Spare Parts Monitoring Sample Clauses

Spare Parts Monitoring. The Borrower shall, not later than November 30, 1991, introduce a monitoring system, satisfactory to the Bank, designed to assist the Borrower in ensuring the availability as and when needed of spare parts for traction and rolling stock in adequate quantities. Annex to Schedule 6 Operational Targets 1990 1991 1992 1993 Number of staff at year-end 32,566 31,915 31,277 30,652 Productivity of labor (traffic 339 348 361 375 units (thousand)/employee) Number of freight stations to be closed (cumulative) 41 61 61 61 Availability of electric 88 89 90 90 Availability of diesel locomotives (%) 78 79 81 83 Availability of electric motor trains (%) 82 83 83 83 Availability of diesel motor trains (%) 83 83 83 83 Availability of passenger coaches (%) 83 84 84 85 Availability of freight wagons (%) 95 95 95 95 US$ Million (December 1988 dollars) Procurement of Vehicles 0.74 - 0.74 Sub-Total COMPLETION OF 81-85 PLAN 0.74 - 0.74 Price Contingencies 0.03 - 0.03 Sub-Total INCLUDING CONTINGENCIES 0.77 - 0.77 B. SEVENTH BANK LOAN Track Overhaul 13.02 13.12 26.14 SS & TT Equipment Heavy Mechanication for Line Overhaul & Maintenance 6.95 5.93 3.57 5.17 10.52 11.10 Sub-Total SEVENTH BANK LOAN 25.90 21.86 47.76 Price Contingencies 1.18 1.80 2.98 Sub-Total INCLUDING CONTINGENCIES 27.08 23.66 50.74 C. EIB LOANS Track Overhaul 6.85 - 6.85 Zagreb Western Bypass 6.62 15.37 21.99 Information System 7.48 4.12 11.60 Technical Passenger Station 2.11 10.88 12.99 Sub-Total EIB LOANS 23.06 30.37 53.43 Price Contingencies 1.05 2.50 3.55 Sub-Total INCLUDING CONTINGENCIES 24.11 32.87 56.98 Total 1990 1991 1990-91 D. INFRASTRUCTURE US$ Million (December 1988 dolla Electrification 4.03 35.15 39.18 SS & TT Equipment 5.30 5.03 10.33 Track Overhaul 13.42 1.27 14.69 Reconstruction of Stations 4.80 4.49 9.29 Sub-Total INFRASTRUCTURE 27.55 45.94 73.49 Price Contingencies 1.25 3.78 5.03 Sub-Total INCLUDING CONTINGENCIES 28.80 49.72 78.52 A. COMPLETION OF 1981-85 PLAN E. ROLLING STOCK Passenger Coaches 5.38 3.00 8.38 Freight Wagons 5.22 2.90 8.12 Other 11.54 3.29 14.83 Sub-Total ROLLING STOCK 22.14 9.19 31.33 Price Contingencies 1.01 0.76 1.76 Sub-Total INCLUDING CONTINGENCIES 23.15 9.95 33.09 1990 1991 1990-91 US$ Million (December 1988 dollars)
Spare Parts Monitoring. The Borrower shall, not later than November 30, 1991, introduce a monitoring system, satisfactory to the Bank, designed to assist the Borrower in ensuring the availability as and when needed of spare parts for traction and rolling stock in adequate quantities. Annex to Schedule 6 Operational Targets 1990 1991 1992 1993 Number of staff at year-end 13,280 12,966 12,658 12,358 Productivity of labor (traffic units (thousand)/employee) 278 286 300 314 Number of freight stations be closed (cumulative) to 2 6 12 20 Availability of electric locomotives (%) 82 82 83 83 Availability of diesel locomotives (%) 71 72 73 75 Availability of electric motor trains (%) 71 72 73 75 Availability of diesel motor trains (%) - - 90 90 Availability of passenger coaches (%) 82 82 83 83 Availability of freight wagons (%) 92 93 93 93 Railway Investment Plan Total 1990 1991 1990-91 US$ Million (December 1988 dollars) A. COMPLETION OF 1981-85 PLAN Track Overhaul 6.50 1.91 8.41 Sub-Total 6.50 1.91 8.41 Price Contingencies 0.30 0.16 0.46 Sub-Total INCLUDING CONTINGENCIES 6.80 2.07 8.87

Related to Spare Parts Monitoring

  • Spare Parts 52.1 The Supplier may be required to provide any or all of the following materials, notifications, and information pertaining to spare parts manufactured or distributed by the Supplier. (a) Such spare parts as the Purchaser may choose to purchase from the Supplier, provided that this election will not relieve the supplier of any warranty obligations under the contract; and (b) In the event of termination of production of the spare parts: (c) Advance notification to the Purchaser of the impending termination. (d) Time to permit the Purchase to procure needed requirement; and following such termination, furnishing at no cost to the Purchaser, the blueprints, drawings, and specifications of the spare parts, if requested.

  • Program Monitoring The Contractor will make all records and documents required under this Agreement as outlined here, in OEC Policies and NHECC Policies available to the SRO or its designee, the SR Fiscal Officer or their designee and the OEC. Scheduled monitoring visits will take place twice a year. The SRO and OEC reserve the right to make unannounced visits.

  • Contract Monitoring The criminal background checks required by this rule shall be national in scope, and must be conducted at least once every three (3) years. Contractor shall make the criminal background checks required by Paragraph IV.G.1 available for inspection and copying by DRS personnel upon request of DRS.

  • Accessories, Spare Parts and Tools Accessories, spare parts and tools dispatched with a piece of equipment, machine, apparatus or vehicle, which are part of the normal equipment and included in the price thereof or which are not separately invoiced, shall be regarded as one with the piece of equipment, machine, apparatus or vehicle in question.

  • Spares The Contractor shall ensure that the Contractor’s operational base at the Site is at all times stocked with spare parts for the Contractor's Equipment that meet the requirements of the Contract, together with all necessary or desirable packing and marking for that purpose and that such spare parts are sufficient to ensure that the Work /services can continue in the event of failure of the Contractor’s Equipment.