Survey File Requirements Clause Samples

Survey File Requirements. Where field survey information is to be submitted for the Department’s use, strict adherence to the standards shown in the following formats as required by project scope of work is expected: English Projects – Adherence to DOT CADD English Standards is mandatory. When English survey data is required, it will be collected electronically utilizing: The Control Codes for the current Survey application in use at the NJDOT and the NJDOT English Feature/Preference Codes. The deliverables will be the files produced by the current Survey application in use at the NJDOT resulting from data capture from Field Surveys. The original and edited field files will be provided to the Department as records of the survey. In the event that some other software is used to produce the engineering or survey data for a project, the Department may choose to accept data in ASCII format. The NJDOT CADD Development Unit should be contacted for direction and approval in this regard. Responsibility for correcting any file errors rests with the file provider.
Survey File Requirements. Where field survey information is to be submitted for the Department’s use, strict adherence to the standards shown in the following formats as required by project scope of work is expected: Metric Projects - Adherence to DOT CADD Metric Standards Manual is mandatory. When Metric survey data is required, it will be collected electronically utilizing: The Control Codes for the Bentley Systems SelectCAD Survey product and the NJDOT Metric Feature/Preference Codes. The deliverables will be the files produced by the SelectCAD Survey product (.FWD) resulting from input from RW5 format field files. The original and edited field files (RW5 format) will be provided to the Department as records of the survey. English Projects – Adherence to DOT CADD English Standards is mandatory. When English survey data is required, it will be collected electronically utilizing: The Control Codes for the current Survey application in use at the NJDOT and the NJDOT English Feature/Preference Codes. The deliverables will be the files produced by the current Survey application in use at the NJDOT resulting from data capture from Field Surveys. The original and edited field files will be provided to the Department as records of the survey. In the event that some other software is used to produce the engineering or survey data for a project, the Department may choose to accept data in ASCII format. The NJDOT CADD Development Unit should be contacted for direction and approval in this regard. Responsibility for correcting any file errors rests with the file provider.

Related to Survey File Requirements

  • Vehicle Requirements The following shall be considered minimum Vehicle requirements. The Authorized User shall include supplemental required specifications for Vehicles specified in a Mini-Bid. Unless otherwise indicated, all items specified which are listed on the OEM Pricelist as standard or optional equipment shall be factory installed and operative. Vehicles delivered to an Authorized User in a condition considered to be below retail customer acceptance levels will not be accepted. Items which determine this acceptance level shall include, but not be limited to, the general appearance of the interior and exterior of the vehicle for completeness and quality of workmanship, lubrication and fluid levels, with any leaks corrected, mechanical operation of the vehicle and all electrical components operational. Product specified to be furnished and installed which is not available through the OEM shall conform to the standards known to that particular industry, both product and installation.

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.

  • Interface Requirements 2.4.5.1 The NID shall be equal to or better than all of the requirements for NIDs set forth in the applicable industry standard technical references.

  • Time Requirements The Independent Contractor will not be required to follow or establish a regular or daily work schedule, but shall devote during the term of this Agreement the time, energy and skill as necessary to perform the services of this engagement and shall, periodically or at any time upon the request of the Company, submit information as to the amount of time worked and scope of work performed.

  • DBE Requirements A. Notice is hereby given to the CONSULTANT and any SUB-CONSULTANT, and both agree, that failure to carry out the requirements set forth in 49 CFR Sec. 26.13(b) shall constitute a breach of this Contract and, after notification and failure to promptly cure such breach, may result in termination of this Contract or such remedy as INDOT deems appropriate. The referenced section requires the following assurance to be included in all subsequent contracts between the CONSULTANT and any SUB-CONSULTANT: The CONSULTANT, sub recipient or SUB-CONSULTANT shall not discriminate on the basis of race, color, national origin, or sex in the performance of this Contract. The CONSULTANT shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the CONSULTANT to carry out these requirements is a material breach of this Contract, which may result in the termination of this Contract or such other remedy, as INDOT, as the recipient, deems appropriate. B. The CONSULTANT shall make good faith efforts to achieve the DBE percentage goal that may be included as part of this Contract with the approved DBE SUB-CONSULTANTS identified on its Affirmative Action Certification submitted with its Letter of Interest, or with approved amendments. Any changes to a DBE firm listed in the Affirmative Action Certification must be requested in writing and receive prior approval by the LPA and INDOT’s Economic Opportunity Division Director. After this Contract is completed and if a DBE SUB- CONSULTANT has performed services thereon, the CONSULTANT must complete, and return, a Disadvantaged Business Enterprise Utilization Affidavit (“DBE-3 Form”) to INDOT’s Economic Opportunity Division Director. The DBE-3 Form requires certification by the CONSULTANT AND DBE SUB-CONSULTANT that the committed contract amounts have been paid and received.