INTERFACE POINTS. The steam tie-point is located on the pipe rack at the eastern corner of the site, shall be in general accordance with the following: • Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Insulation: ***** • Pressure: ***** • Temperature: ***** • Minimum Steam: ***** • Tie-Point Coordinates [1]: ***** [1]: Tie-points coordinates specified are located at the Provider/Off-Taker fence line. [2]: Approximate elevation subject to final pipe rack design with allowance for 18’ of nominal clearance from bottom of truss to roadway. SCHEDULE 1.11
INTERFACE POINTS. The service water terminal point is located underground at the western boundary of the site, shall be in general accordance with the following: • USS Pipe: ***** • Pipe Size: ***** nominal diameter • Pressure Class: ***** psi • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Pressure: ***** prig • Temperature: ***** • Tie-Point Coordinates: ***** SCHEDULE 1.11
INTERFACE POINTS. The natural gas tie-point for start-up gas is located underground at the northern boundary of the site, shall be in general accordance with the following: • Temporary Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** (*****) ***** (*****) • Material Specification: ***** • Connection Type: ***** • Pressure: ***** (*****) ***** (*****) ***** • Temperature: ***** • Tie-Point Coordinates: ***** SCHEDULE 1.11
INTERFACE POINTS. The feedwater tie-point is located on the pipe rack at the eastern corner of the site, shall be in general accordance with the following: • Pipe Size: ***** • Pressure Class: ***** • Pipe Schedule: ***** • Material: ***** • Material Specification: ***** • Connection Type: ***** • Insulation: ***** • Pressure: ***** • Temperature: ***** • Tie-Point Coordinates [1]: ***** [1]: Tie-points coordinates specified are located at the Provider/Off-Taker fence line. [2]: Approximate elevation subject to final pipe rack design with allowance for 18’ of nominal clearance from bottom of truss to roadway. SCHEDULE 1.11
INTERFACE POINTS. The Coke tie-point is located at the #3 Transfer Tower at the northeastern boundary of the site, shall be in general accordance with the following: • Tie-Point Coordinates: ***** SCHEDULE 1.11 Fixed Price Component (Adjustment Period) Effective Date in year of Passage of Repeal of Section 199 Production Activities Deduction under the Code $***** 2009 (Adjustment Period = effective date through the remainder of the Term) $***** 2010 (Adjustment Period = effective date through the remainder of the Term) $***** 2011 (Adjustment Period = effective date through the remainder of the Term) $***** 2012 (Adjustment Period = effective date through the remainder of the Term) $***** 2013 (Adjustment Period = effective date through the remainder of the Term) $***** 2014 (Adjustment Period = effective date through the remainder of the Term) $***** 2015 (Adjustment Period = effective date through the remainder of the Term) $***** 2016 (Adjustment Period = effective date through the remainder of the Term) $***** 2017 (Adjustment Period = effective date through the remainder of the Term) $***** 2018 (Adjustment Period = effective date through the remainder of the Term) $***** 2019 (Adjustment Period = effective date through the remainder of the Term) $***** 2020 (Adjustment Period = effective date through the remainder of the Term) $***** 2021 (Adjustment Period = effective date through the remainder of the Term) $***** 2022 (Adjustment Period = effective date through the remainder of the Term) $***** 2023 (Adjustment Period = effective date through the remainder of the Term) $***** 2024 (Adjustment Period = effective date through the remainder of the Term) $***** 2025 (Adjustment Period = effective date through the remainder of the Term) $***** 2026 (Adjustment Period = effective date through the remainder of the Term) Fixed Price Component (Adjustment Period) Effective Date in year subsequent to passage of Repeal of Section 199 Production Activities Deduction under the Code. $***** 2009 (Adjustment Period = effective date through the remainder of the Term) $***** 2010 (Adjustment Period = effective date through the remainder of the Term) $***** 2011 (Adjustment Period = effective date through the remainder of the Term) $***** 2012 (Adjustment Period = effective date through the remainder of the Term) $***** 2013 (Adjustment Period = effective date through the remainder of the Term) $***** 2014 (Adjustment Period = effective date through the remainder of the Term) $***** ...
INTERFACE POINTS. The Coke tie-point is located at the #3 Transfer Tower at the northeastern boundary of the site, shall be in general accordance with the following: • Tie-Point Coordinates: ***** SCHEDULE 1.11 Note; Table I applies if the tax rate change is effective in the same year as the law changing the tax rate is passed, Table II applies if the tax rate change is effective in the year following the year in which the law changing the tax rate is passed. SCHEDULE 3.(b)(ii) 5. Principal and Interest Calculation Summary Interest Calculation Detail Example: Example:
INTERFACE POINTS. The primary interface points to the switchgear compartment are: Generator power connection – end/side, non–segregated phase bus flange connection Line power connection (to step–up transformer) – top/roof, non– segregated phase bus flange connection Provision for auxiliary power tap – bottom/floor, entry through gland plate
INTERFACE POINTS. The points of interface between the Power Plant and between the Owner Provided Work, which are set forth in Section 3 of Exhibit A.
INTERFACE POINTS. The Coke tie-point is located at the #3 Transfer Tower at the northeastern boundary of the site, shall be in general accordance with the following: • Tie-Point Coordinates: ***** Note; Table I applies if the tax rate change is effective in the same year as the law changing the tax rate is passed, Table II applies if the tax rate change is effective in the year following the year in which the law changing the tax rate is passed. 1. The Plant is placed in service during December 2009. 2. The assessment of the forfeiture occurs during December 2012. 3. The IRS quarterly Interest rate for large corporate underpayments is applicable. 4. No penalties or fines apply in respect of the forfeiture of the Section 48B Credit. 5. The Coke Tonnage accepted by Off-Taker from December 2009 through December 2012 is set forth in the Interest Calculation Summary herein. Initial O&M Component during the Initial Operating Period and Initial Year is the product of $***** per Ton of Coke and the Initial O&M Component adjustment factor of 1+ A, where: A = ***** Assuming the Initial Operating Period commences as of September 2009, that indexes published as of the Month during which such Initial Operating Period commences have been determined as of March 2009, and that: ***** Then “A” equals: ***** Adjustment Factor = (1+ A) = ***** Initial O&M Component ***** = $***** per Ton of Coke O&M Component Limit for Year X is the product of $***** and the adjustment factor of (1+ A). “A” is determined in the following manner: A= ***** Assume that: ***** Then “A” equals: ***** Adjustment Factor = (1+ A) = ***** O&M Component Limit for Contract Year 2012 *****= $***** per Ton of Coke 3.1 Schedule 3.3(b) Minimum Insurance Coverages and Maximum Deductibles

