Work Activity Clause Samples

Work Activity. Activity Number:
Work Activity. Each participant will agree with their supervisor on the objectives to be accomplished during the telecommuting period. Attachment "B" to this agreement shall include the method of measuring productivity.
Work Activity. To document instructional excellence or excellence in Core work activity, Probationary Faculty submit the following required elements: • Core work activity evaluation from trained Vice President of Academic Affairs or designee • Core work activity evaluation from trained Faculty Chair/Program Director or designee • Core work activity observation and feedback from peer(s) • Results from Student Evaluation Forms (or Participant Evaluation Forms for faculty who do not work directly with students) • Narrative demonstrating a personal reflection on their effectiveness in core work activities in light of the evaluations, observations, and feedback During Probationary Years 1 and 2, evaluations and observations will be completed once per semester. During Probationary Years 3 through 5, evaluations and observations will be completed once per year. (Article 17.1)

Related to Work Activity

  • WORK ACCESS The Association shall provide a current, written list of its Association Representatives to all heads of departments, offices, or bureaus represented herein and the CAO. The Association shall be responsible for keeping the list current. An Association Representative shall have access to department, office, or bureau facilities where Unit members are employed during regular working hours to assist employees covered under this MOU in addressing grievances when such Association assistance is requested by a grievant(s) or to investigate matters arising out of the application of the provisions of this MOU. The Association Representative shall request authorization for such visits by contacting the designated Management representative of the head of the office, department, or bureau. In the event immediate access cannot be authorized, the designated Management representative shall inform the Association Representative as to the earliest time when access can be granted. This Article shall not be construed as a limitation on the power of the head of a department, office, or bureau to restrict access to areas designated for security or confidential purposes.

  • Project Work PURCHASER shall complete the following projects in accordance with the specifications provided in Exhibits B, C, D, E, and F and written instructions from STATE. Project locations are shown on Exhibit A unless otherwise described. PURCHASER shall furnish all material unless otherwise specified.

  • Outside Work All work necessary to the assembling, installation, erection, operation, maintenance, repair, control, in- spection and supervision of all electrical apparatus, devices, wires, cables, supports, insulators, conduc- tors, ducts and raceways when part of distributing systems outside of buildings, railroads and outside the directly related railroad property and yards. In- stalling and maintaining the catenary and trolley work on railroad property, and bonding of rails. All underground ducts and cables when they are in- stalled by and are part of the system of a distrib- uting company, except in power stations during new construction, including ducts and cables to adjacent switch racks or substations. All outdoor substations and electrical connections up to and including the setting of transformers and the connecting of the secondary buses thereto. Outside work to include renewable electrical energy sources such as solar photovoltaic, geothermal, wind, biomass, wave, etc., and other distributed en- ergy installations such as fuel cells, microturbines, etc.

  • PROJECT ACTIVITIES This Grant Agreement is for the Foundational Year only. Subsection 1. Continuous SIA Plan Implementation (a) Increasing instructional time, which may include: (A) More hours or days of instructional time; (B) Summer programs; (C) Before-school or after-school programs; or (D) Technological investments that minimize class time used for assessments administered to students. (b) Addressing students’ health or safety needs, which may include: (A) Social-emotional learning and development; (B) Student mental and behavioral health; (C) Improvements to teaching and learning practices or organizational structures that lead to better interpersonal relationships at the school; (D) Student health and wellness; (E) Trauma-informed practices; (F) School health professionals and assistants; or (G) Facility improvements directly related to improving student health or safety. (c) Reducing class sizes, which may include increasing the use of instructional assistants, by using evidence-based criteria to ensure appropriate student-teacher ratios or staff caseloads. (d) Expanding availability of and student participation in well-rounded learning experiences, which may include: (A) Developmentally appropriate and culturally responsive early literacy practices and programs in prekindergarten through third grade; (B) Culturally responsive practices and programs in grades six through eight, including learning, counseling and student support that is connected to colleges and careers; (C) Broadened curricular options at all grade levels, including access to: (i) Art, music and physical education classes; (ii) Science, technology, engineering and mathematics education;

  • Specific Activities Please give detailed information about the specific activities of the Project promoter and the Partner(s), with budget allocations 7.1 The main tasks of [name of the Project Promoter], referred to as the ‘Project Promoter’, are summarized as follows: Name Project activities Project budget 1 .... [mention the budget allocated to Project Promoter for the respective activity] EUR.... Activity 2 .... EUR... 7.2 The main input/responsibilities of [name of the Project Partner(s)], referred to as Partner 1, 2, etc., are summarized as follows: Name Project activities Project budget Partner 1... [briefly present the project activity implemented by Partner]. Activity 1 .... [mention the budget allocated to Partner 1 for the respective activity] EUR.... Activity 2 .... EUR... Name Project activities Project budget