TSM/TDM Only Alternative. The TSM/TDM Only Alternative involved the use of TSM/TDM measures as a “stand alone” alternative to the proposed SR-11, ▇▇▇ and CVEF facilities, and would have either constructed a new ▇▇▇ with TSM/TDM measures without SR-11, or incorporated TSM/TDM measures at existing regional POEs only. The TSM/TDM Only Alternative was evaluated, and based on the rejection of the Local Road Alternative and anticipated increase in cross-border traffic volumes, it was determined that the TSM/TDM Only Alternative would not meet the project need and purpose. The TSM/TDM Only Alternative was not considered to be a viable option and was not carried forward for impact analysis in the Tier II Draft EIR/EIS.