HVAC Filters Sample Clauses

The HVAC Filters clause establishes requirements for the maintenance, replacement, or specification of filters used in heating, ventilation, and air conditioning systems. Typically, it outlines the type, quality, and frequency of filter changes that must be adhered to by the responsible party, such as a building owner or tenant. By setting these standards, the clause ensures proper air quality, system efficiency, and helps prevent equipment damage or health issues caused by inadequate filtration.
POPULAR SAMPLE Copied 7 times
HVAC Filters. Tenant is responsible to change HVAC filter a minimum of 2 times per year, once in the spring and once in the winter. An exception being if the HVAC unit is located in the crawl space of the property.
HVAC Filters. Supply and changing of heating and air conditioning filters will be performed by: (check one) _ Tenant, on a monthly basis; X Landlord, per Landlord's schedule
HVAC Filters. Broker shall have HVAC filters delivered to Tenant's home approximately every ninety (90) days as part of the monthly Lease Administrative Fee. Tenant shall properly install the filter that is provided within two (2) days of receipt. Tenant hereby acknowledges that the filters will be dated and subject to inspection by Broker upon reasonable notice to verify replacement has been timely made. If at any time Tenant is unable to properly or timely install a filter, Tenant shall immediately notify Broker in writing. Tenant's failure to properly and timely replace the filters is a material breach of this Agreement and Broker shall be entitled to exercise all rights and remedies it has against Tenant, and Tenant shall be liable to Landlord for all damages to the property, A/C or heating system caused by ▇▇▇▇▇▇'s neglect or misuse.

Related to HVAC Filters

  • HVAC Heating, ventilating and air conditioning.

  • Illumination Normal and emergency AC and DC illumination shall be provided adequately in the control room and other buildings of the substation. The switchyard shall also be provided with adequate illumination. The lighting of the entire control room building, fire-fighting pump house, other building (if any) and switchyard shall be done by LED based low power consumption luminaries.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.

  • Heating The Hirer shall ensure that no unauthorised heating appliances shall be used on the premises when open to the public without the consent of the management committee. Portable Liquefied Propane Gas (LPG) heating appliances shall not be used.

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the