A Submittal Log clause requires the contractor or responsible party to maintain a detailed record of all documents, samples, and other items submitted for review or approval during a project. This log typically includes information such as submission dates, descriptions, status updates, and responses from the reviewing authority. By organizing and tracking these submissions, the clause ensures transparency, helps prevent delays, and provides a clear reference for both parties to monitor compliance and progress throughout the project.
Submittal Log. The Professional shall prepare and submit in a format and on forms approved by the Department as part of the final document submission a listing of all construction submittals identified in the Contract Documents, including but not limited to shop drawings, material data, samples, and product data. This log must include all items that the Professional is required to review to verify that the correct products and equipment will be provided by the construction contractors.
Submittal Log maintain accurate submittal log for duration of Contract. Indicate current status of all submittals at all times. Make submittal log available for the Project Manager's review upon request.
Submittal Log. Engineer will log-in, track, and distribute submittals to the various disciplines and subconsultants. Deliverables: None
Submittal Log. ENGINEER will log-in, track, and distribute submittals to the various disciplines and subconsultants.
Submittal Log. A Submittal log will be prepared at the start of the project to track correspondence from LHTAC to the CONSULTANT team. This log will be updated for each shop drawing and contractor submittal, and requests for information to track submittal and approval dates and review times. The Submittal Log will include the bid item number, the contractor submittal number, CONSULTANT submittal number, submittal description, date received, who the submittal was assigned to, date the submittal was responded to, and notes for the submittal. The Submittal Log will be provided upon request to LHTAC.
Submittal Log. ▇▇▇▇ commercial items.
Submittal Log. Subcontractor shall submit to Contractor a Submittal Log, within ten (10) days of Subcontractor’s execution of the Agreement, for approval, showing submittals Subcontractor will provide and the date those will be provided to Contractor.
Submittal Log. Keep detailed log of all submitted shop drawings, product data, and samples, along with their approval status.
Submittal Log. Within one (1) week after notification of award of contract, Subcontractor shall provide a complete list of all items it is required to submit, including closeouts documentation. Subcontractor shall ensure the submittal submission dates allow for timely review, procurement and delivery of construction materials in accordance with Project Schedule and any other dates specified in the Subcontract Documents.
Submittal Log. Design Builder will keep a Submittal log containing a record of all Submittals, the date submitted, the date returned to the Design Builder and Subcontractor and whether the Submittal was approved or requires resubmission. Design Builder will keep a jobsite copy of all Submittals and all Submittals, as well as the Submittal log, will be posted electronically on a web portal established for the Project.