Detailed Scope of Work Sample Clauses

POPULAR SAMPLE Copied 1 times
Detailed Scope of Work. The selected IT Security Audit Agency(ies) shall be responsible for the assessment of the vulnerabilities, threats and risks that exist in website through Internet Vulnerability Assessment, Penetration Testing and Industry standard methodologies. This will include identifying remedial solutions and recommendations for implementation of the same to mitigate all identified risks, with the objective of enhancing the security of the website. The bidder will also be expected to propose a risk mitigation strategy as well as give specific recommendations to tackle the residual risks emerging out of identified vulnerabilities assessment. For each security audit, the internet link and credentials for staging environment of the web site/portal/application, accessible only to the security audit agency, shall be shared. Each instance of security audit of a web portal/application shall have the following four primary steps: RISL Rate Contract for Security Audit of Website(s)/Web Application(s)/portal(s)/Mobile App(s)
Detailed Scope of Work. The complete description of services to be provided by the Contractor under an individual Job Order. Developed by the Contractor, after the Joint Scope Meeting and submitted for approval to the County Project Manager.
Detailed Scope of Work. The complete description of services to be provided by the Contractor under an individual JOC Task Order (JTO). Developed by the Contractor, after the Joint Scope Meeting and submitted for approval to the County Project Manager.
Detailed Scope of Work. A document setting forth the work the Contractor is obligated to complete for a particular Job Order.
Detailed Scope of Work. The Contractor agrees to adhere to the minimum qualifications and requirements as set forth in Solicitation # SD21-00097.
Detailed Scope of Work. ▇▇▇▇ as detailed in Clause No.2 above and others as required shall have to be engaged by the Contractor for the works as detailed below subject to stipulation in BOQ. a. Excavation of soil (all kinds and at all levels) and / or rock (all kinds, all strata and at all levels) from Company’s land and / or from the land (arranged by the Company) at all depth as decided by EIC. b. Necessary preparation of site and drilling holes to facilitate blasting (spacing and size of drilled holes shall be in consultation with Management’s representatives on day to day basis so as to avoid dispute on fragmentation of rock) in all soil and all rock strata. The agency will be responsible for drilling in all gradient / terrain and stemming during charging of explosives as per requirement. c. Facilitating blasting as described at 3 above. d. Loading the excavated spoils into dumper / tipping truck (size of such tipping tuck / dumper shall be as per Bid Document or as decided by Management to limit pollution level). e. Transporting, unloading and dumping the spoils on dump site or on the land arranged by the Management / existing dump(s) and spreading or simultaneous dumping and spreading in layers for filling de-coaled area(s) or subsided area(s) by mechanical means. f. Necessary drilling to facilitate blasting (spacing and size of drilled holes shall be in consultation with Management’s representative on day to day basis so as to avoid dispute) in coal strata, if applicable. The agency will be responsible for drilling in all gradient / terrain and stemming during charging of explosives as per requirement. g. Winning and extraction of coal from all strata, using conventional technology such as use of excavator / drill etc. (capacity and size shall be as per Bid Document or as decided by Management to maintain targeted production within specified time period) as per provision of BOQ. h. Facilitating blasting as described at 3 above. i. Winning and extraction of coal using Surface Miner from all strata (capacity and size of Surface Miner shall be as per Bid Document or as decided by Management to maintain targeted production within specified time period) as per provision of BOQ. j. Loading of coal into tipper / dumper, its transportation and unloading at the destination fixed by the EIC and stacking properly. k. Loading into wagons by Pay Loader (as per provision of BOQ). l. Making and maintaining haul roads, access roads. In case of existing mines where haul road already exists...
Detailed Scope of Work. PACKAGE A: Disposal of Ash at pre-designated locations of Mines pit / any other locations
Detailed Scope of Work. A. Transmission system strengthening at Kurnool-III PS for integration of additional RE generation projects Pack age Sl. No. Name of the Transmission Element Scheduled COD as per Gazette Notification % of Quoted Transmission Charges recoverable on Scheduled COD of the Element of the Project Element(s) which are pre- required for declaring the commercial operation (COD) of the respective Element
Detailed Scope of Work shall provide all services, materials and labor for the construction of ________________________ on the property located at ________________________, ________________________, ________________________ ________________________ hereinafter referred to as the "Worksite."
Detailed Scope of Work. A. Cleaning of Areas underneath and surrounding Fly Ash & Bed Ash Silos 1. Cleaning of Area underneath & surrounding areas Fly Ash & Bed Ash Silos on daily basis by accumulation / collection of Ash by using a JCB (of model: 3D or equivalent) / Loader (of suitable capacity). Minimum 1 No. JCB / Loader shall be owned / possessed by the Contractor. This accumulated / collected Ash shall be loaded into Open Truck and transported to designated locations as directed by Engineer In-charge. Further, the Contractor shall ensure that there is no accumulation of ash in the area, which may hamper the normal truck loading process. This cleaning activity will be done daily as a routine job. Contractor shall provide the said JCB on Running Hour basis. The JCB / equivalent equipment deployed at Site shall be equipped with an Hour meter for measurement of the Running Hours for the Operation of JCB. Further, the JCB shall be retained at Site till the cleaning of Silo areas gets completed for the day. The capacity of JCB / Loader should be such that, it can load Ash in to a single axle / multi-axle trucks easily. 2. Contractor shall deploy JCB / Loader, everyday, from 8:30 AM to 5:30 PM. During requirement of execution in extended Hours, Contractor shall keep the JCB deployed till the execution of the job, for the day, as directed by Engineer In-charge. However in case of urgency, Contractor shall make the JCB available in one hour notice other than above time, if required so. 3. Contractor shall own / possess minimum 1 No. multi-axle Open Truck, which shall be deployed every day, for transporting the collected Ash as above to a distance of about 7 km (one side) from any of the Silos, as directed by GIPCL’s Engineer In- charge. 4. The Contractor shall deploy for day to day job execution, the same (i) JCB or equivalent for accumulation / collection of Ash and (ii) Open Truck for transportation of this accumulated / collected Ash to designated locations, as per the ownership / possession shown of aforesaid machineries / equipments / vehicles in accordance with the minimum ‘Eligibility Criteria’ (Clause No. 5 of SECTION – A above). 5. The weighment shall be done at GIPCL’s Weighbridge. Gate pass will be generated for each loaded trip after weighing. The duly signed/stamped gate pass copy, at receiving end by either security personnel or concerned representatives, will be the supporting document for arriving at the quantity of spilled ash removed/lifted and transported and dumpe...