Design and Plan Submission Sample Clauses

Design and Plan Submission. Subject to Section 3.9, the Contractor shall not commence or permit the commencement of construction of any part of the Project until the Contractor receives from the Province the endorsement of “Received” or “Received with Observations” in respect of all detailed designs, all relevant certificates, all the Contractor’s Management Systems and Plans, and the Contractor’s Construction Schedule required in respect of such part of the Project. Neither comment nor failure to provide comment by the Province shall relieve against or excuse any failure by the Contractor to carry out the Project in accordance with the Project Requirements. If any submitted element of the design and construction does not comply with or satisfy the Technical Requirements or materially deviates from the subject matter of Schedules 2, 3, 4 or 12 of the DB Agreement, the Contractor shall notify the Province as soon as is reasonably practicable of any such failure to comply by making a written submission (the "Non-Compliance Submission") through the Review Procedure (Section 3 below). The Non-Compliance Submission shall contain the following information: (a) the circumstances in which such non-compliance with the Technical Requirements or the material deviation from the subject matter of Schedules 2, 3, 4 or 12 to the DB Agreement occurred; (b) explanation of the causes for such non-compliance and, where applicable, for any delay in providing notification; and (c) the measures, if any, which the Contractor proposes to adopt in order to rectify such non-compliance.
Design and Plan Submission. Subject to Sections 3.3, 3.4 and 3.9, the Contractor shall not commence or permit the commencement of construction of any part of the Project or the performance of any Existing Facilities O&M or the O&M until 10 Business Days following the Province's receipt of all Detailed Designs (including, but not limited to, design reports, detailed design drawings, shop drawings and construction specifications), all relevant certificates, all the Contractor’s Management Systems and Plans, and the Contractor’s Construction Schedule required in respect of such part of the Project, Existing Facilities O&M or the O&M. Neither comment nor failure to provide comment by the Province shall relieve against or excuse any failure by the Contractor to carry out the Project or perform the Existing Facilities O&M or the O&M in accordance with the Project Requirements, or the O&M Requirements, as applicable. If any submitted element of the design and construction does not comply with or satisfy the Technical Requirements or materially deviates from the subject matter of Schedules 2 (Contractor’s Construction Schedule), 3 (Contractor’s Designs), 4 (Contractor’s Management Systems and Plans) or 16 (Safety Requirements) of the DBFO Agreement, the Contractor shall notify the Province as soon as is reasonably practicable of any such failure to comply by making a written submission (the "Non-Compliance Submission") through the Review Procedure in Section 3. The Non-Compliance Submission shall contain the following information: (a) the circumstances in which such non-compliance with the Technical Requirements or the material deviation from the subject matter of Schedules 2, 3, 4 or 16 to the DBFO Agreement occurred; (b) explanation of the causes for such non-compliance and, where applicable, for any delay in providing notification; and (c) the measures, if any, which the Contractor proposes to adopt in order to rectify such non-compliance;

Related to Design and Plan Submission

  • Alignment with Modernization Foundational Programs and Foundational Capabilities The activities and services that the LPHA has agreed to deliver under this Program Element align with Foundational Programs and Foundational Capabilities and the public health accountability metrics (if applicable), as follows (see Oregon’s Public Health Modernization Manual, (▇▇▇▇://▇▇▇.▇▇▇▇▇▇.▇▇▇/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf): a. Foundational Programs and Capabilities (As specified in Public Health Modernization Manual) b. The work in this Program Element helps Oregon’s governmental public health system achieve the following Public Health Accountability Metric, Health Outcome Measure: c. The work in this Program Element helps Oregon’s governmental public health system achieve the following Public Health Accountability Metric, Local Public Health Process Measure:

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • SCOPE OF ARCHITECT’S BASIC SERVICES 3.1 The Architect’s Basic Services consist of those described in this Article 3 and include usual and customary structural, mechanical, and electrical engineering services. Services not set forth in this Article 3 are Supplemental or Additional Services. § 3.1.1 The Architect shall manage the Architect’s services, research applicable design criteria, attend Project meetings, communicate with members of the Project team, and report progress to the Owner. § 3.1.2 The Architect shall coordinate its services with those services provided by the Owner and the Owner’s consultants. The Architect shall be entitled to rely on, and shall not be responsible for, the accuracy, completeness, and timeliness of, services and information furnished by the Owner and the Owner’s consultants. The Architect shall provide prompt written notice to the Owner if the Architect becomes aware of any error, omission, or inconsistency in such services or information. § 3.1.3 As soon as practicable after the date of this Agreement, the Architect shall submit for the Owner’s approval a schedule for the performance of the Architect’s services. The schedule initially shall include anticipated dates for the commencement of construction and for Substantial Completion of the Work as set forth in the Initial Information. The schedule shall include allowances for periods of time required for the Owner’s review, for the performance of the Owner’s consultants, and for approval of submissions by authorities having jurisdiction over the Project. Once approved by the Owner, time limits established by the schedule shall not, except for reasonable cause, be exceeded by the Architect or Owner. With the Owner’s approval, the Architect shall adjust the schedule, if necessary, as the Project proceeds until the commencement of construction. § 3.1.4 The Architect shall not be responsible for an Owner’s directive or substitution, or for the Owner’s acceptance of non-conforming Work, made or given without the Architect’s written approval. § 3.1.5 The Architect shall contact governmental authorities required to approve the Construction Documents and entities providing utility services to the Project. The Architect shall respond to applicable design requirements imposed by those authorities and entities. § 3.1.6 The Architect shall assist the Owner in connection with the Owner’s responsibility for filing documents required for the approval of governmental authorities having jurisdiction over the Project.

  • HUB Subcontracting Plan The Owner has adopted Exhibit H, Policy on Utilization of Historically Underutilized Business ("Policy"), which is incorporated herein by reference. Contractor, as a provision of the Agreement must comply with the requirements of the Policy and adhere to the HUB Subcontracting Plan submitted with Contractor's Proposal and attached as Exhibit I. No changes to the HUB Subcontracting Plan can be made by the Contractor without the prior written approval of the Owner in accordance with the Policy.

  • Access to Personnel Files All employees shall be allowed access to their personnel files during normal working hours for inspection and/or copies of documents which will be provided by the Employer. Such inspection shall be made subject to prior arrangement with the Employer.