Common use of Exit Management Clause in Contracts

Exit Management. 25.1 If the DFE requires a continuation of all or any of the Services at the end of the Term, either by performing them itself or by engaging a third party to perform them, the Contractor shall co-operate fully with the DFE and any such third party and shall take all reasonable steps to ensure the timely and effective transfer of the Services without disruption to routine operational requirements. 25.2 The Contractor will, within 3 months of the Effective Date, deliver to the DFE, a plan which sets out the Contractor’s proposals for achieving an orderly transition of Services from the Contractor to the DFE and/or its Replacement Contractor at the end of the Term (an “Exit Plan”). 25.3 Within 30 days of the submission of the Exit Plan, both Parties will use reasonable endeavours to agree the Exit Plan .If the Parties are unable to agree the Exit Plan the dispute shall be referred to the dispute resolution procedure in clause 36. 25.4 The Contractor will review and (if appropriate) update the Exit Plan in the first month of each year of the Term to reflect changes to the Services. Following such update the Contractor will submit the revised Exit Plan to the DFE for review. Within 30 days following submission of the revised Exit Plan, the Parties shall meet and use reasonable endeavours to agree the revised Exit Plan and the changes that have occurred in the Services since the Exit Plan was last agreed. If the Parties are unable to agree the revised Exit Plan within 30 days, such dispute shall be referred to the dispute resolution procedure in clause 36. 25.5 If the Contractor: 25.5.1 does not have to use resources in addition to those normally used to deliver the Services prior to termination or expiry, there shall be no change to the Charges; or 25.5.2 reasonably incurs additional costs the Parties shall agree a variation of the Charges. 25.6 If the DFE requests, the Contractor shall deliver to the DFE details of all licences for software used in the provision of the Services including the software licence agreements. 25.7 Within one month of receiving the software licence information described above, the DFE shall notify the Contractor of the licences it wishes to be transferred, and the Contractor shall provide for the approval of the DFE a plan for licence transfer. 25.8 The Contractor shall co-operate fully with the DFE in order to enable an efficient and detailed knowledge transfer from the Contractor to the DFE at the end of the Term and shall provide the DFE free of charge with full access to Personnel, copies of all documents, reports, summaries and any other information requested by the DFE. The Contractor shall comply with the DFE’s request for information no later than 15 Business Days from the date that that request was made.

Appears in 6 contracts

Sources: Contract, Contract, Contract

Exit Management. 25.1 If the DFE requires a continuation of all or any of the Services at the end of the Term, either by performing them itself or by engaging a third party to perform them, the Contractor shall co-operate fully with the DFE and any such third party and shall take all reasonable steps to ensure the timely and effective transfer of the Services without disruption to routine operational requirements. 25.2 The Contractor will, within 3 months of the Effective Date, deliver to the DFE, a plan which sets out the Contractor’s proposals for achieving an orderly transition of Services from the Contractor to the DFE and/or its Replacement Contractor at the end of the Term (an “Exit Plan”). 25.3 Within 30 days of the submission of the Exit Plan, both Parties will use reasonable endeavours to agree the Exit Plan .If Plan. If the Parties are unable to agree the Exit Plan the dispute shall be referred to the dispute resolution procedure in clause 36. 25.4 The Contractor will review and (if appropriate) update the Exit Plan in the first month of each year of the Term to reflect changes to the Services. Following such update the Contractor will submit the revised Exit Plan to the DFE for review. Within 30 days following submission of the revised Exit Plan, the Parties shall meet and use reasonable endeavours to agree the revised Exit Plan and the changes that have occurred in the Services since the Exit Plan was last agreed. If the Parties are unable to agree the revised Exit Plan within 30 days, such dispute shall be referred to the dispute resolution procedure in clause 36. 25.5 If the Contractor: 25.5.1 does not have to use resources Contractor reasonably incurs additional costs in addition to those normally used to deliver delivering the Services prior to termination or expiryexpiry (including as a consequence of being required to use resources for exit management in addition to those which are normally used to deliver the Services), the Parties shall agree a variation of the Charges. In all other circumstances, there shall be no change to the Charges; or 25.5.2 reasonably incurs additional costs the Parties shall agree a variation of the Charges. 25.6 If the DFE requests, the Contractor shall deliver to the DFE details of all licences for software used in the provision of the Services including the software licence agreements. 25.7 Within one month of receiving the software licence information described above, the DFE shall notify the Contractor of the licences it wishes to be transferred, and the Contractor shall provide for the approval of the DFE a plan for licence transfer. 25.8 The Contractor shall co-operate fully with the DFE in order to enable an efficient and detailed knowledge transfer from the Contractor to the DFE at the end of the Term and shall provide the DFE free of charge with full access to Personnel, copies of all documents, reports, summaries and any other information requested by the DFE. The Contractor shall comply with the DFE’s request for information no later than 15 Business Days from the date that that request was made.

