Contractor’s failure to rectify Defects Clause Samples

POPULAR SAMPLE Copied 9 times
Contractor’s failure to rectify Defects. If the Contractor fails to repair or rectify such Defect or deficiency within the period specified in Clause 17.2, the Authority shall be entitled to get the same repaired, rectified or remedied at the Contractor’s cost to make the Project Highway conform to the Specifications and Standards and the provisions of this Agreement. All costs consequent thereon shall, after due consultation with the Authority and the Contractor, be determined by the Authority’s Engineer. The cost so determined and an amount equal to 20% (twenty percent) of the cost as Damages shall be recoverable by the Authority from the Contractor and may be deducted by the Authority from any monies due to the Contractor.
Contractor’s failure to rectify Defects. In the event that the Contractor fails to repair or rectify such Defect or deficiency within the period specified by the EIC, the RSCL shall be entitled to get the same repaired, rectified or remedied at the Contractor’s cost so as to make the Work conform to the Specifications and Standards and the provisions of this Agreement. All costs consequent there on shall, after due consultation with the RSCL and the Contractor, be determined by the EIC. The cost so determined and an amount equal to One hundred twenty percent (120 %) of the cost as Damages shall be recoverable by the RSCL from the Contractor and may be deducted by the RSCL from any monies due to the Contractor.
Contractor’s failure to rectify Defects. In the event that the Contractor fails to repair or rectify such Defect or deficiency within the period specified in Clause 17.2, the Employer shall be entitled to get the same repaired, rectified or remedied at the Contractor’s cost so as to make the Project Works conform to the Specifications and Standards and the provisions of this Agreement. All costs consequent thereon shall, after due consultation with the Employer and the Contractor, be determined by the Employer’s Engineer. The cost so determined for repair or rectification or replacement of such defects plus an amount equal to hundred percent (100%) of the above cost as Damages shall be recoverable by the Employer from the Contractor and may be deducted by the Employer from any monies due to the Contractor.
Contractor’s failure to rectify Defects. In the event that the Contractor fails to repair or rectify such Defect or deficiency within the period specified in Clause 15.2, the SPV shall be entitled to get the same repaired, rectified or remedied at the Contractor’s cost so as to make the Railway Project conform to the Specifications and Standards and the provisions of this Agreement. All costs consequent thereon shall, after due consultation with the SPV and the Contractor, be determined by the SPV’s Engineer . The cost so determined, and an amount equal to 20% (twenty percent) of such cost as Damages, shall be recoverable by the SPV from the Contractor and may be deducted by the SPV from any monies due to the Contractor.
Contractor’s failure to rectify Defects. In the event that the Contractor fails to repair or rectify such Defect or deficiency within the period specified in Clause 11.1, KDA shall be entitled to get the same repaired, rectified or remedied at the Contractor’s risk and cost so as to make the Project conform to the Specifications and Standards and the provisions of this Agreement. All costs consequent thereon shall, after due consultation with KDA and the Contractor, be determined by the Project Engineer. The cost so determined and an amount equal to twenty percent of the cost as Damages shall be recoverable by KDA from the Contractor and may be deducted by KDA from any monies due or to become due to the Contractor.

Related to Contractor’s failure to rectify Defects

  • Epidemic Failure Warranty Supplier warrants all Products against Epidemic Failure for a period of three years after DXC’s Acceptance. Epidemic Failure means the occurrence of the same failure, defect, or non-conformity with an Order in 2% or more of Products within any three-month period.

  • Failure to Fulfill Conditions In the event that either of the parties hereto determines that a condition to its respective obligations to consummate the transactions contemplated hereby cannot be fulfilled on or prior to the termination of this Agreement, it will promptly notify the other party.

  • Latent Defects Notwithstanding anything to the contrary set forth herein, no acceptance, or deemed acceptance, by City pursuant to this Section shall be applicable with respect to any Latent Defects. An acceptance, or deemed acceptance, by City pursuant to this Section shall not mean that City has accepted, or the other party has been relieved of, responsibility for: (i) compliance with the Laws; (ii) the proper application of construction means or methods; or (iii) correcting any portion of the Project if it later is determined that any portion of the Project is inconsistent with the Final Documents and Drawings.

  • Borrower’s Failure to Notify Any outstanding Borrowing of Domestic Rate Loans shall, subject to Section 6.2 hereof, automatically be continued for an additional Interest Period on the last day of its then current Interest Period unless the Borrower has notified the Administrative Agent within the period required by Section 1.6(a) hereof that it intends to convert such Borrowing into a Borrowing of Eurocurrency Loans or notifies the Administrative Agent within the period required by Section 1.9(a) hereof that it intends to prepay such Borrowing. If the Borrower fails to give notice pursuant to Section 1.6(a) hereof of the continuation or conversion of any outstanding principal amount of a Borrowing of Eurocurrency Loans denominated in U.S. Dollars before the last day of its then current Interest Period within the period required by Section 1.6(a) hereof and has not notified the Administrative Agent within the period required by Section 1.9(a) hereof that it intends to prepay such Borrowing, such Borrowing shall automatically be converted into a Borrowing of Domestic Rate Loans, subject to Section 6.2 hereof. If the Borrower fails to give notice pursuant to Section 1.6(a) above of the continuation of any outstanding principal amount of a Borrowing of Eurocurrency Loans denominated in an Alternative Currency before the last day of its then current Interest Period within the period required by Section 1.6(a) hereof and has not notified the Administrative Agent within the period required by Section 1.9(a) hereof that it intends to prepay such Borrowing, such Borrowing shall automatically be continued as a Borrowing of Eurocurrency Loans in the same Alternative Currency with an Interest Period of one month, subject to Section 6.2 hereof, including the application of Section 1.4 hereof and of the restrictions contained in the definition of Interest Period.

  • Epidemic Failure Remedy If an Epidemic Failure occurs, all costs, including but not limited to, replacement Products, parts, upgrades, materials, labor, transportation and inventory replacement arising from an Epidemic Failure shall be borne by Supplier, regardless of whether DXC initiates a field stocking recall or customer-based recall or retrofit, including Products in distributor inventory and DXC’s installed base. Supplier, at its expense, will ensure that such Products, parts or upgrades have the highest shipping priority. DXC reserves the right to procure, upon terms it deems appropriate, similar products to substitute the affected Products, and Supplier shall promptly reimburse DXC for all costs, charges, prices and fees paid in purchasing the substitute products.