Substantial Completion Testing Sample Clauses

Substantial Completion Testing. The initial Performance Testing is used to satisfy the Minimum Performance Guarantee. This Test shall be satisfied by the same methods as the Unit 6 Performance Test methodology, except where a substitute test method is approved by the Owner. A substitute test using installed plant permanent instrumentation in lieu of calibrated temporary test instrumentation may be approved after Owner review. The pricing defined in Exhibit I is based on the Contractor using plant permanent instrumentation for the initial Performance Testing to satisfy the Minimum Performance Guarantee. Additional temporary high accuracy instrumentation will be used by Contractor for purposes of verifying compliance with the Guaranteed Performance. The initial Performance Test may satisfy the requirement of the Performance Guarantees if preformed in accordance with Section 6. of this Exhibit.
Substantial Completion Testing. The purpose of Substantial Completion Testing is to confirm the operational capability in accordance with the Specifications of the System in a "real world" environment. The test plan will clearly identify tests to be run, procedures to monitor and measure system performance, equipment necessary to undertake tests, and expected results and roles and responsibilities. The test will simulate real world environmental conditions to the extent possible, including, performance under load, reasonable interference, and other environmental conditions. To accomplish this, Sprint will provision at least eight customers (or test sites) per sector in each System. All users in MDS-1 sectors shall broadcast on a common RF channel and all users in MDS-2 sectors shall broadcast on a common RF channel. Test will be performed for various upstream channel widths. The tests must test for all minimums, maximums and operational. All test results must be valid and based on objective criteria. These tests will include, but will not be limited to, the following types of tests:

Related to Substantial Completion Testing

  • Substantial Completion 9.8.1 When the Contractor considers that the Work, or a designated portion thereof which has been accepted in writing to by the State, is substantially complete as defined in Subparagraph

  • Substantial Completion Date Substantial Completion of the Work as defined in Article 6.1.2 of the General Conditions to the Continuing Contract for Construction Management shall be achieved by July 31, 2022.

  • Upon Substantial Completion of the Work or designated portion thereof and upon application by the Contractor and certification by the Architect, the State shall make payment, reflecting adjustment in retainage, if any, for such Work or portion thereof, as provided in the Contract Documents.

  • Final Completion The full and final completion of all Work in accordance with the Contract Documents.

  • Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.