The Infrastructure Sample Clauses

The Infrastructure. 7.2.1 COKM will install Infrastructure (to be owned, operated and maintained by COKM) as required to provide Electric Service to each section and/or Customer meter location within the Site. The distribution facilities will be designed and constructed to allow for the best availability of service on each lot within the development, and in such a manner as to provide a high level of reliability and service quality for the end user. 7.2.2 The Infrastructure may include, but is not limited to, poles, primary wire, secondary cables, secondary pedestals, conduits, pad mounted and pole mounted transformers, switchgear, and metering equipment as needed to provide Electric Service. Installation of the Infrastructure will be according to construction plans prepared by COKM and approved by the Developer prior to installation. Electric Service construction plans will be subject to COKM construction standards, applicable law, National Electric Safety Code, and regulations of entities with regulatory authority. 7.2.3 COKM will install the Infrastructure according to a schedule mutually acceptable to both parties. Each party agrees to negotiate in good faith to establish a commercially reasonable schedule for installation of the Infrastructure within the Site. ▇▇▇▇ agrees to use good faith efforts to meet deadlines and construction schedules set forth by the Developer. 7.2.4 In the event that COKM is not allowed by the Developer to begin construction of the Infrastructure within ninety (90) calendar days of the execution of this Agreement, or COKM is requested to halt construction of the approved Infrastructure by the Developer for a cumulative of more than thirty (30) calendar days after construction has commenced; at COKM’s sole discretion, this Agreement will become null and void and any unused portion of the Contribution will be reimbursed to the Developer; and a new Agreement, cost estimate and Infrastructure design will be required. 7.2.5 COKM will use its reasonable best efforts, subject to good engineering practice, standard electric utility construction practices, National Electric Safety Code, and regulations of entities with regulatory authority, to meet Developer requirements regarding the placement of Infrastructure, street lights, meter bases, etc. to enhance the aesthetics of the project.

Related to The Infrastructure

  • Infrastructure Modification of the location and/or sizing of the infrastructure for the Project that does not materially change the functionality of the infrastructure.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Connecting Transmission Owner’s Attachment Facilities Construction The Connecting Transmission Owner’s Attachment Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Connecting Transmission Owner and Developer agree on another mutually acceptable deadline, the Connecting Transmission Owner shall deliver to the Developer “as-built” drawings, relay diagrams, information and documents for the Connecting Transmission Owner’s Attachment Facilities set forth in Appendix A. The Connecting Transmission Owner shall not transfer operational control of the Connecting Transmission Owner’s Attachment Facilities and Stand Alone System Upgrade Facilities to the NYISO upon completion of such facilities.

  • Access Toll Connecting Trunk Group Architecture 8.2.1 If Reconex chooses to subtend a Verizon access Tandem, Reconex’s NPA/NXX must be assigned by Reconex to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center subtends as identified in the LERG. 8.2.2 Reconex shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from Reconex’s Customers. 8.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office Reconex utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the Tandem Verizon utilizes to provide Exchange Access in such LATA. 8.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow Reconex’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access tandem.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.