Dredging Management Plan Clause Samples

Dredging Management Plan. The contractor shall ensure that a Dredging Management Plan (DMP) containing Standard Operating Procedures (SOPs) for the Project is developed prior to the initiation of dredging and implemented for the duration of the dredging activity. The DMP will include the following measures to prevent release of hazardous materials during construction activities:
Dredging Management Plan. The contractor shall ensure that a Dredging Management Plan (DMP) containing Standard Operating Procedures (SOPs) for the project is developed prior to the initiation of dredging and implemented for the duration of the dredging activity. The DMP will include the following measures to prevent release of hazardous materials during construction activities: • Personnel involved with dredging and handling the Dredge area Approval of plan, compliance monitoring Contractor, as verified by the San Diego Water Board Prior to and ongoing during dredging operations Potential Impact Mitigation Measure Location Monitoring/ Reporting Action Agency Responsible Timing dredged material will be given training on their specific task areas, including: o Potential hazards resulting from accidental oil and/or fuel spills; o Proper dredging equipment operation; o Proper silt curtain deployment techniques; and o Proper response in the event that ordinance or munitions are encountered. • All equipment will be inspected by the dredge contractor and equipment operators before starting the shift. These inspections are intended to identify typical wear or faulty parts. • Required instrumentation to avoid spillage of dredging material will be identified for each piece of equipment used during dredging operations. • Personnel will be required to visually monitor for oil or fuel spills during construction activities. • In the event that a sheen or spill is observed, the equipment will be immediately shut down and the source of the spill identified and contained. Additionally, the spill will be reported to the applicable agencies presented in the DMP. • All personnel associated with dredging activities will be trained as to where oil/fuel spill kits are located, how to deploy the oil-absorbent pads, and proper disposal guidelines. The dredging barge shall have a full complement of oil/fuel spill kits on board to allow for quick and timely implementation of spill containment. • The use of oil booms will be deployed surrounding the dredging activities. In the event that a spill occurs, the oil and/or fuel will be contained within the oil boom boundary. The oil boom shall be Potential Impact Mitigation Measure Location Monitoring/ Reporting Action Agency Responsible Timing deployed along the entire length of the outer silt curtain. • Shallow areas along the haul route will be mapped and provided to the dredge operator for review. These areas will be avoided to the extent possible to prevent ...

Related to Dredging Management Plan

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • NETLINK MANAGEMENT PTE LTD. (in its capacity as trustee of NetLink Trust) (Company Registration Number: 201704784C), a company incorporated in Singapore with its registered address at ▇▇▇▇ ▇▇▇▇ ▇▇▇▇ Road, #07-03 Viva Business Park Singapore 469005 (“NLT”) AND

  • Patch Management All workstations, laptops and other systems that process and/or store County PHI or PI must have critical security patches applied, with system reboot if necessary. There must be a documented patch management process which determines installation timeframe based on risk assessment and vendor recommendations. At a maximum, all applicable patches must be installed within 30 days of vendor release.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Project Management Plan Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan and