Astrobee. Astrobee will utilize several unique ▇▇▇▇ Research Center (ARC) facilities for prototype development and testing. These facilities already exist and are used for small satellite development and testing. Some of these facilities may require modification to be used with Astrobee. Astrobee will require the use of the ARC SPHERES Granite Lab located in ARC Building N269. This lab has an air-bearing table used for 2-DOF testing of satellites that sit on an air-bearing pallet. This allows the satellite to translate along the x and y-axes, and yaw about the z-axis. The SPHERES Granite Lab is actively used by the SPHERES Program, and as the primary Astrobee customer, they will modify the lab to conduct Astrobee testing as well. Astrobee will also require the use of the ARC Micro Gravity Test Facility (MGTF) located in ARC Building N269. This lab suspends a satellite in free space, which allows testing translation in three axes, as well as yaw about the z-axis. This lab is maintained by the SPHERES Program, and will be upgraded for Astrobee. Additional ground based testing will be performed in the ARC Generalized Nanosatellite Testbed (GNAT) located in ARC Building N213. This lab is used for avionics, software and sensor testing. This lab also includes a spherical air bearing, which will be used to test pointing in 3 axes. Finally, Astrobee has already been approved as a payload, and specific Astrobee requirements for ISS integration are being documented in a ISS Payload Integration Agreement (PIA).
Astrobee. During FY15, two controlled (Level 1) milestones were achieved: (1) Completion of Prototype 2 testing, and (2) Completion of Prototype 3 testing. In addition, two Periodic Technical Reviews (PTR) were conducted. PTR #1 reviewed system/subsystem requirements, Prototype 2 test results, and Prototype 3 test plans. PTR #2 reviewed Astrobee preliminary design, Prototype 3 test results, and Prototype 4 test plans. During FY16, one controlled milestone will be achieved; completion of Prototype 4 testing. PTR #3 will review Prototype 4 test results, Cert and Flight Unit development plans, and Cert and Flight Unit testing plans. During FY17, two controlled milestones will be achieved: (1) Completion of Cert Unit testing and (2) Completion of Flight Unit testing. PTR #4 will review Cert Unit test results, and PTR #5 will close out the Element work. During FY18, two controlled milestones will be achieved: (1) Astrobee’s first flight and basic mobility test and (2) Astrobee operations demonstration.
Astrobee. The Astrobee Element (FY15 to FY18) will focus on developing a new free-flying robot suitable for performing IVA work on the ISS. The new robot will build upon technology and lessons learned from the Smart Synchronized Position Hold, Engage, Reorient, Experimental Satellite (SPHERES) robot, which was developed and tested by the Human Exploration Telerobotics (HET) project under the Technology Demonstration Missions (TDM) program. Astrobee will be designed to address a variety of scenarios, which will be developed and detailed in collaboration with the Advanced Exploration Systems (AES) program and the ISS SPHERES Facility in the Human Exploration and Operations Mission Directorate (HEOMD). Candidate scenarios include mobile sensor (including imagers), automated logistics (e.g., mobile inventory), and free-flying robotic testbed. Success for Astrobee involves developing and testing robot technologies required for autonomous operations (including free-flying mobility), remote operation by ground controllers, and human-robot interaction with crew. These technologies include propulsion, robot user interface (proximal and remote), supervisory control, payload interface, and/or navigation. Successful on-orbit testing and demonstration of these technologies following the ISS payload process will bring the system to TRL 8. Table 1 specifies which capabilities must be demonstrated for minimum and full success.

Related to Astrobee

  • LOKASI ▇▇▇ KETERANGAN HARTANAH Hartanah tersebut adalah terletak di tingkat 6 Pangsapuri Mesra Ria. Hartanah tersebut adalah pangsapuri kos rendah 3 ▇▇▇▇▇ tidur pertengahan dikenali sebagai ▇▇▇▇▇ Pemaju No. A-06-06, Tingkat No 06, Bangunan No A, Pandan Mesra ▇▇▇ beralamat pos di No. 06-06, Pangsapuri Mesra Ria, ▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇. (“Hartanah”) Hartanah ini akan dijual keadaan “sepertimana sedia ada” tertakluk kepada satu harga rizab sebanyak RM150,000.00 (RINGGIT MALAYSIA SATU RATUS ▇▇▇ ▇▇▇▇ PULUH RIBU SAHAJA), mengikut kepada Syarat-syarat Jualan di sini dengan cara Penyerahan Hak dari Pemegang Serahhak ▇▇▇ tertakluk kepada Pembeli memperoleh pengesahan / kebenaran yang diperlukan daripada Pemaju ▇▇▇/atau Pemilik Tanah ▇▇▇/atau Pihak Berkuasa Negeri ▇▇▇/atau badan-badan yang relevan (jika ada). Semua penawar yang ingin membuat tawaran adalah dikehendaki membayar deposit sebanyak 10% daripada harga rizab (“deposit pendahuluan”) secara bank draf atau kasyier order dipalang “AKAUN PENERIMA SAHAJA” atas nama HONG ▇▇▇▇▇ BANK BERHAD / ▇▇▇ ▇▇▇ ▇▇▇▇ & ▇▇▇▇ ▇▇▇ MEE @ ▇▇▇▇ NYUIK THAI atau melalui pemindahan perbankan atas talian yang ditentukan oleh pelelong, sekurang-kurangnya SATU (1) HARI BEKERJA SEBELUM TARIKH LELONGAN ▇▇▇ membayar perbezaan di antara deposit pendahuluan ▇▇▇ jumlah bersamaan 10% daripada harga berjaya tawaran sama ada dengan bank draf atau kasyier order dipalang “AKAUN PENERIMA SAHAJA” atas nama ▇▇▇▇ ▇▇▇▇▇ BANK BERHAD / ▇▇▇ ▇▇▇ ▇▇▇▇ & ▇▇▇▇ ▇▇▇ MEE @ ▇▇▇▇ NYUIK THAI atau melalui pemindahan perbankan atas talian dalam masa TIGA (3) HARI BEKERJA sebaik sahaja ketukan tukul oleh Pelelong dibuat. Deposit ▇▇▇▇ ▇▇▇ jumlah perbezaan secara dikumpul dikenali sebagai “deposit”. Hari Bekerja bermaksud hari (tidak termasuk Sabtu, Ahad ▇▇▇ ▇▇▇▇ Umum) di mana Pihak Pemegang Serahhak dibuka untuk perniagaan di Kuala Lumpur Baki harga belian sepenuhnya hendaklah dibayar dalam tempoh sembilan puluh (90) hari dari tarikh jualan lelongan kepada HONG ▇▇▇▇▇ BANK BERHAD. ▇▇▇▇ rujuk Terma & Syarat Dalam Talian Pelelong di ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ untuk ▇▇▇▇-▇▇▇▇ pembayaran deposit. Untuk butir-butir lanjut, ▇▇▇▇ berhubung dengan Tetuan ▇▇▇ ▇▇▇▇ & Co., Peguamcara bagi Pihak Pemegang Serahhak di ▇-▇, ▇▇▇▇▇ ▇▇▇ ▇/▇, ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇, ▇▇▇▇▇▇▇▇. (Ref No.: 51303.23, Tel No.: ▇▇-▇▇▇▇▇▇▇▇, Fax No.: ▇▇-▇▇▇▇▇▇▇▇) atau Pelelong yang tersebut di bawah ini:- Suite C-20-3A, Level 20, Block C, Megan Avenue II, / ▇▇▇▇▇ ▇▇▇▇▇ BIN ▇▇▇▇▇▇ ▇▇, ▇▇▇▇▇ ▇▇▇ ▇▇▇▇ ▇▇▇▇, 50450 Kuala Lumpur. (Pelelong Berlesen) Tel No : ▇▇-▇▇▇▇ ▇▇▇▇ Fax No: ▇▇-▇▇▇▇ ▇▇▇▇ Ruj. Kami: ALIN/HLBB1604/WCC Ruj Bank : ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇ Web: ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ E-mail : ▇▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇

  • Vlastnictví Zdravotnické zařízení si ponechá a bude uchovávat Zdravotní záznamy. Zdravotnické zařízení a Zkoušející převedou na Zadavatele veškerá svá práva, nároky a tituly, včetně práv duševního vlastnictví k Důvěrným informacím (ve smyslu níže uvedeném) a k jakýmkoli jiným Studijním datům a údajům.

  • Přetrvávající platnost Tento odstavec 1.3 “Zdravotní záznamy a Studijní data a údaje” zůstane závazný i v případě zániku platnosti či vypršení platnosti této Smlouvy.

  • VOETSTOOTS The PROPERTY is sold: 8.1. Voetstoots in accordance with the Sectional Plan and the participation quota endorsed thereon with the opening of the Sectional Title Register, or as they are endorsed already, and any amendments or adjustments thereto from time to time in accordance with the terms of the Act and without any warranties express or implied, the SELLER shall not be liable for any patent or latent defects. Should the extent of the Section or of the PROPERTY differ from that which is contained in the title deed or sectional plan or any amendment thereto, the SELLER shall not be liable for any shortfall or be entitled to any compensation for any surplus. 8.2. Subject to all the conditions and Regulations of the Act. 8.3. The PURCHASER acknowledges that this is not a construction contract and that he is purchasing a completed unit. The PURCHASER shall not have the right to interfere in any way with the building operations of the SELLER’S employees. He shall also have no right to retention. This Clause is also applicable in the case of the bank holding back any retention amount out of its own accord or on request of the PURCHASER. 8.4. The SELLER undertakes to erect the unit according to the general building standards as set by Financial Institutions. The unit is be registered with the NHBRC. 8.5. Should a dispute arise or be declared, such dispute shall be resolved by an Arbitrator appointed by the Developer. The costs in respect thereof shall be borne by the unsuccessful party. Pending the outcome of the dispute, the PURCHASER shall be obliged to pay the outstanding amount to the Conveyancers who shall hold it in trust.