Appears in 2 contracts

Sources: Contract, Contract

Exit Management. 25.1 If the DFE requires a continuation of all or any of the Services at the end of the Term, either by performing them itself or by engaging a third party to perform them, the Contractor shall co-operate fully with the DFE and any such third party and shall take all reasonable steps to ensure the timely and effective transfer of the Services without disruption to routine operational requirements. 25.2 The Contractor will, within 3 months of the Effective Date, deliver to the DFE, a plan which sets out the Contractor’s proposals for achieving an orderly transition of Services from the Contractor to the DFE and/or its Replacement Contractor at the end of the Term Term[, which shall include a process to be followed to enable enrolled students to complete their qualifications in the event that this Contract is terminated] (an “Exit Plan”). 25.3 Within 30 days of the submission of the Exit Plan, both Parties will use reasonable endeavours to agree the Exit Plan .If the Parties are unable to agree the Exit Plan the dispute shall be referred to the dispute resolution procedure in clause 36. 25.4 The Contractor will review and (if appropriate) update the Exit Plan in the first month of each year of the Term to reflect changes to the Services. Following such update the Contractor will submit the revised Exit Plan to the DFE for review. Within 30 days following submission of the revised Exit Plan, the Parties shall meet and use reasonable endeavours to agree the revised Exit Plan and the changes that have occurred in the Services since the Exit Plan was last agreed. If the Parties are unable to agree the revised Exit Plan within 30 days, such dispute shall be referred to the dispute resolution procedure in clause 36. 25.5 If the Contractor: 25.5.1 does not have to use resources in addition to those normally used to deliver the Services prior to termination or expiry, there shall be no change to the Charges; or 25.5.2 reasonably incurs additional costs the Parties shall agree a variation of the Charges. 25.6 If the DFE requests, the Contractor shall deliver to the DFE details of all licences for software used in the provision of the Services including the software licence agreements. 25.7 25.6 Within one month of receiving the software licence information described above, the DFE shall notify the Contractor of the licences it wishes to be transferred, and the Contractor shall provide for the approval of the DFE a plan for licence transfer. 25.8 25.7 The Contractor shall co-operate fully with the DFE in order to enable an efficient and detailed knowledge transfer from the Contractor to the DFE at the end of the Term and shall provide the DFE free of charge with full access to Personnel, copies of all documents, reports, summaries and any other information requested by the DFE. The Contractor shall comply with the DFE’s request for information no later than 15 Business Days from the date that that request was made. 25.8 Upon expiry or termination of this Contract (and otherwise upon request of the Party to whom the property belongs) each Party shall, at the option of the other, promptly and securely return or destroy the other Party's property.

Appears in 1 contract

Sources: Contract

Exit Management. 25.1 If the DFE requires a continuation of all or any of the Services at the end of the Term, either by performing them itself or by engaging a third party to perform them, the Contractor shall co-co- operate fully with the DFE and any such third party and shall take all reasonable steps to ensure the timely and effective transfer of the Services without disruption to routine operational requirements. 25.2 The Contractor will, within 3 months of the Effective Date, deliver to the DFE, a plan which sets out the Contractor’s proposals for achieving an orderly transition of Services from the Contractor to the DFE and/or its Replacement Contractor at the end of the Term (an “Exit Plan”). 25.3 Within 30 days of the submission of the Exit Plan, both Parties will use reasonable endeavours to agree the Exit Plan .If Plan. If the Parties are unable to agree the Exit Plan the dispute shall be referred to the dispute resolution procedure in clause 36. 25.4 The Contractor will review and (if appropriate) update the Exit Plan in the first month of each year of the Term to reflect changes to the Services. Following such update the Contractor will submit the revised Exit Plan to the DFE for review. Within 30 days following submission of the revised Exit Plan, the Parties shall meet and use reasonable endeavours to agree the revised Exit Plan and the changes that have occurred in the Services since the Exit Plan was last agreed. If the Parties are unable to agree the revised Exit Plan within 30 days, such dispute shall be referred to the dispute resolution procedure in clause 36. 25.5 If the Contractor: 25.5.1 does not have to use resources in addition to those normally used to deliver the Services prior to termination or expiry, there shall be no change to the Charges; or 25.5.2 reasonably incurs additional costs the Parties shall agree a variation of the Charges. 25.6 If the DFE requests, the Contractor shall deliver to the DFE details of all licences for software used in the provision of the Services including the software licence agreements. 25.7 Within one month of receiving the software licence information described above, the DFE shall notify the Contractor of the licences it wishes to be transferred, and the Contractor shall provide for the approval of the DFE a plan for licence transfer. 25.8 The Contractor shall co-operate fully with the DFE in order to enable an efficient and detailed knowledge transfer from the Contractor to the DFE at the end of the Term and shall provide the DFE free of charge with full access to Personnel, copies of all documents, reports, summaries and any other information requested by the DFE. The Contractor shall comply with the DFE’s request for information no later than 15 Business Days from the date that that request was made.