Related to INTERFACE POINTS

  • Interface A defined set of transmission facilities that separate Load Zones and that separate the NYCA from adjacent Control Areas. Investor-Owned Transmission Owners. A Transmission Owner that is owned by private investors. At the present time these include: Central ▇▇▇▇▇▇ Gas & Electric Corporation, Consolidated Edison Company of New York, Inc., New York State Electric & Gas Corporation, Niagara Mohawk Power Corporation, Orange and Rockland Utilities, Inc., and Rochester Gas and Electric Corporation.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Network Interface Device 2.7.1 The NID is defined as any means of interconnection of the customer’s premises wiring to BellSouth’s distribution plant, such as a cross-connect device used for that purpose. The NID is a single line termination device or that portion of a multiple line termination device required to terminate a single line or circuit at the premises. The NID features two (2) independent ▇▇▇▇▇▇▇▇ or divisions that separate the service provider’s network from the customer’s premises wiring. Each chamber or division contains the appropriate connection points or posts to which the service provider and the customer each make their connections. The NID provides a protective ground connection and is capable of terminating cables such as twisted pair cable. 2.7.2 BellSouth shall permit NewPhone to connect NewPhone’s Loop facilities to the customer’s premises wiring through the BellSouth NID or at any other technically feasible point.

  • Interfaces GTE provides the CLECs with choices for access to OSS pre-ordering, ordering, maintenance and repair systems. Availability of the interfaces is fundamental to the CLEC being able to effectively do business with GTE. Additionally, in many instances, CLEC personnel must work with the service personnel of GTE. Measurements in this category assess the availability to the CLECs of systems and personnel at GTE work centers.

  • Network Interconnection Methods 3.1 The Interconnection provided herein may not be used solely for the purpose of originating a Party’s own interexchange traffic.