Equipment and Testing Clause Samples

Equipment and Testing. Winstar shall be responsible for providing, at its sole expense, the antenna (e), coaxial cable, brackets, connectors, support structure, grounding and bonding materials, and weather-proofing materials for such support structure or antenna (e) required for the Microwave Collocation. Winstar shall also be solely responsible for final adjustments (e.g., pointing) of the antenna (e).
Equipment and Testing. BellSouth will designate the location of and install the GPS antenna mounting bracket requested by BSLD on the exterior wall of a BellSouth Central Office, including the penetration through the exterior wall(s). BellSouth will also designate the specific cable support structure that BSLD must use to place its cabling that is required to connect BSLD’s GPS antenna to BSLD’s associated GPS equipment. BellSouth will provide an exit to the exterior wall of the BellSouth Central Office upon which the GPS antenna mounting bracket has been installed, so BSLD will have access to its GPS antenna. BSLD shall be responsible for providing, at its sole expense, the GPS antenna, coaxial cable, connectors, grounding and bonding materials, weather- proofing materials, and any other required equipment associated with the placement and maintenance of BSLD’s GPS antenna, BSLD’s GPS antenna shall be used solely for synchronization and timing purposes and will be connected to BSLD’s associated GPS equipment in the same BellSouth Central Office. BSLD shall be solely responsible for verifying that its GPS antenna can receive a satisfactory signal prior to BellSouth’s designation of the location of the antenna mounting bracket and for performing any final adjustments (e.g., positioning) to its GPS antenna and any associated equipment in BSLD’s physical collocation space. 3. Application Process 3.1 BSLD must submit a separate GPS Application for each GPS antenna requested, via BellSouth’s e.Application ordering system for collocation, for approval to place each such requested GPS antenna at a specific BellSouth Central Office. The GPS Application Fee will be billed effective with the date BellSouth provides BSLD with an Application Response. GPS equipment required to operate the GPS antenna (such as a GPS receiver) shall be included on BSLD’s GPS Application, which must be submitted via BellSouth’s e.Application ordering system. The equipment required to operate the GPS antenna may only be placed in BSLD’s physical collocation space. If BSLD desires to place additional GPS equipment in BSLD’s physical collocation space after the BSLD has submitted a BFFO for the initial installation of the GPS antenna and associated GPS equipment, a Subsequent Application Fee or the appropriate Augment Application Fee will apply, pursuant to the rates set forth in Exhibit B of Attachment 4.
Equipment and Testing. Teligent shall be responsible for providing, at its sole expense, the antenna(e), coaxial cable, brackets, connectors, support structure and weather-proofing materials for such support structure or antenna(e) required for the Microwave Physical Collocation. Teligent shall also be solely responsible for final adjustments (e.g., pointing) of the antenna(e).
Equipment and Testing. Pac-West shall be responsible for providing, at its sole expense, the antenna(e), coaxial cable, brackets, connectors, support structure and weather-proofing materials for such support structure or antenna(e) required for the Microwave Physical Collocation. Pac- West shall also be solely responsible for final adjustments (e.g., pointing) of the antenna(e). ----
Equipment and Testing. Fuzion shall be responsible for providing, at its sole expense, the antenna (e), coaxial cable, brackets, connectors, support structure, grounding and bonding materials, and weather-proofing materials for such support structure or antenna (e) required for the Microwave Collocation. Fuzion shall also be solely responsible for final adjustments (e.g., pointing) of the antenna (e).
Equipment and Testing. CLEC-1 shall be responsible for providing, at its sole expense, the antenna (e), coaxial cable, brackets, connectors, support structure, grounding and bonding materials, and weather-proofing materials for such support structure or antenna (e) required for the Microwave Collocation. CLEC-1 shall also be solely responsible for final adjustments (e.g., pointing) of the antenna (e).

Related to Equipment and Testing

  • Equipment and Tools 40.01 The Employer will make available all necessary tools and equipment it requires for the performance of work assignments at no cost to the employees. Such tools and equipment will remain the property of the Employer and the employees will be required to take reasonable care of this property and may be required to sign out certain equipment and tools.

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Inspection and Tests 3.8.1 The Procuring entity or its representative shall have the right to inspect and/or to test the goods to confirm their conformity to the Contract specifications. The Procuring entity shall notify the tenderer in writing in a timely manner, of the identity of any representatives retained for these purposes. 3.8.2 The inspections and tests may be conducted in the premises of the tenderer or its subcontractor(s), at point of delivery, and/or at the Goods’ final destination If conducted on the premises of the tenderer or its subcontractor(s), all reasonable facilities and assistance, including access to drawings and production data, shall be furnished to the inspectors at no charge to the Procuring entity. 3.8.3 Should any inspected or tested goods fail to conform to the Specifications, the Procuring entity may reject the equipment, and the tenderer shall either replace the rejected equipment or make alterations necessary to make specification requirements free of costs to the Procuring entity. 3.8.4 The Procuring entity’s right to inspect, test and where necessary, reject the goods after the Goods’ arrival shall in no way be limited or waived by reason of the equipment having previously been inspected, tested and passed by the Procuring entity or its representative prior to the equipment delivery. 3.8.5 Nothing in paragraph 3.8 shall in any way release the tenderer from any warranty or other obligations under this Contract.

  • Equipment and Software Any costs incurred by Kodak resulting from Customer (1) changes to the configuration of the Equipment or Software, or (2) postponement of Delivery or installation of the Equipment or Software;

  • Equipment and Materials CONTRACTOR shall provide all equipment, materials, and supplies necessary for the performance on the Agreement except: