Site Background Reports Clause Samples

The Site Background Reports clause requires the preparation and provision of reports detailing the historical and current conditions of a project site. These reports typically include information on previous uses, environmental assessments, and any known hazards or contamination present on the property. By mandating such documentation, the clause ensures that all parties are informed about potential site issues, thereby reducing the risk of unforeseen complications and facilitating informed decision-making during project planning and execution.
Site Background Reports. Site Background Reports means those reports, plans, and studies respecting the Place of the Work and the conditions for the Work referred to in GC 13.4 – SITE BACKGROUND REPORTS.
Site Background Reports. 13.3.1 The Contractor acknowledges it has been provided the following Site Background Reports and has reviewed and is familiar with the Site Background Reports: .1 Slope Stability – ▇▇▇▇▇▇▇ Cut, ▇▇▇▇▇▇▇▇▇ Hospital Redevelopment, Hamilton, Ontario – Trow Associates (July 9, 2004) .2 Section 02015 Soils Report, together with the report titled “Geotechnical Investigation, ▇▇▇▇▇▇▇▇▇ Hospital Redevelopment, Hamilton, Ontario” (dated April 2004 and prepared by Trow Associates) .3 ▇▇▇▇▇▇▇▇ Health SciencesAsbestos Management Policy .4 ▇▇▇▇▇▇▇▇ Health Sciences – ▇▇▇▇▇▇▇▇▇ Site – Asbestos Management Plan – Contractors .5 Building Asbestos Survey Summary (Survey Date: Aug. 2002) .6 Appendix A – Engineering Notification to Infection Control .7 Appendix B – Infection Control Risk Assessment Process .8 Appendix C – Infection Control Pre-Construction Checklist .9 Appendix D – Infection Control Routine Checklist for Construction/Renovation Projects .10 Appendix E – Infection Control Completion of Construction/Renovation Checklist .11 Section 13280: ▇▇▇▇▇▇▇▇ Health Sciences – Asbestos Abatement Scope and Details .12 Section 13281: Asbestos Abatement – Type 1 .13 Section 13282: Asbestos Abatement – Type 2 .14 Section 13283: Asbestos Abatement – Glove Bag .15 Section 13284: Asbestos Abatement – Type 3 .16 Section 13285: Lead Paint Abatement .17 Section 13286: Other Hazardous Materials .18 Section 13287: PCB Capacitators and Ballasts .19 Pre-Demolition Survey for designated Substances, 70 Wing North & 80 Wing (February 23, 2007) .20 Pre-Demolition Survey for Designated Substances, 60 Wing and 90 Wing (June 8, 2007) .21 Site Survey – East Part: A-100A .22 Site Survey – West Part: A-100B 13.4.1 The following is a form of the Assignable Subcontract Agreement referred to in GC 3.8.4: ASSIGNABLE SUBCONTRACT AGREEMENT THIS AGREEMENT made as of the • day of • , 200• , between • (hereinafter called “Contractor”) - and - (hereinafter called the “Subcontractor”) - and - • (hereinafter called the “Owner”)
Site Background Reports. 13.4.1 The Contractor acknowledges it has been provided the following Site Background Reports and has reviewed and is familiar with the Site Background Reports: .1 “Geotechnical Investigation Proposed Additions - Trillium Health Centre - ▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇ - ▇▇▇▇▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇”, prepared by Trow Consulting Engineers Ltd., July 2, 2001. .2 Foundation survey prepared by ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ Ontario Limited and dated August 18, 19, 2004.
Site Background Reports. 13.4.1 The Contractor acknowledges it has been provided the following Site Background Reports and has reviewed and is familiar with the Site Background Reports:
Site Background Reports. 13.4.1 The Contractor acknowledges it has been provided the following Site Background Reports and has reviewed and is familiar with the Site Background Reports: .1 Geo-technical Investigation & Site Assessment Report prepared by Trow Associates Inc., dated August 7, 1998 .2 Geo-technical Investigation Confirmation of Rock Profile at New Column Location prepared by Trow Associates Inc., dated February 22, 2006 .3 Designated Substance Report prepared by Pinchin, dated June 29, 1999
Site Background Reports. 13.4.1 The Contractor acknowledges it has been provided the following Site Background Reports and has reviewed and is familiar with the Site Background Reports: .1 Type 1 Asbestos Abatement Specification, SJHC Ambulatory Care Centre Renovations – ▇▇▇▇▇ ▇, ▇▇. ▇▇▇▇▇▇’s Health Care London, SJHC Project No. 00012, dated June 1, 2006, by ▇. ▇▇▇▇▇▇ Environmental Management Inc.

Related to Site Background Reports

  • Inspections and Reports 2.1 The department may inspect, in the manner and at reasonable times it considers appropriate, all the contractor's facilities and activities under this contract. 2.2 The contractor shall make progress and other reports in the manner and at the times the department reasonably requires.

  • Environmental Audits and Reports As soon as practicable following receipt thereof, copies of all material environmental audits, investigations, analyses and reports of any kind or character, whether prepared by personnel of Company or any of its Subsidiaries or by independent consultants, Government Authorities or any other Persons, with respect to significant environmental matters at any Facility that, individually or in the aggregate, could reasonably be expected to result in a Material Adverse Effect or with respect to any Environmental Claims that, individually or in the aggregate, could reasonably be expected to result in a Material Adverse Effect;

  • Research Reports Distributor acknowledges that Dealer may prepare research reports relating to the Fund that are not to be used for marketing purposes (“Research Reports”). Distributor hereby authorizes Dealer to use the name of the Fund, Distributor and BREDS in Research Reports.

  • Required Reports (1) As required in Attachment H, Disadvantaged Business Enterprise or Historically Underutilized Business Program Requirements, the Engineer shall submit Progress Assessment Reports to report actual payments made to Disadvantaged Business Enterprises or Historically Underutilized Businesses. One copy shall be submitted with each billing statement and one copy shall be submitted to the address included in Attachment H, Disadvantaged Business Enterprise or Historically Underutilized Business Program Requirements. (2) Prior to contract closeout, the Engineer shall submit a Final Report (Exhibit H-4) to the address set forth in Attachment H. (3) The Engineer shall submit a separate report with each billing statement showing the percent completion of the work accomplished during the billing period and the percent completion to date, and any additional written report requested by the State to document the progress of the work.

  • Environmental Compliance and Reports Borrower shall comply in all respects with any and all Environmental Laws; not cause or permit to exist, as a result of an intentional or unintentional action or omission on Borrower’s part or on the part of any third party, on property owned and/or occupied by Borrower, any environmental activity where damage may result to the environment, unless such environmental activity is pursuant to and in compliance with the conditions of a permit issued by the appropriate federal, state or local governmental authorities; shall furnish to Lender promptly and in any event within thirty (30) days after receipt thereof a copy of any notice, summons, lien, citation, directive, letter or other communication from any governmental agency or instrumentality concerning any intentional or unintentional action or omission on Borrower’s part in connection with any environmental activity whether or not there is damage to the environment and/or other natural resources. Additional Assurances. Make, execute and deliver to Lender such promissory notes, mortgages, deeds of trust, security agreements, assignments, financing statements, instruments, documents and other agreements as Lender or its attorneys may reasonably request to evidence and secure the Loans and to perfect all Security Interests.