Program Verification Phase Sample Clauses

Program Verification Phase. .1 Designer shall review the program and other information furnished by Owner, and shall review laws, codes and regulations applicable to Designer’s services. Designer shall meet with Owner to ascertain the general requirements for the Project. If required by the Project, Designer shall verify the functional and departmental objectives of the Project, to advise, with respect to time and budget, the following: selection of the site; the relationship of the Project to other structures and facilities; and scope and functional aspects of the program. .2 The Design Team shall visit the Project site and become familiar with the existing site conditions in order to correlate these findings with Owner’s program. .3 Designer shall prepare an initial evaluation of all elements of Owner’s program, budget, Project site, and the proposed procurement or delivery method and other initial information, each in terms of the other, to ascertain the requirements of the Project. Designer shall notify Owner of any inconsistencies discovered in the information. .4 Designer shall present its initial evaluation of the program to Owner and shall, if necessary, discuss with Owner approaches to design and construction of the Project. Designer and Owner shall agree on the budget and requirements of the Project. .5 Designer shall show the progress to date, confirm the remainder of the Phase durations, and obtain written approval of the Program Verification Phase and to proceed with the Schematic Design Phase.
Program Verification Phase. 1. Project administrative services related to administrative functions undertaken by the ARCHITECT/ENGINEER to provide services during this phase of the Project. It will include initial consultation in project development and project-related research, conferences, correspondence, travel, progress reports, etc. The ARCHITECT/ENGINEER is required to validate with the OWNER, and revise as requested by the OWNER the OWNER’s Program Statement for the project dated and approved by the University of Nebraska Board of Regents on and incorporated herein by this reference. 2. Existing facilities condition surveys are required for areas to be remodeled. Existing facilities occupancy surveys are not required. The OWNER will furnish the ARCHITECT/ENGINEER floor space record documents of existing buildings that include room numbers, net assignable square feet (NASF) per room and NASF and gross square feet (GSF) per floor per building. The ARCHITECT/ENGINEER will obtain from the OWNER’S Representative an inventory of rooms assigned by department. The ARCHITECT/ENGINEER will verify and document the functional departments occupancy on floor plans of existing facilities described as blocks of space with schedules of room names, room NASF and departmental NASF to be vacated from existing facilities and relocated to the PROJECT or backfill space. 3. Facility program validation services including verifying and modifying a detailed set of requirements for the Project including design objectives, limitations and criteria. This will include determination of: quantity, quality, size, architectural and utility requirements of each type of space; functional interrelationships among spaces; requirements for flexibility and expandability; and needs relative to equipment and systems. 4. Space schematic/flow diagram services related to developing diagrammatic studies and pertinent text relative to: internal functions; human, vehicle and material flow patterns; and general space allocations. These will be developed in collaboration with the OWNER'S REPRESENTATIVE and will include an analysis of operating functions and studies of adjacency, circulation and traffic patterns. The studies will relate to: numbers of personnel; special facilities systems, and equipment requirements; materials handling; flexibility and expandability. 5. Site analysis and assisting the OWNER in evaluating the Project site; Site analysis will include a detailed study of topographic and subsurface conditions, util...
Program Verification Phase. ☒ .1 Project administrative services related to administrative functions undertaken by the Architect /Engineer to provide services during this phase of the Project. It will include initial consultation in project development and project-related research, conferences, correspondence, travel, progress reports, etc. The Architect/Engineer is required to validate with the Owner and revise as requested by the Owner the Owner’s Program Statement for the project dated <<Date>> and approved by the University of Nebraska Board of Regents on <<Approval Date>> and incorporated herein by this reference.

Related to Program Verification Phase

  • E-VERIFICATION The Vendor represents and warrants that it will ensure its compliance with the Mississippi Employment Protection Act of 2008, and will register and participate in the status verification system for all newly hired employees. Mississippi Code Annotated §§71-11-1 et seq. The term “employee” as used herein means any person that is hired to perform work within the State of Mississippi. As used herein, “status verification system” means the Illegal Immigration Reform and Immigration Responsibility Act of 1996 that is operated by the United States Department of Homeland Security, also known as the E-Verify Program, or any other successor electronic verification system replacing the E-Verify Program. Vendor agrees to maintain records of such compliance. Upon request of the State and after approval of the Social Security Administration or Department of Homeland Security when required, Vendor agrees to provide a copy of each such verification. Vendor further represents and warrants that any person assigned to perform services hereafter meets the employment eligibility requirements of all immigration laws. The breach of this agreement may subject Vendor to the following: termination of this contract for goods or services and ineligibility for any state or public contract in Mississippi for up to three (3) years with notice of such cancellation/termination being made public; the loss of any license, permit, certification, or other document granted to Vendor by an agency, department or governmental entity for the right to do business in Mississippi for up to one (1) year; or,

  • Seniority Verification Process i. The new school district shall provide the employee with the necessary verification form at the time the employee achieves continuing contract status. ii. The employee must initiate the seniority verification process and forward the necessary verification forms to the previous school district(s) within ninety (90) days of receiving a continuing appointment in the new school district. iii. The previous school district(s) shall make every reasonable effort to retrieve and verify the seniority credits which the employee seeks to port.

  • Sick Leave Verification Process a. The new school district shall provide the employee with the necessary verification form at the time the employee receives confirmation of employment in the school district. b. An employee must initiate the sick leave verification process and forward the necessary verification forms to the previous school district(s) within ninety (90) days of commencing employment with the new school district. c. The previous school district(s) shall make every reasonable effort to retrieve and verify the sick leave credits which the employee seeks to port.