Exchange of Transmission and Generation Scheduled Outage Data Sample Clauses

The "Exchange of Transmission and Generation Scheduled Outage Data" clause requires parties to share information about planned outages of transmission lines and generation facilities. In practice, this means that each party must notify the other in advance about when and for how long specific equipment will be taken offline for maintenance or other scheduled reasons. This exchange of data helps ensure system reliability and coordination, allowing both parties to plan for potential impacts on grid operations and minimize disruptions to service.
Exchange of Transmission and Generation Scheduled Outage Data. Upon a Party’s request, the projected status of generation and transmission availability will be communicated among the Parties, subject to data confidentiality agreements. All requested and available information regardless of scheduled date will be shared. The Parties shall exchange the most current information on proposed Scheduled Outage information and provide a timely response on potential impacts of proposed Scheduled Outages. The Parties agree that this information will be shared promptly upon its availability, but no less than daily and more often as required by system conditions. The Parties shall utilize the NERC SDX (or other jointly developed, common format as determined by the OC) for the exchange of this information. The information shall include the data required for the SDX per NERC and Regional Reliability Standards. Each Party will also provide information independently on approved and anticipated Scheduled Outages formatted as required for the NERC SDX System. OUTAG --> PROGRESS-JOA 7.1 Operating Protocols for Coordinating Schedu --> PROGRESS-JOA 7.1.2 Evaluation and Coordination of Transmiss
Exchange of Transmission and Generation Scheduled Outage Data. Upon a Party’s request, the projected status of generation and transmission availability shall be communicated among the Parties. The Parties shall exchange the most current information on proposed Scheduled Outage information and provide a timely response on potential impacts of proposed Scheduled Outages.
Exchange of Transmission and Generation Scheduled Outage Data. Upon a Party’s request, the projected status of generation and transmission availability shall be communicated among the Parties. The Parties shall exchange the most current information on proposed Scheduled Outage information and provide a timely response on potential impacts of proposed Scheduled Outages. The Parties shall share this information promptly upon its availability, but no less than daily and more often as required by system conditions. The Parties shall utilize a mutually agreed upon format for the exchange of this information, which includes the owning Party’s facility name; proposed Scheduled Outage start date and time; proposed facility return date and time; date and time when a response is needed from the impacted Party to modify the proposed schedule; and any other information that may be relevant to the reliability assessment. Each Party shall also provide information independently on approved and anticipated Scheduled Outages formatted as required for the SDX System.
Exchange of Transmission and Generation Scheduled Outage Data. Upon a Party’s request, the projected status of generation and transmission availability will be communicated among the Parties, subject to data confidentiality agreements. All requested and available information regardless of scheduled date will be shared. The Parties shall exchange the most current information on proposed Scheduled Outage information and provide a timely response on potential impacts of proposed Scheduled Outages. The Parties agree that this information will be shared promptly upon its availability, but no less than daily and more often as required by system conditions. The Parties shall utilize the NERC SDX (or other jointly developed, common format as determined by the OC) for the exchange of this information. The information shall include the data required for the SDX per NERC and Regional Reliability Standards. Each Party will also provide information independently on approved and anticipated Scheduled Outages formatted as required for the NERC SDX System. Effective Date: 9/17/2010 - Docket #: ER10-2746-000