  • meminta nasihat daripada Pihak ▇▇▇▇▇▇ dalam semua perkara berkenaan dengan jualan lelongan, termasuk Syarat-syarat Jualan (iii) membuat carian Hakmilik ▇▇▇▇▇ ▇▇▇▇▇▇ rasmi di Pejabat Tanah ▇▇▇/atau ▇▇▇▇-▇▇▇▇ Pihak-pihak Berkuasa yang berkenaan ▇▇▇ (iv) membuat pertanyaan dengan Pihak Berkuasa yang berkenaan samada jualan ini terbuka kepada semua bangsa atau kaum Bumiputra Warganegara Malaysia sahaja atau melayu sahaja ▇▇▇ juga mengenai persetujuan untuk jualan ini sebelum jualan lelong.Penawar yang berjaya ("Pembeli") dikehendaki dengan segera memohon ▇▇▇ mendapatkan kebenaran pindahmilik (jika ada) daripada Pihak Pemaju ▇▇▇/atau Pihak Tuanpunya ▇▇▇/atau Pihak Berkuasa Negeri atau badan-badan berkenaan (v) memeriksa ▇▇▇ memastikan samada jualan ini dikenakan cukai. HAKMILIK : Hakmilik strata bagi hartanah ini masih belum dikeluarkan HAKMILIK INDUK / NO. LOT : Pajakan Negeri 35263, Lot No.29096 MUKIM/DAERAH/NEGERI : Setapak / Kuala Lumpur / Wilayah Persekutuan Kuala Lumpur PEGANGAN : Pajakan selama 82-tahun berakhir pada 08/08/2085 KELUASAN LANTAI : 81.104 meter persegi ( 873 kaki persegi ) PEMAJU/PENJUAL : Mega Planner Jaya Sdn Bhd (326287-W)(Dalam Likuidasi) TUANPUNYA : Datuk Bandar Kuala Lumpur PEMBELI : ▇▇▇▇▇▇▇▇ Bin ▇▇▇▇▇ @ ▇▇▇▇ BEBANAN : Diserahhak kepada RHB Bank Berhad [196501000373 (6171-M)] Hartanah tersebut terletak di tingkat 9 pada bangunan apartment 14-tingkat terletak di Melati Impian Apartment, Setapak Fasa 1, Kuala Lumpur. Hartanah tersebut adalah sebuah unit apartment 3 ▇▇▇▇▇ dikenali sebaga ▇▇▇▇▇ Pemaju No. 9, Tingkat No.9, Pembangunan dikenali sebagai Melati Impian Apartment Setapak Fasa 1, Kuala Lumpur ▇▇▇ mempunyai alamat surat-▇▇▇▇▇▇▇▇ ▇▇ ▇▇▇▇ ▇▇. ▇-▇, ▇▇▇▇▇▇ Impian Apartment, ▇▇▇▇▇ ▇/▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇. Harta ini dijual “keadaan seperti mana sediada” dengan harga rizab sebanyak RM 300,000.00 (RINGGIT MALAYSIA: TIGA RATUS RIBU SAHAJA) ▇▇▇ tertakluk kepada syarat-syarat Jualan ▇▇▇ melalui penyerahan hakkan dari Pemegang Serahak, tertakluk kepada kelulusan di perolehi oleh pihak Pembeli daripada pihak berkuasa, jika ada, termasuk semua terma, syarat ▇▇▇ perjanjian yang dikenakan ▇▇▇ mungkin dikenakan oleh Pihak Berkuasa yang berkenaan. Pembeli bertanggungjawab sepenuhnya untuk memperolehi ▇▇▇ mematuhi syarat-syarat berkenaan daripada Pihak Berkuasa yang berkenaan, jika ada ▇▇▇ semua ▇▇▇ ▇▇▇ perbelanjaan ditanggung ▇▇▇ dibayar oleh ▇▇▇▇▇ ▇▇▇▇▇▇▇.Pembeli atas talian (online) juga tertakluk kepada terma-terma ▇▇▇ syarat-syarat terkandung dalam ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Pembeli yang berminat adalah dikehendaki mendeposit kepada Pelelong 10% daripada harga rizab dalam bentuk Bank Draf atau Cashier’s Order di atas nama RHB Bank Berhad sebelum lelongan awam ▇▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇ hendaklah dibayar dalam tempoh sembilan puluh (90) hari dari tarikh lelongan kepada RHB Bank Berhad melalui Bank Draf / ▇▇▇▇▇▇. Butir-butir pembayaran melalui ▇▇▇▇▇▇, ▇▇▇▇ berhubung dengan Tetuan Zahrin Emrad & Sujaihah. Untuk maklumat lanjut, ▇▇▇▇ berhubung dengan TETUAN ZAHRIN EMRAD & SUJIAHAH, yang beralamat di Suite 10.3, 10th Floor, ▇▇▇ ▇▇▇▇ Building, ▇▇.▇▇, ▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇. Tel: ▇▇-▇▇▇▇ ▇▇▇▇ / Fax: ▇▇-▇▇▇▇ ▇▇▇▇. [ Ruj: ZES/ZHR/RHB-FC/16250-17/0614-pae ], peguamcara bagi pihak pemegang ▇▇▇▇▇ ▇▇▇ atau pelelong yang tersebut dibawah.