Basic Project Information Sample Clauses
Basic Project Information. 1.1.1. This Monthly Environmental Monitoring and Audit (EM&A) Report is prepared for Contract HY/2013/02 “Hong Kong–Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities (HKBCF) – Infrastructure Works Stage I (Western Portion)” (hereafter referred to as “the Contract”) for the Highways Department of Hong Kong Special Administrative Region (HKSAR). The Contract was awarded to China Harbour Engineering Co., Ltd. (hereafter referred to as “the Contractor”) and ETS-Testconsult Limited was appointed as the Environmental Team (ET) by the Contractor.
1.1.2. The Contract is part of Hong Kong–Zhuhai–Macao Bridge HKBCF which is a “Designated Project”, under Schedule 2 of the Environmental Impact Assessment Ordinance (EIAO) (Cap 499) and Environmental Impact Assessment (EIA) Report (Register No. AEIAR-145/2009) was prepared for the Project. The current Environmental Permit (EP) No. EP-353/2009/K for HKBCF was issued on 11 April 2016. These documents are available through the EIA Ordinance Register. Site preparation works of the Contract started on 25 July 2014 and the construction works of the Contract commenced on 24 November 2014. The works area of the Contract is shown in Appendix A.
1.1.3. The proposed works under this Contract comprise the following:
1.1.4. This is the forty-fourth Monthly Environmental Monitoring and Audit (EM&A) Report for the Contract which summaries the audit findings of the EM&A programme during the reporting period from 01 July to 31 July 2018.
Basic Project Information. Project Name: Project Location: CLIENT Representative: ▇▇▇▇▇▇ Representative:
Basic Project Information. Project Start Date: November 11, 2024 Project End Date: June 30, 2025 ▇▇▇▇ Supervisor: ▇▇▇▇ ▇▇▇▇▇▇ SOW Payment: CORI will issue a monthly invoice to the client for work completed. The total invoiced amount for the project is not to exceed $40,000. Hourly rates for ▇▇▇▇ team members are listed below.
Basic Project Information. Project number and title, Principal Investigator(s) and affiliations, participating agencies, and keywords for this project.
Basic Project Information. Project Name: SAMPLE Project Number: Project Location: COUNTY Representative: CONTRACTOR Representative:
Basic Project Information. 1.1.1 This Monthly Environmental Monitoring and Audit (EM&A) Report is prepared for ▇▇▇▇▇▇▇▇ ▇▇/▇▇▇▇/▇▇ ▇▇▇▇ ▇▇▇▇–▇▇▇▇▇▇-▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇ Boundary Crossing Facilities (HKBCF) – Infrastructure Works Stage I (Western Portion) (hereafter referred to as “the Contract”) for the Highways Department of Hong Kong Special Administrative Region (HKSAR). The Contract was awarded to China Harbour Engineering Co., Ltd. (hereafter referred to as “the Contractor”) and ETS-Testconsult Limited was appointed as the Environmental Team (ET)
Basic Project Information. A Bidder may make changes to information provided in the Pre-Qualification Application under Items 2-4 below. Additional information related to the anticipated output of the Project is required by Item 5.