Appears in 1 contract

Sources: Terms and Conditions

Exit Management. 25.1 If the DFE requires a continuation of all or any of the Services at the end of the Term, either by performing them itself or by engaging a third party to perform them, the Contractor shall co-operate fully with the DFE and any such third party and shall take all reasonable steps to ensure the timely and effective transfer of the Services without disruption to routine operational requirements. 25.2 The Where requested by the DFE, the Contractor will, within 3 months thirty (30) days following receipt of the Effective Daterequest, deliver to the DFE, a plan which sets out the Contractor’s proposals for achieving an orderly transition of Services from the Contractor to the DFE and/or its Replacement Contractor at the end of the Term (an “Exit Plan”). 25.3 Within 30 thirty (30) days of the submission of the Exit Plan, both Parties will use reasonable endeavours to agree the Exit Plan .If Plan. If the Parties are unable to agree the Exit Plan Plan, the dispute shall be referred to the dispute resolution procedure in clause 36. 25.4 The Contractor will review and (if appropriate) update the Exit Plan in the first month of each year of the Term to reflect changes to the Services. Following such update the Contractor will submit the revised Exit Plan to the DFE for review. Within 30 thirty (30) days following submission of the revised Exit Plan, the Parties shall meet and use reasonable best endeavours to agree the revised Exit Plan and the changes that have occurred in the Services since the Exit Plan was last agreed. If the Parties are unable to agree the revised Exit Plan within 30 thirty (30) days, such dispute shall be referred to the dispute resolution procedure in clause 36. 25.5 The following commercial approach shall apply to any transfer of the Services required under clause 25.1. If the Contractor: 25.5.1 does not have to use resources in addition to those normally used to deliver the Services prior to termination or expiry, there shall be no change to the Charges; or 25.5.2 reasonably incurs additional costs costs, the Parties shall agree a variation Variation of the Charges. 25.6 If the DFE requests, the Contractor shall deliver to the DFE details of all licences for software used in the provision of the Services including the software licence agreements. 25.7 Within one (1) month of receiving the software licence information described above, the DFE shall notify the Contractor of the licences it wishes to be transferred, and the Contractor shall provide for the approval of the DFE a plan for licence transfer. 25.8 The Contractor shall co-operate fully with the DFE in order to enable an efficient and detailed knowledge transfer from the Contractor to the DFE at the end of the Term and shall provide the DFE free of charge with full access to Personnel, copies of all documents, reports, summaries and any other information requested by the DFE. The Contractor shall comply with the DFE’s request for information no later than 15 Business fifteen (15) Working Days from the date that that request was made.

