THE PIPELINE PROJECT AND TRANSPORTATION SERVICES Clause Samples

THE PIPELINE PROJECT AND TRANSPORTATION SERVICES. To enable the conversion of the IPP from coal to natural gas pursuant to the IPP Renewal Project, IPA requires a long-term arrangement with a natural gas transporter for a dedicated transportation solution (“Pipeline Project”) to ensure firm and consistent transportation services for the supply of natural gas from a designated trading hub or hubs on one or more integrated interstate or intrastate natural gas main pipelines (“Integrated Distribution System”) to a designated delivery point acceptable to IPA proximate to the IPP Gas Yard identified in Figure 2 (“Delivery Point”). The Pipeline Project requires, among other things, the design, permitting, construction, commissioning (including providing interruptible natural gas transportation services during commissioning of the IPP Renewal Project), operation, and maintenance of a natural gas pipeline lateral and associated interconnection facilities and metering stations necessary to deliver up to 140,000 Dth/day of natural gas to the Delivery Point, including necessary operating permits and rights-of-way. In addition to the Pipeline Project, IPA requires interruptible natural gas transportation services on the Integrated Distribution System from a designated trading hub or hubs on the Integrated Distribution System with an interconnection to the Pipeline Project in quantities sufficient for the commissioning and startup of the Pipeline Project, commencing on the Commissioning Commencement Date (“Interruptible Transportation Services”); and primary firm natural gas transportation services on the Integrated Distribution System from a designated trading hub or hubs on the Integrated Distribution System with an interconnection to the Pipeline Project in order to deliver 140,000 Dth/day of natural gas to the Delivery Point, commencing on the Firm Transportation Service Date (“Firm Transportation Services”, and together with the Interruptible Transportation Services, “Transportation Services”). The Pipeline Project and the Transportation Services specifically exclude the supply of natural gas to the IGS.

Related to THE PIPELINE PROJECT AND TRANSPORTATION SERVICES

  • Transportation Services i) In the event that transportation services for a student served by CONTRACTOR pursuant to an Individual Services Agreement are to be provided by a party other than CONTRACTOR or the LEA or its transportation providers, such services shall be reflected in a separate agreement signed by the parties hereto, and provided to the LEA and SELPA Director by the CONTRACTOR. Except as provided below, CONTRACTOR shall compensate the transportation provider directly for such services, and shall charge the LEA for such services at the actual and reasonable rates billed by the transportation provider, plus a ten percent (.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall: • provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring; • perform all terminations; and • supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Transport Services Upon the conclusion of such multilateral negotiations, the Parties shall conduct a review for the purpose of discussing appropriate amendments to this Agreement so as to incorporate the results of such multilateral negotiations.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.