Operations Administration & Management Equipment Types Clause Samples

The 'Operations Administration & Management Equipment Types' clause defines the specific categories or types of equipment that are permitted or required for use in the administration and management of operations under the agreement. This clause typically lists or references the approved equipment, such as servers, monitoring devices, or network management tools, and may set standards or requirements for their use and maintenance. By clearly specifying which equipment types are acceptable, the clause ensures operational consistency, facilitates compliance with technical standards, and helps prevent disputes over equipment suitability or compatibility.
Operations Administration & Management Equipment Types. The following table is representative of the types of equipment and related software that the contractor shall be capable of providing for the Operations, Administration & Management solution type. The requirements are stated functionally. Where a type is a software program, the functional specification is meant to include the software and the hardware platform. When responding to orders that are largely of the Operations Administration & Management equipment type, the contractor is free to use equipment from any other solution type. All-in-One Management Fault, configuration, performance, security Serves at least 2,000 appliances and most core management functions Application Discovery Configuration Hardware and software to inventory all items connected to customer’s network (excluding common carrier); loads data into monitoring tool; maintains Configuration File Consolidated Event Management Performance Collects event streams from a variety of devices and presents a single, consistent view of the current state of all managed systems Fault Monitoring Fault Hardware and software associated with identifying fault conditions, isolating sources of faults, and performing root-cause analysis; accepts a variety of inputs including SNMP Service Monitoring Performance Hardware and software to track SLAs Service Desk with Workflow Database Fault Hardware and software to record trouble reports and issue trouble tickets; includes Artificial Intelligence (AI) interface for common trouble solutions for tier 1 agents Security Support Security Hardware and software associated with risk analyses, vulnerability analyses, and analyses of physical and software security operations, both active and passive Telecom Expense Management Accounting Simplifies invoice-to-payment process by validating charges, handling dispute management, creating reports, and analyzing bills to reduce costs
Operations Administration & Management Equipment Types. ‌ Type ISO Functional Area Descriptions

Related to Operations Administration & Management Equipment Types

  • STATEWIDE CONTRACT MANAGEMENT SYSTEM If the maximum amount payable to Contractor under this Contract is $100,000 or greater, either on the Effective Date or at any time thereafter, this section shall apply. Contractor agrees to be governed by and comply with the provisions of §§▇▇-▇▇▇-▇▇▇, ▇▇-▇▇▇-▇▇▇, ▇▇-▇▇▇-▇▇▇, and ▇▇- ▇▇▇-▇▇▇, C.R.S. regarding the monitoring of vendor performance and the reporting of contract information in the State’s contract management system (“Contract Management System” or “CMS”). Contractor’s performance shall be subject to evaluation and review in accordance with the terms and conditions of this Contract, Colorado statutes governing CMS, and State Fiscal Rules and State Controller policies.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Administration Services When a medical prescription drug is administered by infusion, the administration of the prescription drug may be covered separately from the prescription drug. See Infusion Therapy - Administration Services in the Summary of Medical Benefits for benefit limits and the amount you pay. Prescription drugs that are self-administered are not covered as a medical benefit but may be covered as a pharmacy benefit. Please see Pharmacy Prescription Drugs and Diabetic Equipment or Supplies – Pharmacy Benefits section above for additional information. For some medical prescription drugs, after the first administration, coverage may be limited to certain locations (for example, a designated outpatient or ambulatory service facility, physician’s office, or your home), provided the location is appropriate based on your medical status. For a list of medical prescription drugs that are subject to this Site of Care Program, visit our website. Preauthorization may be required to determine medical necessity as well as appropriate site of care. If we deny your request for preauthorization, or you disagree with our determination for the appropriate site of care, you can submit a medical appeal. See Appeals in Section 5 for information on how to file a medical appeal.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Construction Management Services a. A-E may be required to review and recommend approval of submittals, shop drawings, Request for Information (RFI) and/or calculations for temporary structures such as trench shoring, false work and other temporary structural forms. b. A-E may be required to review and advise the County Representative on the overall project schedule, including staging and completion dates, duration, milestones, and interfaces. Immediately notify Representative if the proposed work schedule does not conform to the contract documents, including the plans, specifications, and permits or that may require special inspection or testing, or work stoppage. c. Review on a monthly basis the project schedule and/or Critical Path Method (CPM) schedule submitted by the Construction Contractor. Make recommendations concerning the Construction Contractor’s adherence thereto. Recommend possible solutions to scheduling problems so as to complete the project on time, within budget, and in accordance with the contract drawings and specifications. d. Review scope of work and identify potential contract change orders. Prepare independent cost estimates for any changes resulting from design revisions or change in field conditions. Prepare and recommend for approval all contract change orders. e. Evaluate the merit of any potential claims or requests for equitable adjustment submitted by the Construction Contractor. Prepare analysis of potential claims include recommendations regarding settlement of the claims. f. Assist County staff in project related issues with other Agencies, or departments, engineering and material testing support firms, CEQA consultants, utilities agencies, etc. g. Assist in community outreach meetings and media relations h. Review for acceptance/approval of Storm Water Pollution Prevention Plan (SWPPP) in accordance with the general Permit of Discharges of Storm Water Associated with Construction Activity (Construction General Permit, including dewatering/diversion plans per the State’s DeMinimus Permit).