Construction Document Phase (Working Drawings Sample Clauses

Construction Document Phase (Working Drawings a. The ARCHITECT shall prepare, from the Design Development Documents approved by the DISTRICT, Construction Documents (in an acceptable Building Informational Modeling format, such as Autodesk® Revit® and AutoCAD® Civil 3D®) including, but not limited to, all drawings and specifications for the PROJECT setting forth, in detail, the requirements for the construction of the entire PROJECT in conformity with all applicable (on and off site) governmental and code requirements including, but not limited to, the requirements of the State Chancellor, DSA, the local fire marshal/department, the County Health Department and any other governmental agency having jurisdiction over the PROJECT. The Construction Documents shall show all the work to be done in a minimum Level of Design (“LOD”) 300, as well as the materials, workmanship, finishes, and equipment required for the completion of the PROJECT. All Construction Documents prepared by the ARCHITECT shall be properly coordinated including, but not limited to, the various disciplines, dimensions, terminology, details, etc. ARCHITECT shall submit 60% and 100% Construction Documents as required herein and pursuant to EXHIBIT “I”. b. Prior to listing any specific equipment, material, supply, or furnishing, ARCHITECT shall verify, list and identify lead times, performance specifications, quality, durability, maintenance requirements to ensure compliance with District facility design standards, including, proper coordination with sub-consultants and availability of all PROJECT equipment, materials, supplies, and furnishings and ensure that all of these will be available to the contractor(s) in a timely fashion so as to not delay the PROJECT and/or delay the DISTRICT’s beneficial occupancy of the PROJECT. The ARCHITECT shall also provide other options to the DISTRICT regarding other possible and more available equipment, materials, supplies, or furnishings.‌ c. The ARCHITECT shall identify all tests and special inspections on the Statement of Structural Tests and Special Inspections (Form DSA 103) that are required for the completion of the PROJECT as designed and submit such DSA 103 to DSA for approval along with all other Construction Documents. Upon DSA’s approval of the Construction Documents, including the approved DSA 103 for the PROJECT, the ARCHITECT shall ensure that a copy of the approved DSA 103 for the PROJECT is provided to the DISTRICT, the Laboratory of Record, each Special Inspector working on the PROJECT,...

Related to Construction Document Phase (Working Drawings

  • CONTRACT DOCUMENTS This Contract consists of these Terms and Conditions and the documents ("Exhibits") listed below in descending order of precedence. A conflict in these documents shall be resolved in the priority listed below with these Terms and Conditions taking precedence over all other documents. The Exhibits to this Contract include the following documents:

  • Scope of Work For the 2022/2023 Grant Period, the Provider will maintain a victim services program that will be available to provide direct services to victims of crime who are identified by the Provider or are presented to the Provider, as specified in the Provider’s 2022/2023 Grant Application as approved by the OAG and incorporated herein by reference.

  • Deliverables Upon satisfactory completion of the work authorization, the Engineer shall submit the deliverables as specified in the executed work authorization to the State for review and acceptance.

  • Hours of Work i) Where employees are now working a longer daily tour, the provisions set out in this Article governing the regular hours of work on a daily tour shall be adjusted accordingly. ii) The normal daily extended tour shall be 11.25 consecutive hours in any 24-hour period, exclusive of a total of forty-five (45) minutes of unpaid meal time. For hybrid schedules, there will be scheduled normal daily tours of seven and one-half (7½) hours and 11.25 consecutive hours per day. iii) Employees working an extended tour shall be entitled, subject to the exigencies of resident care, to paid relief periods during the tour of a total of forty-five (45) minutes. For hybrid schedules, there will also be shifts that provide for relief periods in accordance with Article 15.02. iv) Scheduling issues will be resolved at the local level. v) Where the union and the employer have agreed to or agree to an extended daily tour or hybrid schedule that differs from the normal daily extended tour, the proportion of unpaid time to hours of work shall maintain the same ratio as set out in paragraph ii) and iii) of this Article.

  • CONTRACT PRICE a. The Contractor shall provide the Contractor Deliverables to the Authority at the Contract Price. The Contract Price shall be a Firm Price unless otherwise stated in Schedule 3 (Contract Data Sheet). b. Subject to condition 35.a the Contract Price shall be inclusive of any UK custom and excise or other duty payable. The Contractor shall not make any claim for drawback of UK import duty on any part of the Contract Deliverables supplied which may be for shipment outside of the UK.