Project Overview With ever growing size of cities, ensuring high levels of physical security without significantly increasing the number of security personnel or budget seems to be a daunting task. A heightened sense of security and ever increasing challenges require new tactics with more access to integrated system and centralized information. This necessitates the need of designing and implementing Command and Control centers for critical infrastructure across different cities. A command and control center (CCC) in City Surveillance and Incident Response Project refers to a secure building in a government that operates as the surveillance monitoring center, coordination office and alarm monitoring center all in one. The CCC includes Video Surveillance room, Dial 100 Control room, Forensic Investigation Room, ITMS room and Data center & FMS/NOC Room. The CCC is the “nerve center” - a central administrative location from where overall assets and activities are monitored and managed. The command and control centers would be operated by State Police department. City Surveillance system would involve installation of high definition fixed and PTZ IP cameras, capable of providing optical zoom, to obtain quality video stream day in and day out for the Command & Control Center. A diversified IP based network infrastructure backbone would be deployed involving high speed fibre optics/ wireless technologies to carry video from cameras to the command and control center. The CCC would be equipped with huge video walls, workstations, video management servers and video data storage clusters of several hundred terabytes. The Command and Control Center would integrate with various security systems and sensors and enable the operators to carry out the coordinated response plans effectively. The Command & Control solution would allow the Video Surveillance Room operator/ Dial 100 operator to monitor the cameras, collect inputs, dissect information and make actionable recommendations. The system would provide configurable rules Collaborative Change Management monitoring-Feeds from various public and Capacity Building places where systems which include are already installed training of police like malls, personnel on various community centers, software's like airport and railway VMS,CCC,Dial station etc. 100,Forensic etc. Edge Equipments Network Connectivity (Cameras, Sensors, (Optical Fibre, Radio Panic Button, ITMS Communication, PRI etc.) Line, Switch etc.) with tailored alerts, dashboard visualizations, intelligent role based work flow, response tools and situation collaboration. Surveillance and Incident response project This RFP intends to select System Integrator’s who will be responsible for supply, installation, commissioning of procured items under this rate contract and FMS of Edge Equipments/items procured under this rate contract, existing items available in Abhay Command Center in 26 districts and items to be procured till project completion for this project in different cities of Rajasthan. Rate Contract for Supply, Installation, commissioning and FMS of Edge equipment’s under Surveillance and Incident Response Project in the State of Rajasthan (After Pre-bid)
Ongoing Operations From the Effective Date through Closing:
Development of the Project 4.1 TSP's obligations in development of the Project: a. for procuring and maintaining in full force and effect all Consents, Clearances and Permits, required in accordance with Law for development of the Project; b. for financing, constructing, owning and commissioning each of the Element of the Project for the scope of work set out in Schedule 1 of this Agreement in accordance with: i. the Electricity Act and the Rules made thereof; ii. the Grid Code; iii. the CEA Regulations applicable, and as amended from time to time, for Transmission Lines and sub-stations: • the Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007; • Central Electricity Authority (Technical Standards for construction of Electrical Plants and Electric Lines) Regulation, 2010; • Central Electricity Authority (Grid Standard) Regulations, 2010; • Central Electricity Authority (Safety requirements for construction, operation and maintenance of Electrical Plants and Electrical Lines) Regulation, 2011; • Central Electricity Authority (Measures relating to Safety and Electricity Supply) Regulation, 2010; • Central Electricity Authority (Technical Standards for Communication System in Power System Operation) Regulations, 2020. iv. Safety/ security Guidelines laid down by the Government; v. Prudent Utility Practices, relevant Indian Standards and the Law; not later than the Scheduled COD as per Schedule 2 of this Agreement; c. for entering into a Connection Agreement with the concerned parties in accordance with the Grid Code. d. for owning the Project throughout the term of this Agreement free and clear of any encumbrances except those expressly permitted under Article 15 of this Agreement; e. to co-ordinate and liaise with concerned agencies and provide on a timely basis relevant information with regard to the specifications of the Project that may be required for interconnecting the Project with the Interconnection Facilities; f. for providing all assistance to the Arbitrators as they may require for the performance of their duties and responsibilities; g. to provide to the Nodal Agency and CEA, on a monthly basis, progress reports with regard to the Project and its execution (in accordance with prescribed form) to enable the CEA to monitor and co-ordinate the development of the Project matching with the Interconnection Facilities; h. to comply with Ministry of Power order no. 25-11/6/2018 – PG dated 02.07.2020 as well as other Guidelines issued by Govt. of India pertaining to this; i. to procure the products associated with the Transmission System as per provisions of Public Procurement (Preference to Make in India) orders issued by Ministry of Power vide orders No. 11/5/2018 - Coord. dated 28.07.2020 for transmission sector, as amended from time to time read with Department for Promotion of Industry and Internal Trade (DPIIT) orders in this regard (Procuring Entity as defined in above orders shall deemed to have included Selected Bidder and/ or TSP). Also, to comply with Department of Expenditure, Ministry of Finance vide Order (Public Procurement No 1) bearing File No. 6/18/2019- PPD dated 23.07.2020, Order (Public Procurement No 2) bearing File No. 6/18/2019-PPD dated 23.07.2020 and Order (Public Procurement No. 3) bearing File No. 6/18/2019-PPD, dated 24.07.2020, as amended from time to time, regarding public procurement from a bidder of a country, which shares land border with India; j. to submit to Nodal Agency information in the prescribed format [To be devised by Nodal Agency] for ensuring compliance to Article 4.1 i) above. k. to comply with all its obligations undertaken in this Agreement. 4.2 Roles of the Nodal Agency in implementation of the Project: 4.2.1 Subject to the terms and conditions of this Agreement, the Nodal Agency shall be the holder and administrator of this Agreement and shall inter alia: a. appoint an Independent Engineer within 90 days of the Effective Date b. provide letters of recommendation to the concerned Indian Governmental Instrumentality, as may be requested by the TSP from time to time, for obtaining the Consents, Clearances and Permits required for the Project; c. coordinate among TSP and upstream/downstream entities in respect of Interconnection Facilities; and d. monitor the implementation of the Agreement and take appropriate action for breach thereof including revocation of guarantees, cancellation of Agreement, blacklisting etc e. provide all assistance to the Arbitrators as required for the performance of their duties and responsibilities; and f. perform any other responsibility (ies) as specified in this Agreement.
Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.
Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.