Existing Signal Timing Sample Clauses

Existing Signal Timing. The consultant shall obtain the existing signal timing sheets from the local maintaining agency to in order to develop a base analysis model. Key information from the existing signal timing includes phase sequence, yellow and all-red intervals, pedestrian walk and flashing don’t walk intervals, minimum green, and detector settings. Additionally, if the intersection is operating in coordination, then the cycle length, splits and/or force-offs, offsets, and reference phases should be obtained from the existing signal timing.

Related to Existing Signal Timing

  • COMMERCIAL REUSE OF SERVICES The member or user herein agrees not to replicate, duplicate, copy, trade, sell, resell nor exploit for any commercial reason any part, use of, or access to 's sites.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Project or Building Name and Signage Landlord shall have the right at any time to change the name of the Project or Building and to install, affix and maintain any and all signs on the exterior and on the interior of the Project or Building as Landlord may, in Landlord’s sole discretion, desire. Tenant shall not use the name of the Project or Building or use pictures or illustrations of the Project or Building in advertising or other publicity or for any purpose other than as the address of the business to be conducted by Tenant in the Premises, without the prior written consent of Landlord.

  • Unbundled Network Terminating Wire (UNTW) 2.8.3.1 UNTW is unshielded twisted copper wiring that is used to extend circuits from an intra-building network cable terminal or from a building entrance terminal to an individual End User’s point of demarcation. It is the final portion of the Loop that in multi-subscriber configurations represents the point at which the network branches out to serve individual subscribers. 2.8.3.2 This element will be provided in MDUs and/or Multi-Tenants Units (MTUs) where either Party owns wiring all the way to the End User’s premises. Neither Party will provide this element in locations where the property owner provides its own wiring to the End User’s premises, where a third party owns the wiring to the End User’s premises.

  • Community Based Adult Intensive Service (AIS) and Child and Family Intensive Treatment (CFIT) – AIS/CFIT programs offer services primarily based in the home and community for qualifying adults and children with moderate- to-severe mental health conditions. These programs consist at a minimum of ongoing emergency/crisis evaluations, psychiatric assessment, medication evaluation and management, case management, psychiatric nursing services, and individual, group, and family therapy. This plan covers individual psychotherapy, group psychotherapy, and family therapy when rendered by: • Psychiatrists; • Licensed Clinical Psychologists; • Licensed Independent Clinical Social Workers; • Advance Practice Registered Nurses (Clinical Nurse Specialists/Nurse Practitioners- Behavioral Health); • Licensed Mental Health Counselors; and • Licensed Marriage and Family Therapists. This plan covers psychological testing as a behavioral health benefit when rendered by: • neuropsychologists; • psychologists; or • pediatric neurodevelopmental specialists. This plan covers neuropsychological testing as described in the Tests, Labs and Imaging section.