Document Retention The Firm shall maintain for review by Citizens any documentation, receipts, files, invoices and time-keeping records in support of all disbursements for at least three (3) years after the file is closed by the Firm. Additional document retention requirements may be specified in the Firm’s Contract for Legal Services with Citizens. Citizens will not honor fees or expenses associated with audit preparation, proceedings or resolution, unless the expenses are requested and pre-approved by Citizens (i.e. copying services, delivery services, etc.).
Document Imaging Investor shall be entitled, in its sole discretion, to image or make copies of all or any selection of the agreements, instruments, documents, and items and records governing, arising from or relating to any of Company’s loans, including, without limitation, this Agreement and the other Transaction Documents, and Investor may destroy or archive the paper originals. The parties hereto (i) waive any right to insist or require that Investor produce paper originals, (ii) agree that such images shall be accorded the same force and effect as the paper originals, (iii) agree that Investor is entitled to use such images in lieu of destroyed or archived originals for any purpose, including as admissible evidence in any demand, presentment or other proceedings, and (iv) further agree that any executed facsimile (faxed), scanned, emailed, or other imaged copy of this Agreement or any other Transaction Document shall be deemed to be of the same force and effect as the original manually executed document.
Document Delivery The Trust has delivered to Forum copies of (i) the Trust's Trust Instrument and Bylaws (collectively, as amended from time to time, "Organic Documents"), (ii) the Trust's Registration Statement and all amendments thereto filed with the U.S. Securities and Exchange Commission ("SEC") pursuant to the Securities Act of 1933, as amended (the "Securities Act"), or the Investment Company Act of 1940, as amended ("1940 Act")(the "Registration Statement"), (iii) the Trust's current Prospectus and Statement of Additional Information of each Fund (collectively, as currently in effect and as amended or supplemented, the "Prospectus"), (iv) each current plan of distribution or similar document adopted by the Trust under Rule 12b-1 under the 1940 Act ("Plan") and each current shareholder service plan or similar document adopted by the Trust ("Service Plan"), and (v) all procedures adopted by the Trust with respect to the Funds (i.e., repurchase agreement procedures), and shall promptly furnish Forum with all amendments of or supplements to the foregoing. The Trust shall deliver to Forum a certified copy of the resolution of the Board of Trustees of the Trust (the "Board") appointing Forum and authorizing the execution and delivery of this Agreement.
Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Model coordination shall occur at all reviews during the Construction Documents Phase as identified in the BIM Execution Plan. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 The Architect/Engineer shall provide a list of all manufacturer warranties and submittals that are required by their specification. 1.4.9 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.
Contract Amendment A. Contract Exhibit A, Scope of Work, is hereby deleted and replaced in its entirety with the attached Exhibit A, Scope of Work, which is incorporated into the Contract by reference herein. B. Contract Exhibit B, Additional Special Contract Conditions, is hereby deleted in its entirety and replaced with the attached Exhibit B, Additional Special Contract Conditions, which is incorporated into the ACS by reference herein. C. Contract Exhibit I, PUR 1355: Foreign Country of Concern Attestation, is hereby incorporated in its entirety to the ACS by reference herein.