Site Utilities means improvements and infrastructure that facilitate the distribution and collection of public utility services, including water facilities, fire hydrants, sanitary sewer facilities and stormwater facilities (including catchment, conveyance, treatment and storage facilities such as tanks and ponds), each to the extent identified, depicted, and specified in the Plat, as applicable, and the Infrastructure Plans. CITY OF SAINT ▇▇▇▇ DEPARTMENT OF HUMAN RIGHTS AND EQUAL ECONOMIC OPPORTUNITY ▇▇▇▇▇ ▇▇▇▇▇▇▇▇, Director
Site Utilities has the meaning set forth in Section 2.1(a)(ii).
Site Utilities. Site utility work will consist of the following: Storm Drainage Storm Water from the Shop/Office Area roofs will be collected by roof sumps which will then carry runoff through interior roof conductors to an underground storm drainage system. Paved and landscaped areas will be contoured and sloped to permit positive surface drainage into a system of underground storm sewers which will be connected into an existing storm drain in Technology Drive. Storm Drain piping inside the building will be PVC. Storm Drain piping outside the building will be RCP (Reinforced Concrete Pipe). Underdrains will be provided at each catch basin for positive sub grade drainage. The Storm Drain system will consist of the following approximate quantities.

Examples of Site Utilities in a sentence

  • Rider B-2 Code Analysis A SFM required distinct phase Rider B-1 Demo Site mobilization Can be combined with Site Grading and Utilities Rider B-1 Site Grading and Site Utilities Phases may be combined, but not further split.

  • Site Utilities Provide all sewer, gas, water, storm drain, electrical, telephone and cable television services as required stubbed inside building.

  • Site Utilities Provide all sewer, gas, water, storm drain, electrical, telephone and cable television services as required.

  • Exhibit A-1 Preliminary review An early schematic phase advisory review with OFS/OSFM and/or DSA-AC Exhibit A-2 Fire & panic Safety Code Analysis Fire & Panic Safety Code Review and Fire & Panic Safety Peer Reviews for OFS for delegated OSFM review (to be only used at the direction of and by OFS) Exhibit A Demo Site mobilization Can be combined with Site Grading and Utilities Exhibit A Site Grading and Site Utilities Phases may be combined, but not further split.

  • In any conflict between the Statement of Work and Attachment 1b: “ATST Civil, Site Utilities, Foundations, and Utility Building Package” (Construction Specifications Specification, (latest Revision)” the Statement of Work shall govern.

  • Outline Specifications for Site Development, Site Utilities, Architectural, Structural, Mechanical, Plumbing, Fire Protection, Electrical, Lighting, Controls, Security, Telecommunications, Audio-Visual, Acoustical elements, Signage, and other applicable categories, etc.

  • Neither NYTP nor the Port Authority is obligated to alter, improve, remediate or otherwise perform any work or undertake any obligation with respect to the Site, Utilities: [*] Compliance With Laws: The access to, and installation, maintenance and operation of, all Carrier Equipment and all other improvements at the Site must at all times be in strict compliance with all technical standards and all applicable federal, state and local laws, ordinances, and regulations.

  • The Owner agrees to construct all Site Utilities and Electrical Work within the Subject Lands to the satisfaction of the Township and the appropriate Utility Company and in accordance with Schedule “B” Site Plan, approved design drawings prepared by ▇▇▇▇▇▇▇▇▇▇▇▇ + Joffe Inc.

  • Deliverable: Provide Site Utilities plans for City review and comments.

  • DESCRIPTION TENANT LANDLORD ----------- ----------- ------ -------- AND TENANT 1 Earthwork and Site Utilities Received prior to Date of October 14, 1996 this Lease 2 Building Shell October 7, 1996 October 21, 1996 3 Warehouse Finishes November 4, 1996 November 18, 1996 4 Office Finishes (including January 20, 1997 February 3, 1997 Landscaping Plans) The Design Plan Package No. 1 shall be prepared by M-E Civil Engineering, Inc.


More Definitions of Site Utilities

Site Utilities. Provide a 2" water tap in the street with a 2" copper water service to 5' outside the building footprint. This will provide maximum flexibility for future tenant needs by only having to purchase a 1 1/2" water tap with the shell construction, while maintaining the underground capacity for either a 1 1/2" or a 2" remote water meter. A 1 1/2" remote water meter has been provided. - Install an 8" fire service into the building fire riser room. - Install two new fire hydrants. Install a 4" sanitary sewer service from the street to 5' outside the building footprint. - Install two 18" diameter storm sewer taps, pipe and outlet structures at the detention pond. Install riprap run-down channel as designed. - Install two 15" diameter storm sewer outlet pipes from each truck dock directly to each detention pond. Connect the interior roof drain system over the warehouse area directly into an inlet in each truck dock area to drain the roof area through the 15" pipe to the detention ponds. - Provide concrete flowfill backfill material at all street cuts including a minimum of 9" full depth asphalt patch in the street per City of Louisville standards. - The owner will pay water and sanitary sewer tap fees direct. TESTING/QUALITY ASSURANCE: - Field surveying and layout to be provided by a Registered Colorado Surveyor. - Terracon, acting as an independent testing agency, will be retained by the contractor on behalf of the owner and contractor to take samples as needed for testing of soils compaction and moisture, concrete flatwork, and asphalt to assure quality control and that the specifications have been met. - Test results will be forwarded directly to the owner, contractor's office and jobsite office trailer. Unless requested by the owner, sidewalks, curb and gutter, and the light pole bases will not be tested. - Reinforced interior/exterior concrete pad footings designed with maximum soils bearing pressure of 2000psf, and a minimum of 600psf minimum dead load. - Spread footings & poured-in-place retaining walls at the exterior loading docks. - Concrete strength for foundation pads to be a minimum of 3000psi, 28 day, compressive strength. - Sack and rub all poured-in-place concrete exposed to view prior to painting. TILT-UP CONCRETE EXTERIOR WALLS: - 71/4" reinforced concrete wall panels complete with reveals and insets to receive stone veneer after lifting. 36 - Concrete strength for tilt-up panels to be a minimum of 4000psi, 28 day, compressive strength. - Rub and p...

Related to Site Utilities

  • Water utility means a public utility as defined in

  • Public utilities means those utilities defined in sections 4905.02, 4905.03, 4907.02, and 4907.03 of the Revised Code; in the case of a foreign corporation, it means those utilities defined as public utilities by the laws of its domicile; and in the case of any other foreign issuer, it means those utilities defined as public utilities by the laws of the situs of its principal place of business. The term always includes railroads whether or not they are so defined as public utilities.

  • Maintenance area means any geographic region of the United States previously designated nonattainment pursuant to the CAA Amendments of 1990 and subsequently redesignated to attainment subject to the requirement to develop a maintenance plan under §175A of the CAA, as amended.

  • Building Contractor means, subject to paragraphs (4) and (5), a person carrying on any business in the building or construction industry;