Synchronisation Points Clause Samples

Synchronisation Points. 162 A synchronisation point is a point of time in the programme at which the T2S Programme is to 163 reach a specific objective. The purpose of a synchronisation point is to monitor at foreseen time 164 intervals that the progress of all parties to this Agreement is in line with the programme plan. 165 The Eurosystem provides the list of synchronisation points, which includes the list of the 166 deliverables and milestones that require delivery or completion by the Eurosystem, Contracting 167 CSDs and Contracting CBs in order to have successfully achieved the synchronisation point.

Related to Synchronisation Points

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Synchronization The Licensor hereby grants limited synchronization rights for One (1) music video streamed online (Youtube, Vimeo, etc..) for up to 500,000 non-monetized video streams on all total sites. A separate synchronisation license will need to be purchased for distribution of video to Television, Film or Video game.

  • PERFORMANCE MANAGEMENT SYSTEM 5.1 The Employee agrees to participate in the performance management system that the Employer adopted for the employees of the Employer; 5.2 The Employee accepts that the purpose of the performance management system will be to provide a comprehensive system with specific performance standards to assist the employees and service providers to perform to the standards required; 5.3 The Employer must consult the Employee about the specific performance standards and targets that will be included in the performance management system applicable to the Employee; 5.4 The Employee undertakes to actively focus on the promotion and implementation of the key performance indicators (including special projects relevant to the employee’s responsibilities) within the local government framework; 5.5 The criteria upon which the performance of the Employee shall be assessed shall consist of two components, Operational Performance and Competencies both of which shall be contained in the Performance Agreement; 5.6 The Employee’s assessment will be based on his performance in terms of the outputs/outcomes (performance indicators) identified as per attached Performance Plan, which are linked to the KPAs, and will constitute 80% of the overall assessment result as per the weightings agreed to between the Employer and Employee; 5.7 The Competencies will make up the other 20% of the Employee’s assessment score. The Competencies are spilt into two groups, leading competencies (indicated in blue on the graph below) that drive strategic intent and direction and core competencies (indicated in green on the graph below), which drive the execution of the leading competencies. Strategic direc on and leadership People management Program and project management Financial management Change leadership Governance leadersip Moral competence Planning and organising Analysis and innova on Knowledge and informa on management Communica on Results and quality focus

  • Synchronization, Commissioning and Commercial Operation 5.1.1 The SPG shall give PGVCL at least thirty (30) days’ advanced preliminary written notice and at least fifteen (15) days’ advanced final written notice, of the date on which it intends to synchronize the Solar Power Project to the Grid System. 5.1.2 Subject to Article 5.1.1, the Power Project may be synchronized by the SPG to the Grid System when it meets all the connection conditions prescribed in applicable Grid Code then in effect and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 5.1.3 The synchronization equipment and all necessary arrangements / equipment including RTU for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPG at its generation facility of the Power Project at its own cost. The SPG shall synchronize its system with the Grid System only after the approval of synchronization scheme is granted by the head of the concerned substation/ and checking/verification is made by the concerned authorities of the PGVCL. 5.1.4 The SPG shall immediately after each synchronization/tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. In addition, the SPG will inject in-firm power to grid from time to time to carry out operational/ functional test prior to commercial operation. For avoidance of doubt, it is clarified that Synchronization / Connectivity of the Project with the grid shall not to be considered as Commissioning of the Project. 5.1.5 The SPG shall commission the Project within nine (9) Months from the Date of execution of this PPA. Declaration of COD shall be certified by the commissioning committee. 5.1.6 The Parties agree that for the purpose of commencement of the supply of electricity by SPG to PGVCL, liquidated damages for delay etc., the Scheduled Commissioning Date as defined in this Agreement shall be the relevant date.