Schematic Design Approval Sample Clauses

POPULAR SAMPLE Copied 4 times
Schematic Design Approval. The Design Professional shall, on the Preliminary Design and Construction Schedule, show the progress to date, confirm the remainder of the design portion of the schedule, and update the projected construction portion of the schedule, The Design Professional shall meet with the Owner and Using Agency for the purpose of presenting and reviewing the Schematic Design including the updated schedule and the initial Statement of Probable Construction Cost. The Design Professional shall obtain the written approval of the Owner of the Schematic Design Phase before proceeding with the next phase.
Schematic Design Approval. The Professional shall meet with the Department for the purpose of presenting and reviewing the schematic design documents including an updated Project Schedule and the Statement of Probable Construction Cost. The Professional shall respond in writing to all Department comments to the satisfaction of the Department before the schematic design submission is considered approved. Once the Department approves the schematic design submission, the Professional shall not change any of the approved schematic design documents with its submission of any subsequent submission without the Department’s approval.
Schematic Design Approval. The Project Management Contractor shall use its best efforts to cause the design consultant to revise the schematic design so that it reflects the comments received from the Client Agency, the Department and to reflect any approved value engineering ideas. The Project Management Contractor shall review the revised schematic design and advise the Department whether the requested changes and value engineering changes have been incorporated. The Project Management Contractor shall not have the authority to approve the schematic design. The decision to approve or reject the revised schematic design shall be made by the DGS Project Manager. The approved schematic design is referred to herein as the “Final Schematic Design”. The Project Management Contractor shall update the Control Budget to reflect the likely cost of the Final Schematic Design.
Schematic Design Approval. As part of the Service A 10% Schematic Review Submittal, the Designer shall furnish the Owner an estimate of project cost based upon the Service A 10% Review Submittal. The approval of project cost estimate and the Service A 10% Review Submittal by the Owner and all public agencies involved will constitute authority for the Designer to proceed with the performance and completion of Service B.
Schematic Design Approval. The Design Builder shall, on the Preliminary Design and Construction Schedule, show the progress to date, confirm the remainder of the design portion of the schedule, and update the projected construction portion of the schedule, The Design Builder shall meet with the Owner, Program Manager, Using Agency and Design-Builder for the purpose of presenting and reviewing the Schematic Design including the updated schedule and the initial Statement of Probable Construction Cost. The Design Builder shall obtain the written approval of the Owner for the Schematic Design before proceeding with the next phase.
Schematic Design Approval. The Design Professional shall meet with the Owner and Using Agency for the purpose of presenting and reviewing the Schematic Design Documents and the Statement of Probable Construction Cost. To the extent the Statement of Probable Construction Cost submitted with the Schematic Design Documents significantly deviates from the GMP Cost Limitation, the Design Professional shall discuss the deviations with the Owner and prepare and submit a plan to address the differences. The Design Professional shall, on the Preliminary Design and Construction Schedule, show the progress to date, confirm the remainder of the design portion of the schedule, and update the projected construction portion of the schedule. The Design Professional shall obtain the written approval of the Owner of the Schematic Design Documents before proceeding with the next phase. Design Development Phase.

Related to Schematic Design Approval

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.