Control Plane Sample Clauses

Control Plane. Databricks deploys new code to the Databricks Control on an ongoing basis.
Control Plane. Table 5.3 – DCN Data Plane Requirements
Control Plane. Private / Shared Circuit Configuration‌ Private and shared optical circuits are differed by setting which of the switch's input ports are matched by the rerouting rule of elephant flows through the optical circuit. Therefore, different metadata values are assigned to packets from input ports connected to the lower and the upper packet tiers. Then, by mask matching on the metadata value of an ingress packet, one can configure the switch either to use the optical circuit as private by serving only packets from the lower tier, or shared by serving packets also from the upper tier. Figure 6 demonstrates Open vSwitch [34] configuration for private and shared circuits. At initialization, metadata values of 0b01 and 0b11 are assigned to packets arriving from the upper and lower tier, respectively. For a private circuit, a single OpenFlow rule is set to match packets with metadata values of 0b1* by using 0b10 mask. Therefore, only packets from all input ports connected to the lower tier are matched and transmitted though the circuit. Similarly, for a shared circuit, packets with metadata of 0b*1 are matched by using 0b01 mask. Hence, packets arriving from all input ports connected to both upper and lower tiers are matched and transmitted through the circuit. As described above, the OpenFlow rule is also set to capture the DSCPe value (nwtos), and the lower tier subnet destination (nwdst) of the switch connected to the other end of the optical circuit.
Control Plane. Providing Software as a Service (SaaS) for cloud automation, cloud control and management of software. Control Plane enables self-service environment provisioning, deployment of all tools in DevOps toolchain such as ▇▇▇▇▇▇▇, Git, Spinnaker, Sysdig, pre-configured with SSO and RBAC across all tools.

Related to Control Plane

  • Quality Control Program Engineer shall have a quality control program in place that ensures that all deliverable work is of high quality. Engineer shall submit a plan detailing its program to the Inspection Branch of the TxDOT Bridge Division for review and approval prior to beginning work. State may review or audit the programs.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.

  • Department’s Contract Manager The Department’s Contract Manager, who is primarily responsible for the Department’s oversight of the Contract, will be identified in a separate writing to the Contractor upon Contract signing in the following format: Department’s Contract Manager Name Department’s Name Department’s Physical Address Department’s Telephone # Department’s Email Address If the Department changes the Contract Manager, the Department will notify the Contractor. Such a change does not require an amendment to the Contract.