Computer Aided Drafting Design (CADD Clause Samples

The Computer Aided Drafting Design (CADD) clause defines the requirements and standards for the preparation, submission, and use of digital design documents created using CADD software. It typically specifies the acceptable file formats, naming conventions, and software versions that must be used, and may require that all design drawings and related documents be delivered in both electronic and hard copy formats. This clause ensures consistency, compatibility, and efficient exchange of design information between parties, reducing errors and streamlining project coordination.
Computer Aided Drafting Design (CADD. The Contractor shall create all drawings/designs in an AutoCAD compatible digital format under the direction of licensed professionals and meet Judicial Council standards and guidelines. Contractor shall provide as-built drawing management and produce non-design drawings and documents. Contractor shall post all required changes to appropriate record drawings within sixty (60) Business Days of Acceptance.
Computer Aided Drafting Design (CADD. This specification addresses the submission of digital CADD files to the NJDOT. When the submission of CADD files is not a requirement of the Agreement and the Department later determines that such a submission is necessary, then the Consultant’s submitted CADD files must comply with the Minimum Requirements and Media Requirements detailed near the end of this Article. If it is specified in the original Agreement that digital CADD files will be exchanged with the NJDOT, then all of the following requirements apply.

Related to Computer Aided Drafting Design (CADD

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.

  • LIMITATIONS ON REVERSE ENGINEERING, DECOMPILATION AND DISASSEMBLY You may not reverse engineer, decompile, or disassemble the Software, except and only to the extent that such activity is expressly permitted by applicable law notwithstanding this limitation.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Alternative Work Schedules Employees may request alternative work schedules such as a nine (9) day - 80 hour two week schedule or a four (4) day - 40 hour week schedule. Management will respond to an employee's request within 15 calendar days. Any changes from existing work schedules will be based on the needs of the service as determined by Management. Employees covered by the Fair Labor Standards Act will not be placed on alternate work schedules that mandate the payment of overtime under the Act.