WORK BY CONTRACTOR. The Contractor shall perform the work described in the Scope of Work, which is attached hereto as Attachment "A" and by this reference is incorporated herein.
WORK BY CONTRACTOR. 3.4.1 All portions of the Work on the Project shall be performed by the lowest responsible and responsive bidder under Subcontracts with the Contractor. The Contractor shall request and receive sealed proposals from Subcontractors and Subcontracts will be awarded after the proposals are reviewed by the Architect, the Contractor and the Owner and approved by the Owner. The Contractor may submit a sealed proposal for any portion of the Work. The proposals shall include the amount of profit and overhead that the Subcontractor would require on Change Orders. The Contractor shall furnish to the Owner copies of Notices of Award and of all Subcontracts, fully executed, within one (1) week after execution.
3.4.2 If the Owner refuses to accept a Subcontractor recommended by the Contractor, the Contractor shall recommend an acceptable substitute and the Guaranteed Maximum Price, if applicable, shall be increased or decreased by the difference in cost occasioned by such substitution and an appropriate Change Order shall be issued.
WORK BY CONTRACTOR. Replace the entire paragraph with the following: The following percentages shall be added to the Contractor’s costs and shall constitute the markup for overhead and profit, and all other costs not specifically provided for on work performed by the Contractor: Labor 20% Materials 15% Equipment Rental 15% Other Items and Expenditures 15% The Labor markup shall be applied to the total costs established in 7-4.2.1. To the sum of the costs and markups provided for in this subsection, 1 percent shall be added as compensation for bonding.
WORK BY CONTRACTOR. Furnish all labor, materials, equipment, and supervision related to and necessary for the Demolition of the existing floor plan for the Community Center as depicted in Exhibit(s) “A – C” attached hereto and incorporated herein by reference. Furnish all labor, materials, equipment, and supervision related to and necessary for the design and construction of a new floor plan for the Community Center. In addition to the aforementioned, the requirement(s) for RFP 24-04 include, but shall not be limited to, the following:
1. The contractor shall be responsible for applying for and obtaining all necessary permits.
2. The contractor shall submit all drawings, designs, and plans to the Town of Dundee for approval.
3. The contractor shall submit a material list to the Town of Dundee for approval.
4. The contractor shall provide for a safe and secure work site that doesn’t allow pedestrians to enter onto the work site (e.g., fencing, barricades, etc.).
5. The contractor shall haul and remove all construction debris daily.
6. The contractor shall satisfy all requirements prescribed by the Code of Ordinances of the Town of Dundee and/or Town of Dundee Land Development Code which includes, but shall not be limited to, obtaining all necessary approvals prior to mobilization.
WORK BY CONTRACTOR. DELETE in its entirety and SUBSTITUTE with the following:
WORK BY CONTRACTOR. The Parties contemplate that the Contractor will be paid directly by the Agency consistent with the terms of such construction contract. The Construction Manager shall not make direct payment to Contractor.
WORK BY CONTRACTOR. 4.3.1. Provide all tools, equipment, labor, materials and consumables not provided by OWNER, and supervision to complete the following: site survey; installation of erosion control devices; site clearing; topsoil removal and stockpile; site grading; site preparation; offsite disposal of spoils deemed contaminated at predetermined disposal location; pipe assembly, welding, bending and installation; trench and backfilling; installation of all mechanical equipment; record drawing development; access road construction; final site grading; final site surfacing; installation of fences; equipment painting; the installation of topsoil and final seeding for all disturbed areas impacted by construction activities as required by the SWPPP (Appendix C); and Contract drawings (Appendix A). Restoration of all disturbed
WORK BY CONTRACTOR. The following percentages shall be added to the Contractor's costs and shall constitute the markup for all overhead and profits: