Interconnection System Upgrades definition
Examples of Interconnection System Upgrades in a sentence
Notwithstanding any other provision of this Agreement, nothing herein shall be construed as a relinquishment or foreclosure of any rights to transmission credits to which Generator may be entitled, now or in the future, as a result of, or otherwise, associated with, the transmission capacity, if any, created by the Interconnection System Upgrades, if any.
Manitoba Hydro Interconnection Facilities and Interconnection System Upgrades shall be owned by Manitoba Hydro.
Subject to Articles 5.6.1 and 5.6.2, each Party shall diligently pursue all rights, easements, permits, licenses, certificates and properties necessary to construct, own and maintain its portion of the Interconnected Facilities and the Interconnection System Upgrades.
All expenses associated with such transfer shall be at Generator’s cost and shall be a part of the cost of Interconnection System Upgrades and delineated in Appendix B.
The L▇▇▇ Interconnection Facilities and Interconnection System Upgrades must be sufficient, as designed and built, to deliver the full capacity output of the Facility (not to exceed 614 MW) to the Interconnection Point and to enable the Facility to receive capacity necessary to satisfy its initial operational requirements (not to exceed 20 MW of capacity).
Manitoba Hydro shall use Reasonable Efforts to design, procure, construct, install, and test the Manitoba Hydro Interconnection Facilities and Interconnection System Upgrades in accordance with the schedule set forth in Appendix A, which schedule may be revised from time to time by mutual agreement of the Parties.
Generator shall also assign to First Amended and Restated Interconnection Agreement between El Paso Electric Company and Public Service Company of New Mexico 12 EPE, that portion of Generator’s rights under the Bureau of Land Management (“BLM”) Right of Way NMNM102630 (“BLM 102630 R-O-W”) for the land underlying the Interconnection System Upgrades and the portion of the EPE Interconnection Facilities delineated as TRACT 3 on Appendix F.
The actual cost of the L▇▇▇ Interconnection Facilities, Protective Equipment, and Interconnection System Upgrades shall be incurred in accordance with Good Utility Practice.
EPE may, in its sole discretion, retain or dispose of any EPE Interconnection Facilities and Interconnection System Upgrades, provided that in either case Generator shall pay any applicable Termination Costs.
Likewise, each First Amended and Restated Interconnection Agreement between El Paso Electric Company and Public Service Company of New Mexico 16 Party shall promptly notify the other Party in writing when the construction of the Interconnection System Upgrades is complete.