Appears in 1 contract

Sources: Agreement

Exit Management. 25.1 If the DFE requires a continuation of all or any of the Services at the end of the Term, either by performing them itself or by engaging a third party to perform them, the Contractor shall co-operate fully with the DFE and any such third party and shall take all reasonable steps to ensure the timely and effective transfer of the Services without disruption to routine operational requirements. 25.2 The Contractor will, within 3 months of the Effective Date, deliver to the DFE, a plan which sets out the Contractor’s proposals for achieving an orderly transition of Services from the Contractor to the DFE and/or its Replacement Contractor at the end of the Term (an “Exit Plan”). 25.3 Within 30 days of the submission of the Exit Plan, both Parties will use reasonable endeavours to agree the Exit Plan .If Plan. If the Parties are unable to agree the Exit Plan the dispute shall be referred to the dispute resolution procedure in clause 36. 25.4 The Contractor will review and (if appropriate) update the Exit Plan in the first month of each year of the Term to reflect changes to the Services. Following such update the Contractor will submit the revised Exit Plan to the DFE for review. Within 30 days following submission of the revised Exit Plan, the Parties shall meet and use reasonable endeavours to agree the revised Exit Plan and the changes that have occurred in the Services since the Exit Plan was last agreed. If the Parties are unable to agree the revised Exit Plan within 30 days, such dispute shall be referred to the dispute resolution procedure in clause 36. 25.5 If the Contractor: 25.5.1 Contractor does not have to use resources in addition to those normally used to deliver the Services prior to termination or expiry, there shall be no change to the Charges; or 25.5.2 . However, if the Contractor reasonably incurs additional costs in relation to compliance with this clause, the Parties shall agree a variation of the Charges. 25.6 If the DFE requests, the Contractor shall deliver to the DFE details of all licences for software used in the provision of the Services including the software licence agreements. 25.7 Within one month of receiving the software licence information described above, the DFE shall notify the Contractor of the licences it wishes to be transferred, and the Contractor shall provide for the approval of the DFE a plan for licence transfer. 25.8 The Contractor shall co-operate fully with the DFE in order to enable an efficient and detailed knowledge transfer from the Contractor to the DFE at the end of the Term and shall provide the DFE free of charge with full access to Personnel, copies of all documents, reports, summaries and any other information requested by the DFE. The Contractor shall comply with the DFE’s request for information no later than 15 Business Days from the date that that request was made.

Appears in 1 contract

Sources: Contract

Exit Management. 25.1 If the DFE requires a continuation of all or any of the Services at the end of the Term, either by performing them itself or by engaging a third party to perform them, the Contractor shall co-co- operate fully with the DFE and any such third party and shall take all reasonable steps to ensure the timely and effective transfer of the Services without disruption to routine operational requirements. 25.2 The Contractor will, within 3 months of the Effective Date, deliver to the DFE, a plan which sets out the Contractor’s proposals for achieving an orderly transition of Services from the Contractor to the DFE and/or its Replacement Contractor at the end of the Term (an “Exit Plan”). 25.3 Within 30 days of the submission of the Exit Plan, both Parties will use reasonable endeavours to agree the Exit Plan .If Plan. If the Parties are unable to agree the Exit Plan the dispute shall be referred to the dispute resolution procedure in clause 36. 25.4 The Contractor will review and (if appropriate) update the Exit Plan in the first month of each year of the Term to reflect changes to the Services. Following such update the Contractor will submit the revised Exit Plan to the DFE for review. Within 30 days following submission of the revised Exit Plan, the Parties shall meet and use reasonable best endeavours to agree the revised Exit Plan and the changes that have occurred in the Services since the Exit Plan was last agreed. If the Parties are unable to agree the revised Exit Plan within 30 days, such dispute shall be referred to the dispute resolution procedure in clause 36. 25.5 If the Contractor: 25.5.1 does not have to use resources in addition to those normally used to deliver the Services prior to termination or expiry, there shall be no change to the Charges; or 25.5.2 reasonably incurs additional costs the Parties shall agree a variation of the Charges. 25.6 If the DFE requests, the Contractor shall deliver to the DFE details of all licences for software used in the provision of the Services including the software licence agreements. 25.7 Within one month of receiving the software licence information described above, the DFE shall notify the Contractor of the licences it wishes to be transferred, and the Contractor shall provide for the approval of the DFE a plan for licence transfer. 25.8 The Contractor shall co-operate fully with the DFE in order to enable an efficient and detailed knowledge transfer from the Contractor to the DFE at the end of the Term and shall provide the DFE free of charge with full access to Personnel, copies of all documents, reports, summaries and any other information requested by the DFE. The Contractor shall comply with the DFE’s request for information no later than 15 Business Days from the date that that request was made.

