Project Quality Clause Samples
The Project Quality clause establishes the standards and requirements for the quality of work and materials used in a project. It typically outlines the benchmarks or specifications that must be met, and may require regular inspections, testing, or certifications to ensure compliance. By clearly defining quality expectations, this clause helps prevent disputes over workmanship and ensures that the final deliverables meet the agreed-upon standards.
POPULAR SAMPLE Copied 1 times
Project Quality. The purpose of this section is to: (1) summarize the Quality Assurance/Quality Control activities during the previous month (reporting period), and (2) highlight any significant items identified as being deficient in quality. Deficient items noted should be accompanied by reasons and specifics concerning the deficiencies, and corrective actions taken or planned. In addition, the agency or firm responsible for the corrective action should be documented. Planned corrective actions should then be included as Action Items/Outstanding Issues.
Project Quality. The external design of the buildings must be of a high architectural quality, having an attractive, enduring aesthetic appeal and displaying attention to detail. The interior design must: • Create a vibrant, active library and community spaces for all ages and groups. • Allow for maximum flexibility and multi-use of internal floor spaces. • Allow for security and after-hours zoning of component facilities and sub-parts. • Obtain certification of a suitable sustainability rating tool such as Green Star for the Council’s Community Hub fitout and operation to a standard that is in alignment with the top 15% of similar buildings & centres in the Sydney metropolitan area at the time of design and construction. Note: To ensure the final fitout can meet Green Star certification the Developer is to provide warm shell spaces and orientation which facilitates that end certification • Minimise the vertical and horizontal path of travel between various parts of the building. • Minimise energy consumption and reduce centre utility operating costs. • Incorporate new technologies and opportunities based on industry best practice. • Have daylight access to all spaces and views to open space
Project Quality. The quality of the bulk purchasing residential apartment, which Party A provide to Party B ,should meet national related construction and quality standards.
Project Quality. The Project shall be comparable in quality to destination resort projects developed, owned and/or licensed by Disney or The ▇▇▇▇ Disney Company as of the Effective Date.
Project Quality. 15.1 The construction of the Project shall meet the quality standards as agreed in the Agreement. The quality evaluation standards shall be based on the national or industrial quality inspection and evaluation standards. If the quality of the Project fails to meet the standards as agreed due to a reason that is attributable to the Contractor, the Contractor shall assume the Default Liability.
15.2 In case of any dispute between the parties in respect of the Project quality, such dispute shall be evaluated by a project quality inspection organization as agreed by the parties. The Costs required and losses caused thereby shall be assumed by the liable party. If the parties are both liable, they shall assume the liabilities of their own respectively.
Project Quality. Section 4. Strictly comply with the geological and project design. The change of the design has to be approved by Party A. Changing the design with the consent of Party A, Party B should be entitled to all the costs incurred.
Section 5. Well quality and cementing quality should comply with the standards of Petro China Company Limited.
Section 6. Oil immersion time will comply with Petrol China Jilin Petro Group Standards.
Section 7. The actual position of the well should be within 3 meters of the designed position. If the position has to be moved, it has to be approved.
Section 8. Complete well should use 273mm*139.7mm Iron Ring to fix the well head.
1. Complete well should use 273mm*139.7mm Iron Ring to fix the well head. Meanwhile, the wellhead has to be smooth, fixed, not broken, not sink, and no oil & gas liquid comes out.
2. Put the well head cover which has the standard well No. on it, and spot welding it.
3. Case type: Case: J55 139.7X7.72; Oil Layer position P110 139.7X9.17
Project Quality. The Design‐Builder shall submit a monthly report on Project Quality by the fifteenth (15th) day of the month following the end of the month being reported. The purpose of this report is to:
(1) summarize the Quality Assurance/Quality Control activities during the previous month, and
(2) highlight any significant items identified as being deficient in quality. Deficient items noted should be accompanied by reasons and specifics concerning the deficiencies, and corrective actions taken or planned. In addition, the agency or firm responsible for the corrective action should be documented. The Project Quality reports shall be discussed at the quarterly status meetings required by Section I. d above and planned corrective actions should be included as Action Items/Outstanding Issues.
Project Quality. As consideration for the Authority’s obligation to pay the Developer the Public Improvement Contribution Amount, the Developer agrees to construct the Project to the standard of quality described in this paragraph. The Developer, the County and the Authority recognize the difficulty in defining an objective standard of quality for a retail development project. Recognizing this limitation, the Developer agrees to construct and maintain the Project (or cause the Project to be constructed and maintained) in a manner and quality (including landscaping and amenities) that is consistent with the pad development guidelines, lighting plan, elevations, landscaping plans, signage guidelines, and maintenance standards attached hereto as Exhibit “D.” Developer shall construct and maintain the Project in accordance with the Conceptual Site Plan, all County requirements for approvals and permits, and the additional provisions shown as Exhibit “D”.
Project Quality. 1. Party B shall strictly follow all kinds of relevant rules, specifications, standards and requirements for construction etc. promulgated by Ministry of Industry and Information Technology, and guarantee that the quality of this project will meet Party A’s standards.
2. All concealed works of Party B during construction shall be endorsed by Party A before concealment; otherwise Party A is entitled to ask for inspection of the concealed works at any time. All expenses arising therefrom shall be borne by Party B, and the construction period delayed thereby will not be extended accordingly.
3. In case that rework is needed due to the nonconforming quality of this project, all expenses arising therefrom shall be borne by Party B, and Party B shall still compensate Party A all losses suffered therefrom.
4. The project warranty period is 12 months as of the completion date of this project, Party B shall be responsible for repairing all quality issues occurring during such period for free, and Party B shall still compensate Party A all losses suffered therefrom.
Project Quality. The CONTRACTOR shall develop and submit a Quality Management Plan (QMP) in accordance with the specifications herein, and OWNER’s quality policy, for review and comment three