Fire Hydrant Assembly Sample Clauses

The Fire Hydrant Assembly clause defines the requirements and standards for installing fire hydrant systems within a project. It typically outlines the specifications for materials, installation procedures, and testing protocols to ensure the hydrants are properly connected to the water supply and function as intended in emergencies. By setting clear guidelines, this clause ensures that fire safety infrastructure is reliable and compliant with local regulations, thereby reducing risks associated with fire hazards.
Fire Hydrant Assembly. Fire hydrant assemblies shall be paid for at the unit price per each hydrant installed and shall cover the cost for all materials, transportation, labor, equipment, excavation, sheeting and shoring, installation of the fire hydrant assemblies (all configurations), vertical extensions, tapping sleeve, valve, hydrant lead piping, joint connections, fittings, tees, restraints, crushed stone drain, polyethylene encasement, protection of existing utilities, valve box, concrete pad or collar, valve identification disc, valve marker, valve tag, chlorine for disinfection, disinfection, backfilling, backfill material, disposal of unsuitable backfill materials, tamping, testing, densities, utility crossings, dewatering, trench stabilization, clean-up, restoration, and all work and materials necessary to install the fire hydrant assembly and place it in service.
Fire Hydrant Assembly. 1. Fire hydrants shall be the compressive, post style, dry barrel type, and shall conform to the requirements of ANSI/AWWA C502 and local code requirements. The valve opening shall not be less than 4½-inch (115 mm). All hydrants shall be complete including joint assemblies. 2. Hydrants shall be suitable for working pressure of 150 psi and shall be hydrostatically factory tested to 300 psi. 3. All working parts, including the seat ring, shall be removable through the top without excavating or disturbing the barrel of the hydrant. 4. Hydrants shall be constructed with a lubricant chamber which encloses the operating threads and which provides automatic lubrication of the threads and bearing surfaces each time the hydrant is operated. This assembly shall be comprised of a top O-ring serving as a dirt and moisture barrier and a lower O-ring which will serve as a pressure seal. 5. Hydrants shall include two 2½-inch (65 mm) hose nozzles and one 4½-inch (115 mm) pumper connection with National Standard Fire Hose Threads unless specified otherwise in the Plans or The Facility Owner’s Standard Specifications. Hydrant threads shall comply with the specifications of the local agency providing fire service. 6. Hydrant nozzle shall be constructed to face in any direction at any time by removing the safety flange bolts and revolving the head without digging or shutting off water. 7. Hydrants shall have pentagon operating nut measuring 1½-inch (40 mm) point to flat and shall open by turning counter-clockwise. 8. Hydrant shall have a safety-type vertical barrel with a minimum 3½-foot bury and be designed with safety flange and/or bolts to protect the barrel and stem from damage, eliminate flooding, and allow rapid replacement if hydrant is struck. All risers necessary for deeper bury applications shall be provided by the hydrant manufacturer. 9. Hydrants shall include positive, automatic drain valves which shall be fully closed when the main valve is open. 10. Bottom inlet of hydrant shall be provided with mechanical joint connection complete with accessories as specified and shall be 6-inch (150 mm) nominal diameter. 11. Fire hydrant shall be painted above ground with rust inhibiting enamel paint in accordance with The Facility Owners Standard Specifications. 12. Hydrant assemblies shall be restrained from the hydrant to the tee at the main.
Fire Hydrant Assembly. 1. Fire hydrants shall be the compressive, post style, dry barrel type, and shall conform to the requirements of ANSI/AWWA C502 and local code requirements. The valve opening shall not be less than 4½-inch (115 mm). All hydrants shall be complete including joint assemblies. 2. Hydrants shall be suitable for working pressure of 150 psi and shall be hydrostatically factory tested to 300 psi. 3. All working parts, including the seat ring, shall be removable through the top without excavating or disturbing the barrel of the hydrant. 4. Hydrants shall be constructed with a lubricant chamber which encloses the operating threads and which provides automatic lubrication of the threads and bearing surfaces each time the hydrant is operated.
Fire Hydrant Assembly. This bid item shall be paid on a per each (EA) basis. The price shall include all materials, labor, and equipment necessary for a complete installation including pavement cutting, soil and rock excavation, excavated material storage and/or off‐site disposal, stone base, the tee and its installation, the 6‐inch connecting pipe and its installation, the 6‐inch valve and its installation, the valve box and its installation, the hydrant and its installation, all necessary harnessing and restraint and their installation, concrete and its placement, backfill and compaction, testing, disinfection, tracer wire and marking tape installation, and any other items necessary for a complete, working water system. Unless otherwise specified, the unit price shall also include the abandonment of existing facilities, including the cutting and plugging/capping of existing lines, the demolition and removal of existing valve vaults and fire hydrants and any other existing water line appurtenances, and complete restoration, including topsoiling, seeding, mulching, landscape restoration, and any other activity necessary to restore the disturbed area to original or improved condition.

Related to Fire Hydrant Assembly

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Electrical appliance safety The Hirer shall ensure that any electrical appliances brought by them to the premises and used there shall be safe, in good working order, and used in a safe manner in accordance with the Electricity at Work Regulations 1989. Where a residual circuit breaker is provided the hirer must make use of it in the interests of public safety.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Assembly (a) The Contracting Parties shall have an Assembly. (b) Each Contracting Party shall be represented by one delegate who may be assisted by alternate delegates, advisors and experts. (c) The expenses of each delegation shall be borne by the Contracting Party that has appointed the delegation. The Assembly may ask WIPO to grant financial assistance to facilitate the participation of delegations of Contracting Parties that are regarded as developing countries in conformity with the established practice of the General Assembly of the United Nations or that are countries in transition to a market economy. (a) The Assembly shall deal with matters concerning the maintenance and development of this Treaty and the application and operation of this Treaty. (b) The Assembly shall perform the function allocated to it under Article 26(2) in respect of the admission of certain intergovernmental organizations to become party to this Treaty. (c) The Assembly shall decide the convocation of any diplomatic conference for the revision of this Treaty and give the necessary instructions to the Director General of WIPO for the preparation of such diplomatic conference. (a) Each Contracting Party that is a State shall have one vote and shall vote only in its own name. (b) Any Contracting Party that is an intergovernmental organization may participate in the vote, in place of its Member States, with a number of votes equal to the number of its Member States which are party to this Treaty. No such intergovernmental organization shall participate in the vote if any one of its Member States exercises its right to vote and vice versa. (4) The Assembly shall meet in ordinary session once every two years upon convocation by the Director General of WIPO. (5) The Assembly shall establish its own rules of procedure, including the convocation of extraordinary sessions, the requirements of a quorum and, subject to the provisions of this Treaty, the required majority for various kinds of decisions.