Appears in 1 contract

Sources: Contract

Exit Management. 25.1 If the DFE requires a continuation of all or any of the Services at the end of the Term, either by performing them itself or by engaging a third party to perform them, the Contractor shall co-operate fully with the DFE and any such third party and shall take all reasonable steps to ensure the timely and effective transfer of the Services without disruption to routine operational requirements. 25.2 The Contractor will, within 3 months of the Effective Date, deliver to the DFE, a plan which sets out the Contractor’s proposals for achieving an orderly transition of Services from the Contractor to the DFE and/or its Replacement Contractor at the end of the Term (an “Exit Plan”). 25.3 Within 30 days of the submission of the Exit Plan, both Parties will use reasonable endeavours to agree the Exit Plan .If Plan. If the Parties are unable to agree the Exit Plan the dispute shall be referred to the dispute resolution procedure in clause 36. 25.4 The Contractor will review and (if appropriate) update the Exit Plan in the first month of each year of the Term to reflect changes to the Services. Following such update update, the Contractor will submit the revised Exit Plan to the DFE for review. Within 30 days following submission of the revised Exit Plan, the Parties shall meet and use reasonable endeavours to agree the revised Exit Plan and the changes that have occurred in the Services since the Exit Plan was last agreed. If the Parties are unable to agree the revised Exit Plan within 30 days, such dispute shall be referred to the dispute resolution procedure in clause 36. 25.5 If the Contractor: : 25.5.1 does not have to use resources to comply with this clause 25 in addition to those normally used to deliver the Services prior to termination or expiry, there shall be no change to the Charges; or 25.5.2 reasonably incurs additional costs the Parties shall agree a variation of the Charges. 25.6 If the DFE requests, the Contractor shall deliver to the DFE details of all licences for software used in the provision of the Services including the software licence agreements. 25.7 Within one month of receiving the software licence information described above, the DFE shall notify the Contractor of the licences it wishes to be transferred, and the Contractor shall provide for the approval of the DFE a plan for licence transfer. 25.8 The Contractor shall co-operate fully with the DFE in order to enable an efficient and detailed knowledge transfer from the Contractor to the DFE at the end of the Term and shall provide the DFE free of charge with full access to Personnel, copies of all documents, reports, summaries and any other information requested by the DFE. The Contractor shall comply with the DFE’s request for information no later than 15 Business Days from the date that that request was made.

Appears in 1 contract

Sources: Contract for Skills Bootcamps

Exit Management. 25.1 If the DFE requires a continuation of all or any of the Services at the end of the Term, either by performing them itself or by engaging a third party to perform them, the Contractor shall co-operate fully with the DFE and any such third party and shall take all reasonable steps to ensure the timely and effective transfer of the Services without disruption to routine operational requirements. 25.2 The Contractor will, within 3 months of the Effective Date, deliver to the DFE, a plan which sets out the Contractor’s proposals for achieving an orderly transition of Services from the Contractor to the DFE and/or its Replacement Contractor at the end of the Term (an “Exit Plan”). 25.3 Within 30 days of the submission of the Exit Plan, both Parties will use reasonable endeavours to agree the Exit Plan .If the Parties are unable to agree the Exit Plan the dispute shall be referred to the dispute resolution procedure in clause 36. 25.4 The Contractor will review and (if appropriate) update the Exit Plan in the first month of each year of the Term to reflect changes to the Services. Following such update the Contractor will submit the revised Exit Plan to the DFE for review. Within 30 days following submission of the revised Exit Plan, the Parties shall meet and use reasonable endeavours to agree the revised Exit Plan and the changes that have occurred in the Services since the Exit Plan was last agreed. If the Parties are unable to agree the revised Exit Plan within 30 days, such dispute shall be referred to the dispute resolution procedure in clause 36. 25.5 If If, in performing its obligations under this Clause, the Contractor: 25.5.1 does not have to use resources in addition to those normally used to deliver the Services prior to termination or expiry, there shall be no change to the Charges; or 25.5.2 reasonably incurs additional costs the Parties shall agree a variation of the Charges. 25.6 If the DFE requests, the Contractor shall deliver to the DFE details of all licences for software used in the provision of the Services including the software licence agreements. 25.7 Within one month of receiving the software licence information described above, the DFE shall notify the Contractor of the licences it wishes to be transferred, and the Contractor shall provide for the approval of the DFE a plan for licence transfer. 25.8 The Contractor shall co-operate fully with the DFE in order to enable an efficient and detailed knowledge transfer from the Contractor to the DFE at the end of the Term and shall provide the DFE free of charge with full access to Personnel, copies of all documents, reports, summaries and any other information requested by the DFE. The Contractor shall comply with the DFE’s request for information no later than 15 Business Days from the date that that request was made.

