Installation Work Sample Clauses

The Installation Work clause defines the responsibilities and requirements related to the setup and assembly of equipment, systems, or materials at a project site. It typically outlines the standards to be met, the timeline for completion, and any necessary inspections or approvals before the work is considered finished. This clause ensures that all installation activities are performed safely, efficiently, and in accordance with agreed specifications, thereby reducing the risk of disputes over quality or delays in project delivery.
POPULAR SAMPLE Copied 1 times
Installation Work a) SPD will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS No. dated of SECI. SPD shall provide to the Buying Entity a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within thirty (30) days of the Commercial Operation Date. b) SPD shall have access as reasonably permitted by the Buying Entity to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD shall commission the System with a capacity of approximately kWp. d) SPD shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying Entity. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD shall not do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; (c) carryout any other modification of the Premises without the written consent of the Buying Entity. SPD shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ facilities owned by the Buying Entity due to the SPD, the same shall be made good/rectified by the SPD at their cost. f) SPD shall, within thirty (30) days of the Effective Date, submit to the Buying Entity shop drawings of the Project for approval ("Shop Drawings"). If the Buying Entity has any objection/recommendation in the Shop Drawings, it shall communicate the same to SPD within a period of thirty (30) working days of the date of submission of theShop Drawings. Any delay will extend the Effective Date and such approval shall not be unreasonably withheld. g) Subject to any punch-list items which shall be agreed by the SPD as not being material to completion of the Project, the SPD agrees that it shall achieve the completion of the Project/ Commissioning of the Project within the scheduled completion period from the Effective Date (“Scheduled Completion Date”). Buying Entity shall ensure that sufficient load is available at the Delivery Point to ensure synchronization and...
Installation Work. The standard working hours specified in Article 20.02 shall apply in the case of installation work.
Installation Work. Provider will cause the System to be designed, engineered, installed and constructed substantially in accordance with Schedule 1 of the Special Conditions and Applicable Law. At its request, Purchaser shall have the right to review all construction plans and designs, including engineering evaluations of the impact of the System. Provider shall perform the Installation Work at the Premises between the hours of 7:00 a.m. and 7:00 p.m. in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. This provision may be altered by a letter amendment signed by both Parties hereto. In connection with the Installation Work, Provider shall comply or cause its contractor to comply with the “Requirements Applicable to the Installation Work” specified in Exhibit B to this Agreement.
Installation Work. Provider will cause the System to be designed, engineered, installed and constructed substantially in accordance with Schedule 1, Applicable Law, and consistent with generally accepted utility practices. Purchaser shall have the right to review and comment on all construction plans and designs, including engineering evaluations of the impact of the System. Provider shall perform the Installation Work at the Premises between the hours of 7:00 a.m. and 7:00 p.m. unless otherwise agreed to in writing by the owner of the Premises. Installation Work shall be conducted in a manner that minimizes inconvenience to and interference with the use of the Premises to the maximum extent commercially practical. Provider shall consult with the issuer of any warranty on the roof at the Premises, if applicable, and shall construct the System in a way that does not invalidate any such warranty.
Installation Work. (a) The Permittee shall perform, at its sole cost and expense, all installation work required to prepare each Port Authority Facility where the Permittee is to conduct System Operations for the Permittee’s operations, including installing all transmitters, receivers, cables and other equipment and the construction of all associated improvements appurtenant to the operation of the System, provided however that the Permittee shall have no obligations with respect to the installation of proprietary base station equipment for the exclusive use of individual Carrier Users, as provided in the Carrier Agreement (the work described in this Section being hereinafter referred to, separately with respect to each Port Authority Facility, as the “Initial System Construction Work”). (i) The Permittee shall be responsible at its sole expense for retaining all architectural, engineering and other technical consultants and services as may be directed by the Port Authority and for developing, completing and submitting procedures for the installation of all equipment and the construction of all improvements appurtenant to the operation of the System. Prior to retaining any architect, professional engineer or other technical consultant in connection with the Initial System Construction Work the name or names of said architect, professional engineer or other technical consultant shall be submitted to the Port Authority for its approval. The Port Authority shall have the right to disapprove any architect, professional engineer or other technical consultant who may be unacceptable to it. The Port Authority shall approve in advance the Permittee’s contract with each such architect,” professional engineer or other technical consultant. The Port Authority hereby approves any retention by the Permittee of ▇▇▇▇▇▇ Corporation, RCC Consultants, LGC Wireless and ▇▇▇▇▇ Telecom. (ii) (1) Prior to the commencement of any Initial System Construction Work at any Port Authority Facility, the Permittee shall submit to the Port Authority for its approval a Tenant Alteration Application (hereinafter, “Construction Application”), in the form supplied by the Port Authority, and containing such terms and conditions as the Port Authority may include, setting forth in detail by appropriate plans and specifications System Construction Work the Permittee proposes to perform at such Port Authority Facility and the manner of and time periods for performing such work. The data to be supplied by the Permit...
