Submit for Approval Sample Clauses

Submit for Approval. The Architect shall submit the preliminary design documents for the approval of the Owner, DCM, and SDE.
Submit for Approval. The Architect shall submit the schematic design documents for the approval of the Owner, DCM, and SDE. The schematic design documents approved by the Owner shall constitute the Approved Project Program which can then be revised only by written agreement of the Architect and Owner.
Submit for Approval. After the Final Preliminary Design Review Meeting and the incorporation of the Review Comments into the Final Preliminary Drawings and Specifications, and development of Final Estimate of the Cost of the Work prepared by the Owner’s consultant, and updated Architect’s project schedule, The Architect shall submit the preliminary design documents for the approval of the Owner, ABC
Submit for Approval. The Architect shall submit the final Drawings and Specifications for the approval of the Owner and ACCS FACILITIES DIVISION. Bid Over-runs. If the lowest responsible and responsive bid received by the Owner for the Work is greater than the budgeted Cost of the Work, the Architect will, upon instructions from the Owner, make revisions to the Drawings and Specifications, consistent with the Approved Project Program, as may be necessary to re-bid the Work within the budgeted Cost of the Work, or a higher amount as may be authorized by the Owner. The Owner will cooperate with the Architect in revising the scope and quality of the Work as necessary to reduce the Cost of the Work. Compensation for such revision of the Drawings and Specifications shall be determined as follows: If the bid over-run is not greater than 10% of the budgeted Cost of the Work, the Architect will be compensated under Article 5, or as otherwise agreed, for revising the Drawings and Specifications. If the bid over-run is greater than 10% of the budgeted Cost of the Work and (i) the Owner has received bids for the Work within 90 days after final approval of the Drawings and Specifications and (ii) the reason that the over-run exceeds 10% of the budgeted Cost of the Work is not attributable to a unique or unexpected market condition which the Architect would not have reasonably contemplated in its estimates, the Architect will revise the Drawings and Specifications to conform to the budgeted Cost of the Work, or a higher amount authorized by the Owner, at no cost to the Owner.

Related to Submit for Approval

  • Application for approval 3.1. The application for approval of a vehicle type with regard to the AEBS shall be submitted by the vehicle manufacturer or by his authorised representative. 3.2. It shall be accompanied by the documents mentioned below in triplicate: 3.2.1. A description of the vehicle type with regard to the items mentioned in paragraph 2.4., together with a documentation package which gives access to the basic design of the AEBS and the means by which it is linked to other vehicle systems or by which it directly controls output variables. The numbers and/or symbols identifying the vehicle type shall be specified. 3.3. A vehicle representative of the vehicle type to be approved shall be submitted to the Technical Service conducting the approval tests.

  • Requests for Approval If the Administrative Agent requests in writing the consent or approval of a Lender, such Lender shall respond and either approve or disapprove definitively in writing to the Administrative Agent within ten Business Days (or sooner if such notice specifies a shorter period for responses based on Administrative Agent’s good faith determination that circumstances exist warranting its request for an earlier response) after such written request from the Administrative Agent. If the Lender does not so respond, that Lender shall be deemed to have approved the request.

  • Director Approval The Board of Directors of Holdings shall have approved this Agreement and the transactions contemplated herein.

  • Prior Approval The Engineer shall not assign, subcontract or transfer any portion of professional services related to the work under this contract without prior written approval from the State.

  • HSR Approval All applicable waiting periods (and any extensions thereof) under the HSR Act in respect of the Transactions shall have expired or been terminated.