CONTROL WORK. A. The corresponding County department’s Project Manager or his/her designee shall decide any and all questions which may arise as to the quality of acceptability of the work performed, the manner and rate of performance, interpretation of the specifications, and/or the acceptable fulfillment of the Contract by the Contractor. The Project Manager or his/her designee shall also direct the inspection/administration of the work and decide questions regarding compensation.
CONTROL WORK. Control work shall include building standard Alerton BACnet pressure-independent digital zone controllers with heating coil discharge air temperature sensors, MicroSet wall thermostats with display and buttons, UL Listed 24 VAC, 40 VA transformer, Belimo damper actuators, Belimo PICCV control valves with actuators, installation, programming and graphics/alarm/trend updating at operator workstation. i) Tie zone controllers into the existing floor MS/TP BACnet data network at the main ducts. Insert the tenant zones into the network by pulling network cable back to the adjacent zone and running new wire to the new zone, then picking up the existing wire again to form a daisy chain with no intermediate splices. (1) Program zone terminals identically to the base building terminals including feedback for static pressure reset, discharge air temperature reset with heating minimum air flow reset, purge-out, warm-up/cool-down, demand controlled ventilation and other building standard control features. (2) Program the perimeter zones and gathering areas for a minimum air flow of 20% of design flow and interior open areas to zero minimum flow. All zones shall accept proportional reset from demand controlled ventilation algorithms. ii) Provide Telaire Model 8003 CO2 sensors in tenant spaces for sensing the average CO2 levels. Provide additional sensors in lunch rooms, conference rooms and other closed areas where more than four people can gather. (1) Program each zone to accept digital reset of the minimum air flow setting from the CO2 sensors in the related spaces. Where a CO2 sensor encompasses several related zones, link these zones to the demand controlled ventilation reset. Reset the minimums proportionally up to 40% of design flow in each zone.

Related to CONTROL WORK

  • Control Notwithstanding any other provision of the Agreement, it is understood and agreed that the Trust shall at all times retain the ultimate responsibility for and control of all functions performed pursuant to this Agreement and has reserved the right to reasonably direct any action hereunder taken on its behalf by the Sub-Adviser.

  • Substantial Completion Date Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31, 2022.

  • Access Control Supplier will maintain an appropriate access control policy that is designed to restrict access to Accenture Data and Supplier assets to authorized Personnel. Supplier will require that all accounts have complex passwords that contain letters, numbers, and special characters, be changed at least every 90 days, and have a minimum length of 8 characters.

  • Construction Period During the construction period, Redeveloper agrees to keep the construction area, including completed operations insured against loss or damage by fire, and such other risks, casualties, and hazards as are customarily covered by builders’ risk or extended coverage policies in an amount not less than the replacement value but allowing for reasonable coinsurance clauses and deductibles. In the event of any insured damage or destruction, Redeveloper agrees to use its good faith efforts to commence restoration of the Private Improvements to its prior condition within nine (9) months from the date of the damage or destruction, and shall diligently pursue the same to completion.

  • Possession Tenant has examined the condition of the Premises and by taking possession acknowledges that they have accepted the Premises in good order and in its current condition except as herein otherwise stated. Failure of the Landlord to deliver possession of the Premises at the start of the Lease Term to the Tenant shall terminate this Agreement at the option of the Tenant. Furthermore, under such failure to deliver possession by the Landlord, and if the Tenant cancels this Agreement, the Security Deposit (if any) shall be returned to the Tenant along with any other pre-paid rent, fees, including if the Tenant paid a fee during the application process before the execution of this Agreement.