Appears in 1 contract

Sources: Breakfast Clubs Programme Contract

Exit Management. 25.1 If the DFE ESFA requires a continuation of all or any of the Services at the end of the Term, either by performing them itself or by engaging a third party to perform them, the Contractor shall co-operate fully with the DFE ESFA and any such third party and shall take all reasonable steps to ensure the timely and effective transfer of the Services without disruption to routine operational requirements. 25.2 The Contractor will, within 3 months of the Effective Date, deliver to the DFEESFA, a plan which sets out the Contractor’s proposals for achieving an orderly transition of Services from the Contractor to the DFE ESFA and/or its Replacement Contractor at the end of the Term (an “Exit Plan”). 25.3 Within 30 days of the submission of the Exit Plan, both Parties will use reasonable endeavours to agree the Exit Plan .If the Parties are unable to agree the Exit Plan the dispute shall be referred to the dispute resolution procedure in clause 36. 25.4 The Contractor will review and (if appropriate) update the Exit Plan in the first month of each year of the Term to reflect changes to the Services. Following such update the Contractor will submit the revised Exit Plan to the DFE ESFA for review. Within 30 days following submission of the revised Exit Plan, the Parties shall meet and use reasonable endeavours to agree the revised Exit Plan and the changes that have occurred in the Services since the Exit Plan was last agreed. If the Parties are unable to agree the revised Exit Plan within 30 days, such dispute shall be referred to the dispute resolution procedure in clause 36. 25.5 If the Contractor: 25.5.1 does not have to use resources in addition to those normally used to deliver the Services prior to termination or expiry, there shall be no change to the Charges; or 25.5.2 reasonably incurs additional costs the Parties shall agree a variation of the Charges. 25.6 If the DFE ESFA requests, the Contractor shall deliver to the DFE ESFA details of all licences for software used in the provision of the Services including the software licence agreements. 25.7 Within one month of receiving the software licence information described above, the DFE ESFA shall notify the Contractor of the licences it wishes to be transferred, and the Contractor shall provide for the approval of the DFE ESFA a plan for licence transfer. 25.8 The Contractor shall co-operate fully with the DFE ESFA in order to enable an efficient and detailed knowledge transfer from the Contractor to the DFE ESFA at the end of the Term and shall provide the DFE ESFA free of charge with full access to Personnel, copies of all documents, reports, summaries and any other information requested by the DFEESFA. The Contractor shall comply with the DFEESFA’s request for information no later than 15 Business Days from the date that that request was made.

Appears in 1 contract

Sources: Contract

Exit Management. 25.1 If the DFE requires a continuation of all or any of the Services at the end of the Term, either by performing them itself or by engaging a third party to perform them, the Contractor shall co-operate fully with the DFE and any such third party and shall take all reasonable steps to ensure the timely and effective transfer of the Services without disruption to routine operational requirements. 25.2 The Contractor will, within 3 months of the Effective Date, deliver to the DFE, a plan which sets out the Contractor’s proposals for achieving an orderly transition of Services from the Contractor to the DFE and/or its Replacement Contractor at the end of the Term (an “Exit Plan”). 25.3 Within 30 days of the submission of the Exit Plan, both Parties will use reasonable endeavours to agree the Exit Plan .If Plan. If the Parties are unable to agree the Exit Plan the dispute shall be referred to the dispute resolution procedure in clause 36. 25.4 The Contractor will review and (if appropriate) update the Exit Plan in the first month of each year of the Term to reflect changes to the Services. Following such update the Contractor will submit the revised Exit Plan to the DFE for review. Within 30 days following submission of the revised Exit Plan, the Parties shall meet and use reasonable endeavours to agree the revised Exit Plan and the changes that have occurred in the Services since the Exit Plan was last agreed. If the Parties are unable to agree the revised Exit Plan within 30 days, such dispute shall be referred to the dispute resolution procedure in clause 36. 25.5 If the Contractor: 25.5.1 does not have to use resources in addition to those normally used to deliver the Services prior to termination or expiry, there shall be no change to the Charges; or 25.5.2 reasonably incurs additional costs the Parties shall agree a variation of the Charges. 25.6 If the DFE requests, the Contractor shall deliver to the DFE details of all licences for software used in the provision of the Services including the software licence agreements. 25.7 Within one month of receiving the software licence information described above, the DFE shall notify the Contractor of the licences it wishes to be transferred, and the Contractor shall provide for the approval of the DFE a plan for licence transfer. 25.8 The Contractor shall co-operate fully with the DFE in order to enable an efficient and detailed knowledge transfer from the Contractor to the DFE at the end of the Term and shall provide the DFE free of charge with full access to Personnel, copies of all documents, reports, summaries and any other information requested by the DFE. The Contractor shall comply with the DFE’s request for information no later than 15 Business Days from the date that that request was made.

Appears in 1 contract

Sources: Contract for a Delivery Centre to Support the Behaviour Hubs Programme