Installation Work. Licensee and Trustees will, in accordance with the provisions of this Agreement and Applicable Law, cooperate reasonably and in good faith on the design, permitting, construction, interconnection, and installation of the System, including tasks related to the interconnection agreement for the System, so as to enable Licensee and/or its Affiliates, to meet their obligations under this Agreement. Licensee shall, at its sole cost and expense, design, build, install, own, maintain, and operate the System, as generally described in Rider I, in compliance with this Agreement and Applicable Law. With the exception of minor field changes, the construction and installation of the System and all related matters are subject to and shall be completed in accordance with this Agreement and Trustees’ approved System design and Construction Documents. A “minor field change” is defined as a change or deviation from Trustees’ approved System plans, System drawings, or Construction Documents that does not significantly affect the construction, installation, operation, or aesthetics of the System or materially deviate from the design, construction, installation, or operation of the System, as originally approved by Trustees. 8.1.1. Notwithstanding any provision herein to the contrary, Licensee acknowledges and agrees that all onsite labor employed for the installation work shall be paid at the then-current prevailing wage rates as established by the California Department of Industrial Relations pursuant to Section 1770 of the California Labor Code, and all on-site labor shall be paid in accordance with the provisions of Applicable Law, including, without limitation, the applicable provisions of the California Labor Code. All contractors and subcontractors performing on-site installation work must register with the Department of Industrial Relations (DIR) and obtain and maintain current registration numbers. At Trustees’ request in accordance with Applicable Law, Licensee and its contractors shall provide Trustees with payroll records for onsite labor employed in connection with the installation work. 8.1.2. Licensee, or Licensee’s contractors and subcontractors, shall be duly licensed by the California Contractors State License Board with contractor’s license, registered with the Department of Industrial Relations (DIR). 8.1.3. California law requires that state agencies achieve three percent (3%) participation for disabled veteran business enterprises (“DVBEs”). In connectio...
Installation Work. Provider will cause the System (by using one or more qualified contractors holding the appropriate licenses required in the jurisdiction where the System will be installed) to be designed, engineered, installed and constructed substantially in accordance with Schedule 1 of the Special Conditions and Applicable Law. At its request, Purchaser shall have the right to review all construction plans and designs, including engineering evaluations of the impact of the System. Provider shall perform the Installation Work at the Premises between the hours of 7:00 a.m. and 7:00 p.m. in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical.
Installation Work a) The Power Producer will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RFS No SECI/Cont./77/2015 dated: 09-09-2015) and the sanction letter issued by SECI. The Power Producer shall provide to the Purchaser a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within 30 days of the Commercial Operation Date. b) The Power Producer shall have access as reasonably permitted by the Purchaser to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the Power Producer shall commission the System with a capacity of KWp. Power Producer may construct a System of smaller size if it receives only part approval of government subsidies or for any other material commercial reason, as mutually agreed between the Parties in writing, In the event a System of smaller capacity is eventually agreed to be installed, the clauses pertaining to Purchase Price as set out under this Agreement shall be adjusted proportionately as per mutual agreement between the Parties in writing. d) The Power Producer shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Purchaser. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, the Power Producer shall not do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed
Installation Work. 5.1 Prior to the commencement of Installation Work, the Proponent shall file detailed Plans with the County not less than thirty (30) days prior to commencement of such Installation Work. 5.2 The County, acting reasonably and with diligence, shall review the Plans within fifteen
Installation Work a) SPD will cause the Project to be designed, manufactured, supplied, engineered, erected, tested and commissioned, operated & maintained and constructed substantially in accordance with RfS No. dated of ▇▇▇▇▇▇. SPD shall provide to the Buying Entity a bill of materials listing the major equipment constituting the System. Such bill of materials shall be provided within thirty (30) days of the Commercial Operation Date. b) SPD shall have access as reasonably permitted by the Buying Entity to perform the Installation Work at the Premises in a manner that minimizes inconvenience to and interference with the use of the Premises to the extent commercially practical. c) It is agreed between the Parties that the SPD shall commission the System with a capacity of approximately kWp. d) SPD shall provide and lay the dedicated electrical cables for transmission of Solar Power from the System up to the Delivery Point. Transmission or distribution of Solar Power beyond this point will be the responsibility of the Buying Entity. The Delivery Point shall be where the Main Metering System is located. e) Unless otherwise agreed between the Parties, SPD shall not do (a) chipping of rooftop; or (b) water proofing of roof to be disturbed; (c) carry out any other modification of the Premises without the written consent of the Buying Entity. SPD shall maintain general cleanliness of area around the Project during construction and operation period of the Project. In case any damages is caused to the equipment/ facilities owned by the Buying Entity due to the SPD, the same shall be made good/rectified by the SPD at their cost.