Installation manual, Sample Clauses

The Installation Manual clause defines the requirement for providing detailed instructions on how to properly install a product or system. Typically, this clause obligates the supplier or contractor to deliver a comprehensive manual that includes step-by-step procedures, safety precautions, and necessary technical specifications for installation. By ensuring that end users or installers have clear and accurate guidance, this clause helps prevent improper installation, reduces the risk of damage or malfunction, and supports compliance with relevant standards.
Installation manual,. End-user service manual.
Installation manual,. 12.1. Scope This section specifies the minimum requirements that shall be contained in the manual.
Installation manual,. End-user manual.
Installation manual,. Purchaser must prepare and deliver to each of Purchaser’s direct customers an installation manual for the OEM Products as required by applicable law. Further, in addition to Purchaser’s indemnification obligations under Section 15(b) of the Agreement, Purchaser agrees to defend at its own expense any action brought against Evergreen to the extent that it is based on a claim arising out of or relating to Purchaser’s breach of this Section 4(a).
Installation manual,. Under each PO, Seller shall provide Owner with a Supervisory Installation Manual to guide Owner and Owner’s contractors in the installation of Equipment (the “Installation Manuals”) provided by Seller no later than four (4) weeks prior to the first major shipment of Equipment to Owner’s Facility or such other time as may specified in the PO. Such Manual may be provided in installments if the Equipment is shipped in installments. Seller may from time to time provide reasonable updates to such manual at its discretion.
Installation manual,. The Contractor shall deliver an Installation Manual which describes actions necessary properly install and render operational a CTX 5000SP.
Installation manual,. 1. At the first turn-on, if fail to enter, please select SATA DOM as the first prior turn-on device in BIOS. 2. At the first entrance into system, if tip for HDD formatting, when you need recording, please click “yes”, if no need, please click ”no”. Notice! After HDD formatting, the existing DATA will be non-recoverable. If no tip, it indicates the HDD has been formatted before shipment.

Related to Installation manual,

  • Project Manual A bound manual prepared by the Design Professional. It includes the Invitation to Bid, Instructions to Bidders, the Bid Form, the Specifications, the General Conditions and Supplementary General Conditions.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Installation Services The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

  • Installation When installation is required, the Contractor shall be responsible for placing and installing the Commodities or parts in the required locations at no additional charge. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the Commodity or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, tools, rigging, labor, and materials required to install or replace the Commodities or parts in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.