For Basic Services Having A Determined Scope -- Lump Sum Method of Payment Clause Samples

For Basic Services Having A Determined Scope -- Lump Sum Method of Payment. A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of Engineer’s Resident Project Representative and Post-Construction Phase services, if any, as follows: Engineer shall perform Basic Services for the Study and Report Phase and for the Final Design Phase under a Lump Sum method of payment and shall perform Basic Services for the Preliminary Design & Permitting Phase, Bidding and Negotiating Phase, and the Construction Phase under an Hourly Rate Plus Expenses with a not-to-exceed Estimated Fee based on the written limitations of the estimated scope. For Basic Services that have an estimated scope, if Owner desires additional work effort, Engineer shall perform such additional work effort under C4.02, Hourly Rates for Basic Services or C4.03, Additional Services, as determined by the Owner. The following table summarizes payments to Engineer for the Basic Services as defined in Exhibit A: Lump Sum NTE Fee Estimate % of Total a. Study and Report Phase $3,909.00 NA 6% b. Preliminary Design & Permitting Phase NA $23,963.00 35% c. Final Design Phase $22,157.00 NA 32% d. Bidding and Negotiating Phase NA $4,189.00 6% e. Construction Phase NA $15,164.00 22% TOTAL $26,066.00 $43,316.00 100% The total compensation to Engineer for Basic Services as defined in Exhibit A is not to exceed $69,382. 1. A Lump Sum amount of $ 26,066.00 based on the above assumed distribution of compensation for the Study and Report Phase and the Final Design Phase. 2. Engineer may alter the distribution of compensation between individual phases noted herein to be consistent with services actually rendered, but shall not exceed the total Lump Sum amount unless approved in writing by the Owner. 3. The Lump Sum includes compensation for Engineer’s services and services of Engineer’s Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to account for labor, overhead, profit, and Reimbursable Expenses. 4. The portion of the Lump Sum amount billed for Engineer’s services will be based upon Engineer’s reasonable estimate of the proportion of the total services actually completed during the billing period to the Lump Sum. 5. The Lump Sum is conditioned on Contract Times to complete the two phases of Work not exceeding 3 months. This does not include City-County-State Review and Approval times, or other Authority Having Jurisdiction approvals, which are considered part of the Preliminary Design & Permitting Phase. Should the Contract...
For Basic Services Having A Determined Scope -- Lump Sum Method of Payment. OWNER shall pay ENGINEER for Basic Services set forth in Exhibit A, Part 1 except for Study and Report Phase and services of ENGINEER’S Resident Project Representative and Post-Construction Phase services, if any, as follows:
For Basic Services Having A Determined Scope -- Lump Sum Method of Payment. A. OWNER shall pay ENGINEER for Basic Services set forth in Exhibit A, as follows: 1. Lump Sum Amount of $180,000.00. for Basic Services based on the following assumed distribution of compensation. ENGINEER may alter the distribution of compensation between individual phases noted herein to be consistent with services actually rendered but shall not exceed the total Lump Sum amount unless approved in writing by the OWNER. TASK I Design Documents $ 142,000.00 TASK II Bid Opening and Awarding $ 8,000.00 TASK III Construction Administration $ 30,000.00 2. The Lump Sum includes compensation for ENGINEER’s services and services of ENGINEER’s Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to account for labor, overhead, profit, and reimbursable expenses. 3. The portion of the Lump Sum amount billed for ENGINEER’s services will be based upon ENGINEER’s estimate of the proportion of the total services actually completed during the billing period to the Lump Sum.

Related to For Basic Services Having A Determined Scope -- Lump Sum Method of Payment

  • Compensation for Basic Services 6.1.1 Compensation for Basic Services as described in Section 3.1 and 3.2 shall be as set forth in Article 11.

  • Interconnection Customer Compensation If the CAISO requests or directs the Interconnection Customer to provide a service pursuant to Articles 9.6.3 (Payment for Reactive Power) or 13.5.1 of this LGIA, the CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff.

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • Developer Compensation for Emergency Services If, during an Emergency State, the Developer provides services at the request or direction of the NYISO or Connecting Transmission Owner, the Developer will be compensated for such services in accordance with the NYISO Services Tariff.

  • Intercarrier Compensation Except as specifically described in this Section, the Agreement does not change or amend applicable intercarrier compensation arrangements (including but not limited to Switched Access, Signaling, or Transit charges) between any parties, including between Qwest and Carriers or IXCs.