Modifications/Additions to Member-Owned Renewable Generation Sample Clauses

Modifications/Additions to Member-Owned Renewable Generation. 7.1. If the Member-owned renewable generation system is subsequently modified to increase its Gross Power Rating, the Member must notify FKEC by submitting a new application and Interconnection Agreement specifying the modification at least thirty (30) calendar days prior to making the modification. 7.2. If the Member adds another Member-owned renewable generator system which i.) Utilizes the same utility inter-active inverter, or other device certified pursuant to Section 3.1 above, for both systems; and ii.) Utilizes a separate utility inter- active inverter, or other device certified pursuant to Section 3.1 above, for each system the Member shall provide thirty (30) calendar day notice prior to installation. ▇.▇. ▇▇ the event any Member modifications or additions result in the input to any FKEC meter to qualify as a Tier 2 or Tier 3 system, then all terms and conditions, including appropriate notice, of the Interconnection Agreement for Tier 2 or Tier 3 systems shall apply. 7.4. The Interconnection Agreement which applies in instances described in Sections 7.1, 7.2, and 7.3 above shall be determined by the combined gross power rating of the generation system(s) which is connected to the FKEC meter. In all instances described in this Section 7, the Member shall submit a new application to FKEC and shall enter into a new Interconnection Agreement. In no event shall the maximum output of the Member-owned generation system(s), which is connected to the FKEC meter exceed 2 ▇▇ ▇▇▇▇▇ Power Rating.
Modifications/Additions to Member-Owned Renewable Generation. 7.1. If the Member-owned renewable generation is subsequently modified in order to increase its Gross power rating, the Member must notify FKEC by submitting a new application specifying the modification at least thirty (30) calendar days prior to making the modification. In all instances described in this Section 7, the Member shall submit a new application to FKEC and shall enter into a new Interconnection Agreement. In no event shall the maximum output of the Member-owned generation system(s) which is connected to the FKEC meter exceed 1 MW.
Modifications/Additions to Member-Owned Renewable Generation. 7.1. If the Member-owned renewable generation system is subsequently modified in order to increase its Gross power rating, the Member must notify FKEC by submitting a new application specifying the modification at least thirty (30) calendar days prior to making the modification. 7.2. If the Member adds another Member-owned renewable generator system which i.) utilizes the same utility inter-active inverter, or other device certified pursuant to Section 3.1 above, for both systems; or ii.) utilizes a separate utility inter-active inverter, or other device certified pursuant to Section 3.1 above, for each system the Member shall provide thirty (30) calendar days notice prior to installation. 7.3. The Interconnection Agreement which applies in instances described in Sections 7.1 and 7.2 above shall be determined by the combined gross power rating of the generation system(s) which is connected to the FKEC meter. In all instances described in this Section 7, the Member shall submit a new application to FKEC and shall enter into a new Interconnection Agreement.

Related to Modifications/Additions to Member-Owned Renewable Generation

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.

  • RIGHT OF ALLOTTEE TO USE COMMON AREAS AND FACILITIES SUBJECT TO PAYMENT OF TOTAL MAINTENANCE CHARGES The Allottee hereby agrees to purchase the [Apartment/Plot] on the specific understanding that is/her right to the use of Common Areas shall be subject to timely payment of total maintenance charges, as determined and thereafter billed by the maintenance agency appointed or the association of allottees (or the maintenance agency appointed by it) and performance by the Allottee of all his/her obligations in respect of the terms and conditions specified by the maintenance agency or the association of allottees from time to time.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Post-Commercial Operation Date Testing and Modifications Developer and Connecting Transmission Owner shall each at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice and Applicable Reliability Standards as may be necessary to ensure the continued interconnection of the Large Generating Facility with the New York State Transmission System in a safe and reliable manner. Developer and Connecting Transmission Owner shall each have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.