Related to Exchange of Transmission and Generation Scheduled Outage Data

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks. 6.1.1 As used in this Section 6, “Traffic Rate” means the applicable Reciprocal Compensation Traffic rate, Measured Internet Traffic rate, intrastate Switched Exchange Access Service rate, interstate Switched Exchange Access Service rate, or intrastate/interstate Tandem Transit Traffic rate, as provided in the Pricing Attachment, an applicable Tariff, or, for Measured Internet Traffic, the FCC Internet Order. 6.1.2 If the originating Party passes CPN on ninety-five percent (95%) or more of its calls, the receiving Party shall ▇▇▇▇ the originating Party the Traffic Rate applicable to each relevant minute of traffic for which CPN is passed. For any remaining (up to 5%) calls without CPN information, the receiving Party shall ▇▇▇▇ the originating Party for such traffic at the Traffic Rate applicable to each relevant minute of traffic, in direct proportion to the minutes of use of calls passed with CPN information. 6.1.3 If the originating Party passes CPN on less than ninety-five percent (95%) of its calls and the originating Party chooses to combine Reciprocal Compensation Traffic and Toll Traffic on the same trunk group, the receiving Party shall ▇▇▇▇ the higher of its interstate Switched Exchange Access Service rates or its intrastate Switched Exchange Access Services rates for all traffic that is passed without CPN, unless the Parties agree that other rates should apply to such traffic. 6.2 At such time as a receiving Party has the capability, on an automated basis, to use such CPN to classify traffic delivered over Interconnection Trunks by the other Party by Traffic Rate type (e.g., Reciprocal Compensation Traffic/Measured Internet Traffic, intrastate Switched Exchange Access Service, interstate Switched Exchange Access Service, or intrastate/interstate Tandem Transit Traffic), such receiving Party shall ▇▇▇▇ the originating Party the Traffic Rate applicable to each relevant minute of traffic for which CPN is passed. If the receiving Party lacks the capability, on an automated basis, to use CPN information on an automated basis to classify traffic delivered by the other Party by Traffic Rate type, the originating Party will supply Traffic Factor 1 and Traffic Factor

  • Transmission and Routing of Exchange Access Traffic PURSUANT TO 251(c)(2) 13 ARTICLE VI MEET-POINT BILLING ARRANGEMENTS 14 ARTICLE VII BLV/BLVI TRAFFIC 16 7.1 Busy Line Verification 16 7.2 Busy Line Verification Interrupt 16 7.3 BLV/BLVI Traffic 16 7.4 BLV/BLVI Compensation 16

  • Information Submission by Connecting Transmission Owner The initial information submission by Connecting Transmission Owner shall occur no later than one hundred eighty (180) Calendar Days prior to Trial Operation and shall include New York State Transmission System information necessary to allow the Developer to select equipment and meet any system protection and stability requirements, unless otherwise mutually agreed to by the Developer and Connecting Transmission Owner. On a monthly basis Connecting Transmission Owner shall provide Developer and NYISO a status report on the construction and installation of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades, including, but not limited to, the following information: (1) progress to date; (2) a description of the activities since the last report; (3) a description of the action items for the next period; and (4) the delivery status of equipment ordered.

  • Transmission Delivery Service Implications Under ER Interconnection Service, Interconnection Customer will be eligible to inject power from the Generating Facility into and deliver power across the Transmission System on an “as available” basis up to the amount of MW identified in the applicable stability and steady state studies to the extent the upgrades initially required to qualify for ER Interconnection Service have been constructed. After that date FERC makes effective MISO’s Energy Market Tariff filed in Docket No. ER04-691-000, Interconnection Customer may place a bid to sell into the market up to the maximum identified Generating Facility output, subject to any conditions specified in the Interconnection Service approval, and the Generating Facility will be dispatched to the extent the Interconnection Customer’s bid clears. In all other instances, no transmission or other delivery service from the Generating Facility is assured, but Interconnection Customer may obtain Point-To-Point Transmission Service, Network Integration Transmission Service or be used for secondary network transmission service, pursuant to the Tariff, up to the maximum output identified in the stability and steady state studies. In those instances, in order for Interconnection Customer to obtain the right to deliver or inject energy beyond the Point of Interconnection or to improve its ability to do so, transmission delivery service must be obtained pursuant to the provisions of the Tariff. The Interconnection Customer’s ability to inject its Generating Facility output beyond the Point of Interconnection, therefore, will depend on the existing capacity of the Transmission or Distribution System as applicable, at such time as a Transmission Service request is made that would accommodate such delivery. The provision of Firm Point-To-Point Transmission Service or Network Integration Transmission Service may require the construction of additional Network or Distribution Upgrades.

  • Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information.