of Study is primarily focused on the Main Street Core. However, information may be prepared for the Downtown Area, and the City of ▇▇▇▇ in the completion of the Scope of Work. These areas are identified on Exhibit “A”, Areas of Study.
Area of Study. A specific branch of learning as designated by the state or DISTRICT Board
Area of Study. Describe the general subject matter anticipated for the research. I certify I have read the guidelines for the Thesis or Dissertation, including IRB Process, Format Approval, Examination Schedule, and 12-Step Graduation Checklist. Student Signature
Area of Study. A specific branch of learning at various developmental levels, as designated by the state or school district governing board.

Related to Area of Study

  • Feasibility Study Buyer is granted the right to conduct engineering and/or market and economic feasibility studies of the Property and a physical inspection of the Property, including studies or inspections to determine the existence of any environmental hazards or conditions (collectively, the “Feasibility Study”) during the period (the “Feasibility Period”) commencing on the Effective Date and ending at 5:00 p.m., Central Time, on the June 3, 2010. With Seller’s permission, after Seller has received advance notice sufficient to permit it to schedule in an orderly manner Buyer’s examination of the Property and to provide at least 24-hours’ advance written notice to any affected tenants, Buyer or its designated agents may enter upon the Property during normal business hours for purposes of analysis or other tests and inspections which may be deemed necessary by Buyer for the Feasibility Study. Buyer or its designated representative must be accompanied by a designated representative of Seller or have received Seller’s written permission prior to entering upon the Property in connection with Buyer’s Feasibility Study; provided, however, Buyer may not enter into any space leased by any tenant without being accompanied by a designated representative of Seller. Seller agrees to make its representative reasonably available during normal business hours. Buyer will not alter the physical condition of the Property or conduct invasive testing without notifying Seller of its requested tests, and obtaining the written consent of Seller to any physical alteration of the Property or invasive testing. Buyer will utilize commercially reasonable diligence to conduct or cause to be conducted all inspections and tests in a manner and at times which will not unreasonably interfere with any tenant’s use and occupancy of the Property. If Buyer determines, in its sole judgment, that the Property is not suitable for any reason for Buyer’s intended use or purpose, or is not in satisfactory condition, then Buyer may terminate this Contract by written notice to Seller prior to expiration of the Feasibility Period, in which case the ▇▇▇▇▇▇▇ Money (other than the Option Money) will be returned to Buyer, and neither party shall have any further right or obligation hereunder other than as set forth herein with respect to rights or obligations which survive termination. If this Contract is not terminated pursuant to this Section 5(a), then after expiration of the Feasibility Period, after Seller has received advance notice sufficient to permit it to schedule in an orderly manner Buyer’s examination of the Property and to provide at least 24-hours’ advance written notice to any affected tenants, Buyer or its designated agents may enter upon the Property during normal business hours. Buyer or its designated representative must be accompanied by a designated representative of Seller or have received Seller’s written permission prior to entering upon the Property; provided, however, Buyer may not enter into any space leased by any tenant without being accompanied by a designated representative of Seller. If this Contract is not timely terminated pursuant to this Section 5(a), Buyer’s right to terminate this Contract pursuant to this Section 5(a) and any and all objections with respect to the Feasibility Study will be deemed to have been waived by Buyer for all purposes.

  • Work Plan [Procuring Entity shall provide main features of the work plan that the Tenderer should provide in the tender for carrying out the contract, from beginning to the end].

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Development Work The Support Standards do not include development work either (i) on software not licensed from CentralSquare or (ii) development work for enhancements or features that are outside the documented functionality of the Solutions, except such work as may be specifically purchased and outlined in Exhibit 1. CentralSquare retains all Intellectual Property Rights in development work performed and Customer may request consulting and development work from CentralSquare as a separate billable service.

  • PROJECT WORK PLAN The Statement of Work is the formal document incorporated into the Grant. The Project Work Plan documents how the Grantee will achieve the performance measures outlined in the Grant. Changes to the Statement of Work require an amendment. Project Work Plans may be changed with written approval from DFPS and the Grantee.