Time-Varying GPS and Propensity Process Clause Samples

Time-Varying GPS and Propensity Process. Inclusion of time-varying covariates in the ▇▇▇ PH model allows for the evaluation of the GPS at the time of treatment and the entire Propensity Process from the baseline to the time of treatment, and hence the removal of selection bias due to unbalanced time-varying covariates. The model, pre- sented in equation (3.4), incorporates both the covariates that are measured at baseline and remain static over time (X1), as well as those that have repeated measurements over time (X2(t)). hT V (t|X(t)) = h0(t)exp .βT X1 + β X2(t)Σ . (3.4) ^ ^ We denote the parameter estimates by βT V,1 and βT V,2. We use model (3.4) with time-dependent covariates to define the estimated GPS and the estimated Propensity Process for matching. For subject i, the estimated GPS is defined as the the linear predictor of this model evaluated at the time of treatment, ^ ^ i. e., GPSIP,i = ▇^▇ ▇,▇▇▇ + ▇^▇ ▇,▇▇▇(▇▇,▇) and the estimated Propensity Process ˆ PPi = {θi(t) = βT V,1X1 + βT V,2X2(t); t ∈ [0, TZ,i]}, is the full functional pro- cess from baseline until time of treatment. Computation of these propensity scores is not straightforward. First, the time-dependent covariates X2(·) are often not measured at time of treatment for treated individuals. Secondly, untreated individuals within the risk set are unlikely to have covariate mea- surements at the exact time of treatment for their potential treated match. Thus, within the matching process, all individuals are subject to interpolation of the covariate value at a specific time by a model that estimates the covariate process over time. To estimate or interpolate the covariate process, we model each time- dependent covariate using a mixed model with both fixed and random effects of the time variable. This allows a predictive curve to be fit for the covariate process of each individual from baseline until the end of follow-up, thereby providing values for each covariate over the continuous support of the follow up time. For individual i (i = 1, . . . , n) at times tij (j = 1, . . . , mi), the model for covariate k (k = 1, . . . , p2) in X2,i is given in equation (3.5). X(k)(tij) = µ(k)(tij) + ν(k)(tij) + s(k), (3.5) 2,i i ii where µ(k)(·) is the population average nonparametric curve (i.e., the fixed effect), ν(k)(·) is the subject-specific curve (i.e., the random effect), and s(k) are independent random errors. To estimate µ(k)(·) and ν(k)(·), we can use the approach of basis expansion, that is, write µ(k)(·) = b(·)T γ(k) and ν(k)(·) =...

Related to Time-Varying GPS and Propensity Process

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Crane Erection & Jumping (a) Cranes and man/material hoists may be erected, altered, climbed and dismantled during times when ordinary production works are in progress subject to the work being done in full compliance with a relevant operational safety zone (OSZ) plan which has been developed specifically for that operation with consideration to overall site safety. (b) The crane crew for each tower crane (Crane Crew) must consist of the following: (i) crane driver; and (ii) three (3) dogmen. (c) In addition to the appropriate tickets held by the crane driver and the dogmen, the following high risk licences must be held amongst the Crane Crew: (i) rigging; and (ii) material handling. (d) Where a Project consists of a single Crane Crew, the Employer should endeavour to ensure another member of the Crane Crew holds a crane driver licence.

  • Procurement Project not financed with EU Funds The procurement is covered by the Government Procurement Agreement (GPA): yes

  • Completion of Concrete Pours and Emergency Work (a) Except as provided in this sub-clause an Employee shall nor work or be required to work in the rain. (b) Employees shall not be required to start a concrete pour in Inclement Weather. (c) Where a concrete pour has been commenced prior to the commencement of a period of Inclement Weather Employees may be required to complete such concrete pour to a practical stage and for such work shall be paid at the rate of double time calculated to the next hour, and in the case of wet weather shall be provided with adequate wet weather gear. (d) If an Employee’s clothes become wet as a result of working in the rain during a concrete pour the Employee shall, unless the Employee has a change of dry working clothes available, be allowed to go home without loss of pay. (e) The provisions of clauses 32.7(c) and 32.7(d) hereof shall also apply in the case of emergency work where the Employees concerned and their delegates agree that the work is of an emergency nature and can start and/or proceed.

  • Loss Leader; Recycled Products Contractor shall not sell or use any article or product as a “loss leader” as defined in Section 17030 of the Business and Professions Code. If Contractor will sell to the Judicial Council, or use in the performance of this Agreement, goods specified in PCC 12207 (for example, certain paper products, office supplies, mulch, glass products, lubricating oils, plastic products, paint, antifreeze, tires and tire-derived products, and metal products), then with respect to those goods: (i) Contractor shall use recycled products in the performance of this Agreement to the maximum extent doing so is economically feasible, and (ii) upon request, Contractor shall certify in writing under penalty of perjury, the minimum, if not exact, percentage of post consumer material as defined in the PCC 12200, in such goods regardless of whether the goods meet the requirements of PCC 12209.