Test and Inspection Clause Samples

Test and Inspection. 7.1 PI shall conduct incoming inspection of the WAFERS, by WAFER TYPE, to determine the WAFERS’ conformance to the COMMON SPECIFICATIONS. The PCM DATA specified in Section 6.5 is required for the incoming inspection of the WAFERS and the omission, inaccuracy or other defect in the PCM DATA will in itself be sufficient cause to reject the WAFERS. This inspection shall be regarded as final in terms of quality, quantity and other conditions of the WAFERS supplied to PI subject to SUPPLIER’s warranty as defined in Section 11.1. All WAFERS passing the incoming inspection will be accepted by PI. 7.2 PI shall notify SUPPLIER which of the WAFERS have been accepted by PI within [***] ([***]) business days after receipt of the WAFERS by ▇▇. Should PI fail to notify SUPPLIER within the said [***] ([***]) business days, the WAFERS shall be deemed to have been accepted by PI. PI will owe SUPPLIER payment only for the quantity of WAFERS that have been accepted by PI. 7.3 SUPPLIER shall not be held responsible for the defects and failures of the WAFERS which are attributable to the design, test and assembly by PI of the PRODUCTS. 7.4 SUPPLIER shall not be held responsible for the defects, failures and yield problems of the WAFERS if the WAFERS meet the specifications set forth in the COMMON SPECIFICATIONS. 7.5 SUPPLIER may make a written special waiver request to PI to ship WAFERS that do not comply with the COMMON SPECIFICATIONS. If PI approves such special waiver request in writing, which approval may include special terms and conditions, SUPPLIER may ship such non-complying WAFERS under such terms and conditions.
Test and Inspection. (a) By Toshiba. Toshiba will supply to NMI, with each Wafer shipment, ---------- process control monitor ("PCM") test results, actual Wafer sort data results, and visual quality inspection results as agreed by the parties. Toshiba will sort Wafers and "user repair" the DRAM module prior to shipment on the DRAM portions of the die.
Test and Inspection. 7.1 PI shall conduct incoming inspection of the WAFERS, by WAFER TYPE, to determine the WAFERS’ conformance to the COMMON SPECIFICATIONS. The PCM DATA specified in Section 6.5 is required for the incoming inspection of the WAFERS and the omission, inaccuracy or other defect in the PCM DATA will in itself be sufficient cause to reject the WAFERS. This inspection shall be regarded as final in terms of quality, quantity and other conditions of the WAFERS supplied to PI subject to OKI’s warranty as defined in Section 11.1. All WAFERS passing the incoming inspection will be accepted by PI. 7.2 PI shall notify OKI which of the WAFERS have been accepted by PI within **** (****) business days after receipt of the WAFERS by PI. Should PI fail to notify OKI within the said **** (****) business days, the WAFERS shall be deemed to have been accepted by PI. PI will owe OKI payment only for the quantity of WAFERS that have been accepted by PI. 7.3 OKI shall not be held responsible for the defects and failures of the WAFERS which are attributable to the design, test and assembly by PI of the
Test and Inspection. 24.1 The Contractor shall at its own expense carry out at the place of manufacture and/or on the Site all such tests and/or inspections of the Plant and any part of the Facilities as are specified in the Contract.
Test and Inspection. (a) BY ST. ST shall supply to Tripath, with each shipment of Products, PCM test results, actual Process data results, visual quality inspection results, and wafer sort results, if applicable.
Test and Inspection. 9.1 Testing equipment and personnel
Test and Inspection. All test and inspection results of the Company have provided to any government agency pursuant to any government contract or any subcontract or as a part of the delivery to the government of any article designed, engineered or manufactured by the Company were true, complete and correct. Except as set forth in Schedule 4.8(b), the Company has provided all test and inspection results to government agencies as required by law or pursuant to government contracts or subcontracts, or may have been required as part of the delivery of any article designed, engineered or manufactured by the Company.
Test and Inspection. 12.1 OKI shall conduct E-test and visual inspection according to the Common Specification before the delivery of the Wafers of the PI Products. 12.2 PI shall conduct incoming inspection according to the Common Specifications. This inspection shall be regarded as final in terms of quality, quantity and other conditions of the Wafers supplied to PI. 12.3 PI shall notify OKI of the result of the inspection within forty (40) days after the date of the relevant air way ▇▇▇▇ regarding shipment from OKI. Should PI fail to so notify within said forty (40) day period, the shipment lot shall be deemed to have been acceptable by PI. 12.4 If the Wafers failed the incoming inspection described in Section 12.2 above, PI shall notify OKI in writing the reason of such failure with the result as provided in Section 12.3 above. Both parties shall discuss to agree upon resolution thereof, including without limitation, replacement of the Wafers, and any other reasonable means. [*] IDENTIFIES REDACTED MATERIAL DELETED PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION 12.5 OKI shall not be held responsible for the defects and failures which are attributable to PI, including without limitation, the design, test or assembly by PI of the Wafers.
Test and Inspection. 5.1 Inspection of the equipment will be done at hospital. 5.2 The vendor shall demonstrate all the features of the equipment mentioned in the technical specification. 5.3 The vendor is solely responsible for installation, system operational at hospital
Test and Inspection. Inspection of the equipment will be done at THQ Hospital Burewala.