Final Cleaning Up Sample Clauses

Final Cleaning Up. At completion of the WORK and prior to final acceptance by ▇▇▇▇▇▇▇, a thorough cleaning of the areas affected shall be carried out by CONTRACTOR. The following list is not inclusive, but to act as a guideline:
Final Cleaning Up. Upon completion and before final acceptance of the Work, the Contractor shall remove and dispose of all falsework, excavated or useless material, rubbish, temporary buildings, bridges and approaches; replace or renew any fences damaged, and restore in an acceptable manner all property, both public and private, which may have been used or damaged during the prosecution of the Work. The Contractor shall replace signs, mailboxes, or other necessary appurtenances which have been temporarily removed. All excavated material and falsework placed in stream channels during construction shall be removed. The Contractor shall thoroughly clean all pavements, sewers, manholes, catch basins, and other structures affected by his operations whether within or outside of the limits of his Work. The Contractor shall remove from the Right-of-Way and/or the project limits all machinery and equipment and all surplus materials and leave it in a neat and presentable condition, satisfactory to the Engineer. If the Contractor fails to clean up as provided in the Contract Documents, the County may do so and the cost thereof shall be charged to the Contractor from any available source, including but not limited to progress payments, performance bonds and retainage.
Final Cleaning Up. Upon completion and before final acceptance of the Work, the Contractor shall remove and dispose of all falsework, excavated or useless material, rubbish, temporary buildings, bridges and approaches; replace or renew any fences damaged, and restore in an acceptable manner all property, both public and private, which may have been used or damaged during the prosecution of the Work. The Contractor shall replace all appurtenances which have been temporarily removed. The Contractor shall thoroughly clean all structures affected by his operations whether within or outside of the limits of his Work. The Contractor shall remove all machinery and equipment and all surplus materials and leave the Work premises in a neat and presentable condition, satisfactory to the Engineer. If the Contractor fails to clean up as provided in the Contract Documents, the County may doso and the cost thereof shall be charged to the Contractor from any available source, including but not limited to progress payments, performance bonds and retainage.
Final Cleaning Up. Upon completion of the work, and before acceptance and final payment, the Contractor shall clean the project areas and remove all surplus and discarded materials, falsework, rubbish and temporary structures and restore in an acceptable manner all property, both public and private, which has been damaged during the prosecution of the work, and shall leave the improvement in a neat and presentable condition throughout the entire length of the improvement under contract to the satisfaction of the Project Manager. If the Conditions as noted above are not corrected immediately, the Project Manager may declare an emergency and take necessary action in accordance with the Section Emergency Cleanup Work of this specification.
Final Cleaning Up. A. Before final acceptance of the work, the Contractor shall remove all unused material and rubbish from the site of the work, remedy any objectionable conditions the Contractor may have created on private property, and leave the project site in a neat and presentable condition. The Contractor shall make no agreement which allows salvaged or unused material to remain on private property within view of the project except when consistent with previous land use. B. All ground occupied by the Contractor in connection with the work, which is within view of or adjacent to a road, shall be restored. Restoration shall include appropriate smoothing to its original condition and may include making the area suitable for cultivation and, where vegetation has been disturbed, seeding of the area. 1. Unless otherwise provided for, the Contractor shall be responsible for securing waste privileges on private property. The general Contractor shall be responsible for cleanup of subcontractors at the completion of all work. C. This article is not intended to restrict burning in accord with applicable regulations. D. Final clean up shall be subject to approval of the Engineer.
Final Cleaning Up. Upon completion of the work and before acceptance and final payment will be made, the Contractor shall clean and remove from the site of the work surplus and discarded materials, temporary structures, barricades and other warning devices, stumps and portions of trees and debris of any kind. The Contractor shall leave the site or the work in a neat and orderly condition. Waste materials removed from the site of the work shall be disposed of at locations satisfactory to the City Engineer and which are in compliance with Federal, State and City of Oklahoma City requirements.
Final Cleaning Up. Final Cleaning Up will be listed in the TCP Item List under the Indirect Costs Category. Full compensation for final cleaning up will be considered as included in the prices paid for the various contract items of work and no separate payment will be made therefore or would be paid for separately in an approved Schedule of Values. Before final inspection of the Work, Contractor shall perform all of the following: I. Clean all areas of the Work, material sites, and all ground occupied by Contractor in connection with the Work of all rubbish, excess materials, falsework, temporary structures, and equipment. All parts of the Work shall be left in a neat and presentable condition. II. Remove from the project all loose material of any nature, except spare parts, loose furniture or furnishings, manuals and parts books, and similar items. Ill. Remove all temporary buildings, utility lines or pipes, and other work of a temporary nature within such time.
Final Cleaning Up. Upon completion and before final acceptance the Contractor shall perform the final cleaning up as specified.

Related to Final Cleaning Up

  • CLEANING UP 4.15.1 Before commencement of any on-site activities, Contractor is required to prepare and submit to the Project Manager a Construction Site Waste Reduction Plan. A sample plan is available at: ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇▇.▇▇.▇▇/dec/wastediv/recycling/CandD.htm . Failure to comply with this provision or a failure to comply with the plan itself will result in withholding of general conditions’ money from the contractor’s monthly requisition until Contractor has rectified the situation and is in full compliance with these provisions. 4.15.2 The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish. At the completion of the Work he shall remove all his waste materials and rubbish from and about. the Project as well as all his tools, construction equipment, machinery and surplus materials and shall leave the premises in a clean and satisfactory condition. 4.15.3 If the Contractor fails to clean up at the completion of the Work, the State may do so as provided in Paragraph 3.4 and the cost thereof shall be charged to the Contractor.

  • Total Operating Expenses All costs and expenses paid or incurred by the Company, as determined under GAAP, that are in any way related to the operation of the Company or its business, including the Advisory Fee, but excluding (i) the expenses of raising capital such as Organization and Offering Expenses, legal, audit, accounting, underwriting, brokerage, listing, registration, and other fees, printing and other such expenses and taxes incurred in connection with the issuance, distribution, transfer and registration of securities, (ii) interest payments, (iii) taxes, (iv) non-cash expenditures such as depreciation, amortization and bad debt reserves, (v) incentive fees paid in compliance with the NASAA REIT Guidelines; (vi) acquisition fees and Acquisition Expenses, (vii) real estate commissions on the sale of Real Property, and (viii) other fees and expenses connected with the acquisition, disposition, management and ownership of real estate interests, mortgages or other property (including the costs of foreclosure, insurance premiums, legal services, maintenance, repair, and improvement of property). The definition of “Total Operating Expenses” set forth above is intended to encompass only those expenses which are required to be treated as Total Operating Expenses under the NASAA REIT Guidelines. As a result, and notwithstanding the definition set forth above, any expense of the Company which is not part of Total Operating Expenses under the NASAA REIT Guidelines shall not be treated as part of Total Operating Expenses for purposes hereof. 2%/25% Guidelines. 2%/25% Guidelines shall have the meaning set forth in Section 13.

  • WINDOW CLEANING Tenant shall not clean, nor require, permit, suffer or allow any window in the Premises to be cleaned from the outside in violation of Section 202 of the Labor Law, or any other Requirement, or of the rules of the Board of Standards and Appeals, or of any other board or body having or asserting jurisdiction.

  • Final Completion The full and final completion of all Work in accordance with the Contract Documents.

  • Final Completion Date Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by October 31, 2024.