INSPECTION AND CORRECTION OF WORK Sample Clauses

POPULAR SAMPLE Copied 1 times
INSPECTION AND CORRECTION OF WORK. All Work shall be subject to inspection by Owner and/or the Architect at all reasonable times and at all places. Any such inspections are for the sole benefit of Owner and shall not relieve the Contractor of the responsibility for providing quality control measures to assure that the Work strictly complies with the Contract Documents. No inspection by Owner or its Representatives shall be construed as constituting or implying either a waiver or acceptance. Inspections shall not relieve Contractor of responsibility for damage to or loss of material prior to acceptance, nor in any way affect the continuing rights of Owner after acceptance of the completed Work.
INSPECTION AND CORRECTION OF WORK. 12.1 Periodic Inspections 40 12.2 Access to and Dismantling of Work 41 12.3 Correction of Work 41 12.4 Work Affected by Corrective Work 41 12.5 Owner Acceptance of Non-Conforming Work 41 12.6 Removal From Site 41 12.7 Observance of Tests 41
INSPECTION AND CORRECTION OF WORK. All Work shall be subject to inspection by Cherokee Nation Entertainment, its Owner’s Representative, and/or the Architect at all reasonable times and at all places. Any such inspections are for the sole benefit of Cherokee Nation Entertainment and shall not relieve the Contractor of the responsibility for providing quality control measures to assure that the Work strictly complies with the Contract Documents. No inspection by Cherokee Nation Entertainment or its Representatives shall be construed as constituting or implying either a waiver or acceptance. Inspections shall not relieve Contractor of responsibility for damage to or loss of material prior to acceptance, nor in any way affect the continuing rights of Cherokee Nation Entertainment after acceptance of the completed Work.
INSPECTION AND CORRECTION OF WORK. The Contractor shall keep the Town informed of the progress of his work. No work shall be closed or covered until it has been duly inspected and approved. Should uninspected work be covered, the Contractor shall, at his own expense, uncover all such work so that it can be properly inspected and after such inspection, he shall properly repair and replace all work interfered with. All work, all materials (whether incorporated in the work or not) and all processes for performing the work shall be at all times and places subject to the inspection, examination and testing by the Town, which shall be the final judge of the quality and suitability of the work, materials and processes for the purpose for which they are used. The Town shall have the right to reject defective material and workmanship or require its correction. Rejected material shall immediately be removed from the site. If, in the opinion of the Town, it is undesirable to replace any defective or damaged materials or to correct any portion of the work not performed in accordance with the Contract Documents, the compensation to be paid to the Contractor hereunder shall be reduced by such amount as in the judgment of the Director shall be equitable. If the Contractor fails to proceed at once with the replacement of rejected material and/or the correction of defective workmanship, the Town may, by contract or otherwise, replace such material and/or correct such workmanship and charge the cost to the Contractor, or may terminate the right of the Contractor to proceed, the Contractor and Surety being liable for any damage to the same extent as provided.
INSPECTION AND CORRECTION OF WORK 

Related to INSPECTION AND CORRECTION OF WORK

  • Inspection of Work CONSULTANT and any subconsultant shall permit LOCAL AGENCY, the State, and the FHWA if federal participating funds are used in this AGREEMENT; to review and inspect the project activities and files at all reasonable times during the performance period of this AGREEMENT.

  • Uncovering and Correction of Work 12.1 The Contractor shall promptly correct Work rejected by the Owner or failing to conform to the requirements of the Contract Documents, whether observed before or after Substantial Completion and whether or not fabricated, installed or completed, and shall correct any Work found to be not in accordance with the requirements of the Contract Documents within a period of two years from the date of Substantial Completion, or by terms of an applicable special warranty required by the Contract Documents. The provisions of this Article apply to work done by Subcontractors as well as to Work done by direct employees of the Contractor. 12.2 At any time during the progress of the work, or in any case where the nature of the defects shall be such that it is not expedient to have them corrected, the Owner, at their option, shall have the right to deduct such sum, or sums, of money from the amount of the contract as they consider justified to adjust the difference in value between the defective work and that required under contract including any damage to the structure.

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • CORRECTION OF WORK 13.2.1 The Contractor shall be responsible for correcting all Work which the Architect has found to be defective or which fails to conform to the Contract Documents whether observed be- fore or after Substantial Completion and whether or not fabricated, installed or completed. The Contractor shall bear all costs of correcting such rejected Work, including compensation for the Architect's and the State’s additional services made necessary thereby. 13.2.2 If, within one year after the Date of Substantial Completion of the Work or designated portion thereof or within one year after acceptance by the State of designated equipment or within such longer period of time as may be prescribed by law or by the terms of any applicable special warranty required by the Contract Documents, any of the Work is found to be defective or not in accordance with the Contract Documents, the Contractor shall correct it promptly after receipt of a written notice from the State to do so unless the State has previously given the Contractor a written acceptance of such condition. This obligation shall survive termination of the Contract. The State shall give such notice promptly after discovery of the condition. 13.2.3 The Contractor shall remove from the site all portions of the Work which are defective or non-conforming and which have not been corrected under Subparagraphs 4.5.1, 13.2.1 and 13.2.4 If the Contractor fails to correct defective or nonconforming Work as provided in Subparagraphs 4.5.1, 13.2.1 and 13.2.2, the State may correct it in accordance with Paragraph 13.2.5 If the Contractor does not proceed with the correction of such defective or non- conforming Work within a reasonable time fixed by written notice from the Architect, the State may remove it and may store the materials or equipment at the expense of the Contractor. If the Contractor does not pay the cost of such removal and storage within ten days thereafter, the State may upon ten additional days written notice sell such Work at auction or at private sale and shall account for the net proceeds thereof, after deducting all the costs that should have been borne by the Contractor, including compensation for the Architect's and the State’s additional services and expenses made necessary thereby. If such proceeds of sale do not cover all costs which the Contractor should have borne, the difference shall be charged to the Contractor and an appropriate Change Order shall be issued. If the payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay the difference to the State. 13.2.6 The Contractor shall bear the cost of making good all work of the State or separate contractors destroyed or damaged by such correction or removal. 13.2.7 Nothing contained in this Paragraph 13.2 shall be construed to establish a period of limitation with respect to any other obligation which the Contractor might have under the